Loading...
879 N REDONDO DR W (7)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-01272 Issued: 03/16/2023 www.anaheim. net/building (714)765-4626 Quarter Section. 61 CITY OF ANAHEIM Site Address: 879 N REDONDO DR W , ANAHEIM, CA 92801 Legal Description: N TR 1460 BLK LOT 14 APN: 03405307 vs Project Description: Mechanical to Replace furnace and (8) ducts BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Living Area: Numbero(Stones: 0 Valuation: 0.00 Garage Area: Construction Types: NIA CarportArea: Occupancy Groups: Balcony I Deck Area: Fire Sprinkiered: Coal Roof: Total Fees pald for Permit: 287.00 People Associated with Project: Contractor SERVICE CHAMPIONS PLUMBING HEATING &A 3150 E BIRCH ST200205291032294650 BREA, CA 92821 Permit Applicant David Jackson Owner ESPINOZA SANDRA R TR 879 N REDONDO DR W Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City Heating Appliances, including vent 1 Residential Registers 8 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PaPNE1M C7< Cityof Anaheim D4 iO Building Division f Z > �oVNDED ibti^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Z Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Filing, Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed' Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not barkfiI(tmIPqs sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service