733 N RESH STPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2024-06111
Issued: 11/20/2024
www. a na helm. net/building
(714)765-0626
Quarter Section: 61
Site Address: 733 N RESH ST, Anaheim, CA 92805
Legal Description: N TR 1233 ELK LOT 15
APN: 03434116
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 -5153
Project Description: Residential Remodel: Remove and install (24) sq of composition shingles over the entire house and (5) sq for the
detached garage with 200amp circuit upgrade
Living Area: Number of stories: 1 Valuation:
Garage Area: construction Types:
carport Area: Occupancy Groups:
Balcony / Deck Area, Fire Sprinklered:
Cool RoofTotal Fees paid for Forms:
People Associated with Project:
Permit Applicant Eduardo Venegas
Owner VENEGAS, EDUARDO S 8 LUPE 733 N RESH ST
�Z
2.700A0
N/A
494.35
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oly
Meter/Disc Sw - Under 600 V, up to 200 1
amps
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PHEIM (.qC
Cityof Anaheim OF Tg
Building DIVISIOn F y
>
-
�pUNp Eo �e��
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
a$
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION I
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisVBus. Lic. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
JCOAJMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-alab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sipped
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill urfleeg sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service