402-404 N VIA ROMA (4)Permit Types
BLD ELE MEG PLM
X
Permit Number: BLD2022-05358
Issued: 11/10/2022
www. anaheim.net/bu i Iding
(714)765.4626
Quarter Section: 141
Site Address: 402-004 N VIA ROMAANAHEIM, CA 92806
Legal Description: N TR 7802 BLK LOT 97
APN: 26819212
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove existing material to install (20) sq of composition shingles over entire building (402 and 404)
Living Area: Number of Stories: 2 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklared:
Cool Roof: Total Fees paid for Permit
People Associated with Project:
Permit Applicant Luis Rios
Owner GEDE BAGUS ANAK-AGUNG 404 N VIA ROMA
21.990.00
WA
341,86
Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Qty,
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
P�PHEIM �q<
Cityof Anaheim o� ono
Building Division ?
• DVNDED t8q^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install sub0oor or pour Floor slab until the follwing applicable items have been
Building Final 714 765-5153
g ( )sioned
Last Inspection -Final Only After Above Completed
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor S
(Sheathing/ iaphragm/Frame)
Ma einf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing iOnly after Plbg Ere Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec 8. Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service