Loading...
425 S RAMONA ST (4)Permit Types BLD ELE MEC 4�il X Permit Number: BLD2025-00346 Issued: 01/23/2025 www. anaheim.net/building (714)765-4626 Quarter Section: 40 Site Address: 425 S RAMONA ST ANAHEIM, CA 92804 Legal Description: N TR 2369 BLK LOT 68 APN: 12816407 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Remove and install (25) sq of composition shingles over the house with attached garage and (5)sq of flat roof Living Area: Number of Stones: 1 Valuation: 16.000.00 Garage Area: construction Types: N/A Carport Area: Occupancy Groups; Balcony / Deck Area: Fire Spnnklereo: Cool Roof: Total Fees paid for Permit: Woe People Associated with Project: Contractor ROOFING DIVISION INC 8812 W PIPCO BLVD LOS ANGELES, CA Permit Applicant Emily Batioff 800 Hopper Ave. Santa Rosa, CA 95403 Owner TRAN, AN HAD THI TR THE A 621 S NEPTUNE ST Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. City of Anaheim PNp1{EIM C—C O o� i Building Division i > • ADVNDED tmh1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7665126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 76550411 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been i Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildina Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) �^1 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechaniral) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service