Loading...
5610 E CALLE CANADA (4)Permit Types BLD ELE MEC PLM . X Fermit Number: BLD2022.05037 Issued: 10/21/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 180 CITY OF ANAHEIM Site. Address: 5610 E CALLE CANADAANAHEIM, CA 92807 Legalpesciiptli- N.TR_8672 BL'K�LOT 30 A P Ni 163201/1 Project Description: Residential EV Charger for Level 2 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Dedr Area: Fire Spdnldemd: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Permit Appil cant Adrian Martinez Owner WILLIAMS CHRISTOPHER S TR WILLIAMS STA 5610 E CALLE CANADA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pNEIM CqC City of Anaheim D� io Building Division F i u > DED �$�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities afe released Final Gas Test Electrical Final Z%�` c Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE T INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sionede Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been swoned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Canstruction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service RESIDENTIAL GUIDELINE FOR ELECTRICAL VEHICLE (EV) CHARGER INSTALLATION The purpose of this guideline is to assist homeowners and contractors in streamlining the permitting and installation process for home EV Charging Stations Thank you for considering the use of electricity as an alternative fuel source for your next vehicle. There are 2 basic types of EV Chargers for home use (Level 1 and Level 2). Level 1 Chargers are smaller units that plug directly into a standard 120 volt receptacle outlet. These types of Chargers typically require a longer period of time to recharge the vehicle. As long as the receptacle outlet being used to plug-in the Level 1 Charger is existing, there is no requirement to secure a permit from the Building and Safety Division. On the other hand, if you will be installing a new 120 volt receptacle outlet for the Charger, you will need to obtain a permit - but you will not need to provide any plans or electrical load calculations as would be required for the more powerful Level 2 type Charging systems. A Level 2 EV Charging system requires 240 volts and charges the vehicle much faster than a Level 1 Charger. Level 2 Charger installations require a permit from the City. In order to obtain the permit you will need to provide the City with some basic information to show that your existing electrical service can handle the added load. If a service upgrade is necessary, please contact the Utilities Department for the required "meter spot" report. What information do I need to provide the City in order to obtain the permit? The City of Anaheim has developed this "EV Charger Installation Guideline" in order to streamline the permit and installation process. In most cases, you or your contractor merely need to fill-in the blanks on this document, attach the manufacturer's installation instructions and Charger specifications, and submit it to the Building Division for an over-the-counter review and permit issuance, or complete the application online. If all of the information is provided and the proposal complies with the applicable codes, the review and approval process will only take a few minutes. Once the permit is issued the installation may begin. Upon completion of the installation, an inspection will need to be scheduled to inspect the work performed. The inspection request will need to be scheduled through the Anaheim Building Division and is requested and scheduled by the customer. Inspections are typically performed on the work day following your request for inspection. Please keep in mind that someone will need to be present during the inspection so that the Building Inspector can access the location of the EV Charger, which is typically located in the garage. Approval must also be granted by the Utilities Department for the EV Charger installation. Installing a level 2 EV Charging System often requires changes to building wiring and Utility electric services. Before installing charging equipment and associated infrastructure, talk to your EV manufacturer Page 1 of 5 Sep 2016 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax B837 www.anaheim.net/building for information about what you need to charge your vehicle. If separate Contractors are used for the infrastructure wiring and the EV installation, separate permits will be required for each portion. When installing your EV Charger, be sure to use a licensed Electrical Contractor whose license is current for electrical work. The Contractor shall follow the guidelines of the manufacturer and all necessary Code requirements. When mechanical ventilation is required for the EV Charger, an additional mechanical permit will be required. Why is the Electric Utility concerned about your EV Charger installation? Although an individual Level 2 EV Charger may have a negligible impact on the Public Utilities electric system, the combined effect of several EV Chargers in the same area could result in overloads on Utility secondary wires and transformers. It is crucial that the City of Anaheim be notified of any Level 2 Charger installations to ensure the Utility electrical system components are adequately sized to maintain high levels of service reliability. For more information, please contact the City of Anaheim's Public Utilities Department at 714-765-7438. This information can also be accessed on the Public Utilities webpage at www.anaheim.net or you can visit Public Utilities Electrical Engineering, located on the 7th floor at 201 South Anaheim Blvd., Anaheim, CA. 92805. LEVEL 2 ELECTRIC VEHICLE CHARGER - SERVICE LOAD CALCULATION INSTRUCTIONS: Review the list of electrical loads in the table below and check all that exist in the home (don't forget to include the proposed Level 2 EV Charger). For each item checked, fill-in the corresponding "Watts used" (refer to the "Typical Usage" column for wattage information), then add up all the numbers written in the "Watts Used" column. Write this number in the "Total Watts Used" box at the bottom of the table and proceed to the next page. Page 2 of 5 Sep 2016 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax B837 www.anaheim.net/buildinp "' EXISTING MAIN CIRCUIT BREAKER SIZE: 200 AMPS (Loads shown are rough estimates; actual loads may vary - for a more precise analysis, use the nameplate ratings for appliances and other loads and consult with a trained electrical professional). "'Alf Applicable 12 W "dsq'­r'I Lo TUusage IS tfs�Vsea _ g _R GENERAL LIGHTING AND RECEPTACLE OUTLET CIRCUITS 3 MUMythe t ts'ls%ft�:.5280 XW K 6f' h ZVI qu dqe3% ­ KITCHEN CIRCUITS X ht-"rcuft' 5- "a ;" � AS:_3000 .1" 0 _E(e."'4"filb a ec,,, riPsf py�" 4ilf, X igowdye -r 1300 X GQf 'NOom )000r 800 n' re _415 Xwashers1200 146 Rims thft h-14 n'-66' h" W.', r V 111,11.0, 500" LAUNDRY CIRCUIT X `'1400� 1500 X 00 5760 HEATING AND AIR CONDITIONING CIRCUITS ' healing,(gas) `-000 watts X,Central 'F 'i., i,_. - " , ". ffi ih� concl, 8424 wih C2 t W h";, Whouse . 1.001Y Ff R 6`ff 1106 if m amu, -A! 4L w -F -5 M00watts . OTHER ELECTRICAL LOADS ec nc�mt er-,'i X 6 R 1500 U 0 describe ELECTRIC VEHICLE CHARGER CIRCUIT Leel 2'Electric Vehicle Charger 111, X I 960 1 19110 plategrafling.1hVibiti (A 0 4kM or rculf (Add -up all of the wafts for the loads you have checked) 38,364 THE ISSUANCE OF THIS PI�WjQDfiY0jS USED PT 1 NOT AE2PRnVF VIO ION OF AN THE BUILDING CODES OF THE U I Y. THE HOLDER OF THIS PERMIT PROCEEDS AT HIS OWN RISK. OCT* 2"1 2022 BUILDING DIVISION OF ANAHEIM APPROVED Page 3 at 5 Sep 2016 200 S. Anaheim Blvd., Suite 145 An;ahp* All 0 (Fq 4)M5-5153 Phone (714)7654607 Fax B837 www.anaheim.net/buildinq i i I INSTRUCTIONS: Apply the Total Waifs Used number from the previous page to the table below to identify if the existing electrical service panel is large enough to handle the added electrical load from the proposed Level 2 EV Charger. If your electrical service is NOT large enough, then you will need to install a new upgraded electrical service panel. E�� TSize�ofExistin��g£240( TotrtalWaMsU:sedTotal;Watts'Used�✓✓CheckY J>. oU Electrical �� Before Ad ustments ervice�Panel F X' 3 ..�. ,✓ r ^q�' f. i&'� .� 4 .y ti � n` X �mw,v 200 y m...s .,: ZOO 63;040Q: X125 am P.s�: sm'`48OOl.`' �f6300�1�:to��78000'A `�,:1.50�am`'s _'108,001 ton=123®OQ�225am 's Please note that the size of your existing service must be equal to or larger than the minimum required size identified in the table above or a new upgraded electrical service panel will need to be installed (a separate permit is required for new service). Please note', that approval from the Utilities Department will be required for the installation of the new electrical service panel. I CAUTION: This table is NOT to be used to determine 4he size of a ,'NEW UPGRADED electrical service panel if your existing panel is too small or overloaded according to the table above. In order to determine the size of a NEW or UPGRADED service panel, there is a completely different load calculation methodology that applies. Sizing of a NEW or UPGRADED electrical service panel should only be done by a qualified Electrical Contractor or Electrical Engineer. i _ l . STATEMENT OF COMPLIANCE i By my signature, I attest -that the information provided is true and accurate. Job Address: 5610 E Calle Canada (Print job address) Signature: -49644"A,-49644"A,10/05/2022 (Signature of applicant) 4 (Date) Please note that this is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative methodology. Use of this electrical load calculation estimate methodology and forms is at the user's risk and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to seek professional assistance in determining the electrical Jcapacity of a service panel. - o- `�: �°8 �✓au � v it ��� i - PnnPdnf5 Sep 2016 200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5,153 Phone (714)7654607 Fax B837 www.anaheim.net%buildin-Q Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-05037 Issued: 10/21/2022 www.anaheim.net/building (714)7654626 Quarter Section: 180 Site Address: 5610 E CALLE CANADAANAHEIM, CA 92807 Legal Description: N TR 8672 BLK LOT 30 APN:36320111 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 WORKER'S COMPENSATION DECLARATION: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OR THE LABOR CODE. INTEREST, AND ATTORNEY'S FEES. I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to selfwInsure for worker's compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain worker's compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My worker's Compensation insurance carrier and policy are: Cartier. ACE AMERICAN INSURANCE COMPANY Policy No.: C511749030. Expiration Date: 10/1/2023 Name of Agent: Phone No.: I certify that In the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the worker's compensation laws of California, and agree that, N I should become subject to the worker's compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. 1;u 5;�71� Sh-n-&LW of Appll nt Date DECLARATION REGARDING CONSTRUCTION LENDING AGENCY: I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is Issued (Sec.3097.Civ.C): Lender's Name: Lenders Address: LICENSED CONTRACTOR'S DECLARATION: I hereby affirm under the penalty of Perjury that I am licensed under provisions of chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license Is in full force and effect. 4AdA Cdlitradlor Signature NUMBER EXPIRATION DATE LI jCENSE TYPE (Sl 933396 05/31/2022 C10 ID/ Date