223 W HAMPSHIRE AVE (4)Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD202640592
Issued: 02/05/2025
www.anaheim.net/building
(714)765-4626
Quarter Section: 85
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
NP,HEIM C
' �1
O
t
Site Address: 223 W HAMPSHIRE AVE ANAHEIM, CA 92805
Legal Description: N TR 1653 BLK LOT 7
APN: 03628003 - - -
-
s
Project Description: Patio Cover: 304 sq. ft. attached aluminum patio cover with electrical.
Uving Area: Number of Stories:
0 Valuation:
10,000.00
Garage Area:
construction Types
VB
CarportArea:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit:
425.33
People Associated with Project:
Contractor DI-LAR INDUSTRIAL SUPPLY INC DBA L J HAU 1571 PARKWAY LOOP STE CABCDE 11138981 TUSTIN, CA 92780
Permit Applicant Ronald Cull
Owner NGUYEN, LARRY LUYEN 1711 IRVINE AVE
Type Electrical Fixtures Cry Type Plumbing Fixtures
Qty Mechanical Fixtures
Cry
Receptacle, switches, lights 4
The permit shall expire by limitation and become null and void lithe building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNEIM
Cityof Anaheim FPN H���
O Or
Building Division F 2
>
FOVNDEO v5
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
3 ;113121
W r
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signeC.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
.�innpd
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
-
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mec. & Fire)
1A
�
r t r .n �
Insulation (Sound/Energy)
De not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service