912 S RIDGECREST CIR (2)Permit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2022-01304
Issued: 03/25/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 216
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
1714)765. 5153
Site Address: 912 S RIDGECREST CIR, ANAHEIM, CA 92807
Legal Description: N TR 8516 BLK LOT 28
APN: 36519328
Project Description: Residential Remodel: Bathroom remodel replace bath tube with Tile with associated plumbing, electrical, and
mechanical. 300 sq it of new exterior stucco.
Living Area: Number of Stones:
0 Valuation: 15,000.00
Garage Area:
Construction Types: NIA
Carport Area:
occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cml Roof:
Total Faee pail for Parmk: 346.95
People Associated with Project:
Contractor TARGET HOME DESIGN INC
12439 MONGOLIA BLVD #122 NORTH HOLLYWOOD. CA 91607
Permit Applicant 2ohar Haykeen
Owner GHAFFARI FOROOGH
912 S RIDGECREST CIR
Type Electrical Fixtures Oty Type
Plumbing Fixtures City Mechanical Fixtures City
Receptacle, switches, lights 3 Bath Tub
1 Ventilation Fan - <= 300 cfm on single duct 1
Lavatory
Water Closet
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�r,HEIM CqC
City of Anaheim o� io
Building Division >l i
OVA'DED �g5 /
Do not occuov this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
-� Z
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concre!e ,nl.l the following applicable items have been signed.
Fire Dept. Final (714) 765-5041 PFRNAI
I PwbiREi[)
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
,
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (All o 1 i ess
a s '
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned
Building Final (714 765-5153)
Last Inspection -Final Only After Above 6d r�lele� .
S
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
sinnedbeen
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
KAT,-Ijw
Rough Duct (Mechanical)
Rough Mechanical
ZFqIA
Rough Electrical
3 2-1 Uz
VAPLIAW
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
4 y ZL
Exterior Lath
W 21
'p,
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
h `2
j-'Air-A
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service