Loading...
271 S RIVERWOOD CIR (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-02005 Issued: 05/09/2022 www.anaheim.net/building (714)7654626 Quarter Section: 197 CITY OF ANAHEIM Site Address: 271 S RIVERWOOD CIR, ANAHEIM, CA 92807 Legal Description: N TR 9206 BLK LOT 4 APN: 35626115 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: EV-Charger: Install new level-2 EV-Charger in garage. Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stories- People Associated with Project: Permit Applicant Lynn Nguyen Owner WIRTH JOSEPH J 5 JENNIFER S 271 S RIVERWOOD CIR �� 5 q Z2 0 Valuation: coo Construction Types: N/A Occupancy Groups: Fire Sprinklered: Toul Faaa paid for Permit: 167.00 Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures City EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�'til mj Cq< Cityof Anaheim oQ iO Building Division F z > _ DLNDED tsa Do not occupy this building until the final inspections have been made. FINAL, INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final r` _ Mechanical Final Cross Connection Control (714) 76 0' ^ � 4 E-, + Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 76 0 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Lle.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor ha,kfillunless sinned off) (F)o not Sewer Water Engineering Backflow, (Testable Only) Water Service