Loading...
971 S RIM CREST DRPermit Types BLD ELE MEC PLM X X Permit Number: BLD2021-02511 Issued: 06/04/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 216 Site Address: 971 S RIM CREST DR Legal Description: CITY OF ANAHEIM vIV IC'.r;'J 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Photovoltaic System: Remove and reinstall previously approved solar system. REF: BLD2018-01006 Valuation: $10,000.00 Construcion Types: N/A, , Total Fees paid for Permit: 200.30 People Associated with Project: Owner LUCILLE NOBLE 971 S RIM CREST DR ANAHEIM CA 92807-4538 Contractor SEMPER SOLARIS CONSTRUCTION INC 10713 NORWALK BLVD SANTA FIE SPRINGS CA 90670 0000 Permit Applicant SANTO ANDREWS Type Electrical Fixtures City Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Miscellaneous Items 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. r,"11-rr- P�pHEIM �.qC City of Anaheim ���\ Building Division > • �obpo Eo te`'^� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final PERMIT Mechanical Final INS P ET�Q Cross Connection Control (714) i EC Engineering Final (714) 765.5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-504 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub LIsVBus. Lic. (714) 765-5194 (Allow 10 business days) SetbacWFormslrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been q.nnAd Building Final (714 765-5153) Last Inspection -Final Only After Abevc- Com p;eted Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been sigrn_ Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service