Loading...
912 S RIDGECREST CIR (2)Permit Types BLD ELE MEC PLM X X X X Permit Number: BLD2022-01304 Issued: 03/25/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 216 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714)765. 5153 Site Address: 912 S RIDGECREST CIR, ANAHEIM, CA 92807 Legal Description: N TR 8516 BLK LOT 28 APN: 36519328 Project Description: Residential Remodel: Bathroom remodel replace bath tube with Tile with associated plumbing, electrical, and mechanical. 300 sq it of new exterior stucco. Living Area: Number of Stones: 0 Valuation: 15,000.00 Garage Area: Construction Types: NIA Carport Area: occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cml Roof: Total Faee pail for Parmk: 346.95 People Associated with Project: Contractor TARGET HOME DESIGN INC 12439 MONGOLIA BLVD #122 NORTH HOLLYWOOD. CA 91607 Permit Applicant 2ohar Haykeen Owner GHAFFARI FOROOGH 912 S RIDGECREST CIR Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures City Receptacle, switches, lights 3 Bath Tub 1 Ventilation Fan - <= 300 cfm on single duct 1 Lavatory Water Closet The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�r,HEIM CqC City of Anaheim o� io Building Division >l i OVA'DED �g5 / Do not occuov this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final -� Z Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concre!e ,nl.l the following applicable items have been signed. Fire Dept. Final (714) 765-5041 PFRNAI I PwbiREi[) Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 , Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (All o 1 i ess a s ' Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above 6d r�lele� . S Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have sinnedbeen 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) KAT,-Ijw Rough Duct (Mechanical) Rough Mechanical ZFqIA Rough Electrical 3 2-1 Uz VAPLIAW Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath 4 y ZL Exterior Lath W 21 'p, Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) h `2 j-'Air-A T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service