Loading...
733 N RESH STPermit Types BLD ELE MEC PLM X X Permit Number: BLD2024-06111 Issued: 11/20/2024 www. a na helm. net/building (714)765-0626 Quarter Section: 61 Site Address: 733 N RESH ST, Anaheim, CA 92805 Legal Description: N TR 1233 ELK LOT 15 APN: 03434116 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 -5153 Project Description: Residential Remodel: Remove and install (24) sq of composition shingles over the entire house and (5) sq for the detached garage with 200amp circuit upgrade Living Area: Number of stories: 1 Valuation: Garage Area: construction Types: carport Area: Occupancy Groups: Balcony / Deck Area, Fire Sprinklered: Cool RoofTotal Fees paid for Forms: People Associated with Project: Permit Applicant Eduardo Venegas Owner VENEGAS, EDUARDO S 8 LUPE 733 N RESH ST �Z 2.700A0 N/A 494.35 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oly Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIM (.qC Cityof Anaheim OF Tg Building DIVISIOn F y > - �pUNp Eo �e�� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final a$ Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) JCOAJMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-alab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sipped list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill urfleeg sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service