2208 W. CORONET AVEPermit Types
BLD ELE MEC PLM
XX X X
Permit Number:BLD2019-06187
Issued:01/31/2020 CITY OF ANAHEIM
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section:30
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Site Address:2208 W CORONET AVE
Legal Description:
Project Description:Residential Addition:367 sq.ft addition to relocate kitchen with closet and convert existing kitchen to family
room.Work done prior to obtaining permit.REREF:INV2019-00186
Living Area:367 $15,000.00
VB,.
Valuation:
Construcion Types:
Fire Sprinklered?
Cool Roof
Total Fees paid for Permit:
No
No
2,303.95
People Associated with Project:
Engineer
Permit Applicant
BASIL F AMMARi 202 AMBLING DR BREA CA 92821
2208 W CORONET AVE ANAHEIM CA 92801RAMEZAMMARI
Electrical Fixtures Qty Type Plumbing Fixtures Qty Type QtyTypeMechanicalFixtures
Receptacle,switches,lights 20 Kitchen Sink
Garbage Disposal
Repair/Drainage AlterationA/ent Piping
Dishwasher
Washing Machine Rough
Water Distribution
1 Residential Registers
1 Ventilation Fan -<=300 cfm on single duct
1 Gas System (1-5 outlets)
1
2
1
1
1
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbld_permit_combo
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
-j/r^ko\-isoPlumbing(Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the foilwing applicable items have been
'^innofi Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed^^g_Plumbing (Ground/Underfloor Water)Vf
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
(llo nnt iinckfiil Ufiiosi.biuncd ofl
Sewer
Water Engineering Backflow (Testable Only)
Water Service