Loading...
Resolution-PC 2011-036RESOLUTION NO. PC2011 -036 A RESOLUTION OF THE ANAHEIM CITY PLANNING COMMISSION DETERMINING THAT CLASS 3 CATEGORICAL EXEMPTION IS THE APPROPRIATE ENVIRONMENTAL DOCUMENTATION AND APPROVING CONDITIONAL USE PERMIT NO. 2011 -05546 (DEV2011- 00005) (1765 WEST CERRITOS AVENUE) WHEREAS, the Planning Commission did receive a verified Petition for Conditional Use Permit No. 2011 -05546 to construct a 60 -foot tall flag pole telecommunications facility on an existing school property that exceeds the maximum height allowed by the code for certain real property in the City of Anaheim, County of Orange, State of California shown on Exhibit "A ", attached hereto and incorporated herein by this reference; and WHEREAS, this 39.71 -acre property is developed with a high school (Loara High School). The property is located in the Transitional zone and the Anaheim General Plan designates the property for School land uses; and WHEREAS, the Planning Commission did hold a public hearing at the Civic Center in the City of Anaheim on May 9, at 5:00 p.m., notice of said public hearing having been duly given as required by law and in accordance with the provisions of the Anaheim Municipal Code, Chapter 18.60, to hear and consider evidence for and against said proposed conditional use permit to investigate and make findings and recommendations in connection therewith; and WHEREAS, said Planning Commission, after due inspection, investigation and study made by itself and in its behalf, and after due consideration of all evidence and reports offered at said hearing with respect to the request to construct a 60 -foot tall flag pole telecommunications facility on an existing school property should be approved for the following reasons: 1. The proposed conditional use permit request to is properly one for which a conditional use permit is authorized by Anaheim Municipal Code Section 18.38.060.050.0511 (Antennas - Telecommunications). A telecommunications facility designed as flag pole with a height of 60 feet in the Transition (T) zone is properly one for which a conditional use permit is authorized. 2. The height of the telecommunications facility would not adversely affect the adjoining land uses or the growth and development of the area in which it is proposed to be located because the facility would be located approximately 54 feet from Cerritos Avenue, 1,029 feet from Euclid Avenue and 242 feet from the residential buildings to the west. 3. Alternative locations and designs were considered by the applicant; however there were no feasible locations to co- locate antenna facilities. 1 PC2011 -036 4. The traffic generated by the proposed flag pole telecommunication facility will not impose an undue burden upon the streets and highways designed and improved to carry the traffic in the area because the traffic generated by this use will not exceed the anticipated volumes of traffic on the surrounding streets and there is adequate parking on -site to accommodate the use. 5. The granting of the conditional use permit under the conditions imposed will not be detrimental to the health and safety of the citizens of the City of Anaheim because the telecommunications facility is an unmanned facility and would not pose a health or safety risk to the citizens of the City of Anaheim. WHEREAS, the proposed project falls within the definition of Categorical Exemptions, Section 15301, Class 3 (New construction or conversion of small structures) as defined in the State CEQA Guidelines, and is therefore, exempt from the requirement to prepare additional environmental documentation. NOW, THEREFORE, BE IT RESOLVED that the Anaheim City Planning Commission does hereby approve Conditional Use Permit No. 2011 -05546 and subject to the conditions of approval described in Exhibit "B" attached hereto and incorporated by this reference, which are hereby found to be a necessary prerequisite to the proposed use of the subject property in order to preserve the health, safety and general welfare of the Citizens of the City of Anaheim. Extensions for further time to complete conditions of approval may be granted in accordance with Section 18.60.170 of the Anaheim Municipal Code. Timing for compliance with conditions of approval may be amended by the Planning Director upon a showing of good cause provided (i) equivalent timing is established that satisfies the original intent and purpose of the condition (s), (ii) the modification complies with the Anaheim Municipal Code and (iii) the applicant has demonstrated significant progress toward establishment of the use or approved development. BE IT FURTHER RESOLVED, that this permit is approved without limitations on the hours of operation or the duration of the use. Amendments, modifications and revocations of this permit may be processed in accordance with Chapters 18.60.190 (Amendment to Permit Approval) and 18.60.200 (City - Initiated Revocation or Modification of Permits) of the Anaheim Municipal Code. BE IT FURTHER RESOLVED that the Anaheim City Planning Commission does hereby find and determine that adoption of this Resolution is expressly predicated upon applicant's compliance with each and all of the conditions hereinabove set forth. Should any such condition, or any part thereof, be declared invalid or unenforceable by the final judgment of any court of competent jurisdiction, then this Resolution, and any approvals herein contained, shall be deemed null and void. BE IT FURTHER RESOLVED that approval of this application constitutes approval of the proposed request only to the extent that it complies with the Anaheim Municipal Zoning Code and any other applicable City, State and Federal regulations. Approval does not include any action or findings as to compliance or approval of the request regarding any other applicable ordinance, regulation or requirement. - 2 - PC2011 -036 BE IT FURTHER RESOLVED that the applicant is responsible for paying all charges related to the processing of this discretionary case application within 15 days of the issuance of the final invoice. Failure to pay all charges shall result in the revocation of the approval of this application. THE FOREGOING RESOLUTION,rwas adopted at the Planning Commission meeting of May 9, 2011. ATTEST: STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ANAHEIM ) CHAIRMAN, A ' EIM CITY PLANNING COMMISSION S SENIOR SECRETARY, ANAHEIM CITY P1 TNNING COMMISSION I, Grace Medina, Senior Secretary of the Anaheim City Planning Commission, do hereby certify that the foregoing resolution was passed and adopted at a meeting of the Anaheim City Planning Commission held on May 9, 2011, by the following vote of the members thereof: AYES: COMMISSIONERS: AGARWAL, AMENT, FAESSEL, PERSAUD, RAMIREZ, SEYMOUR NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: KARAKI IN WITNESS WHEREOF, I have hereunto set my hand this 9 day of May, 2011. SENIOR SEdR TARY, ANAHEIM CITY PLANNING COMMISSION - 3 - PC2011 -036 7 1111 111 111 1111 11111.11 .11 IIII 1111111 IN - 1111 IN 11111111111 11111111111111 11111 I 11 11111 111 APNs: 128 -391 -01 128 -391 -08 1- Lrt O l EXHIBIT "A" DEV2011 -00005 ARP W Cyq�FT ■ Al � *Iii ■ 1272' 1256.40' W CERRITOS AVE Ill 1111111 111 11 111 11111111 1 11 1 1 111 111 11 11 I 11 11 -4 n 1 r Source: Recorded Tract Maps and /or City GIS. Please note the accuracy is +/- two to five feet. 11996 PC2011 -036 1 The proposed flag pole telecommunication facility shall be Planning limited to a maximum height of sixty feet. Said information shall be specifically shown on plans submitted for building permits. REVIEW SIGNED NO. CONDITIONS OF APPROVAL BY OFF BY PRIOR TO ISSUANCE OF A BUILDING PERMIT 3 GENERAL CONDITONS EXHIBIT `B" CONDITIONAL USE PERMIT NO. 2011-05546 (DEV2011- 00005) 2 The antennas and equipment cabling shall not be visible to Planning public view. All equipment cabling shall be routed inside of the structure and shall be underground. Said information shall be specifically shown on plans submitted for building permits. Any required relocation of City electrical facilities shall be at the property owner /developer's expense. Public Utilities Electrical 4 That the flag proposed for the site shall be maintained in Code good condition. In the event that a flag fades, rips, frays or Enforcement otherwise deteriorates, it shall be replaced immediately by a new flag. The size of the flag shall be in acceptable proportion to the flagpole. 5 The property shall be developed substantially in accordance Planning with plans and specifications submitted to the City of Anaheim by the applicant and which plans are on file with the Planning Department marked Exhibit No. 1 (Site Plan), Exhibit No. 2 (Enlarged Site Plan), Exhibit No. 3 and 4 (Architectural Elevations) and as conditioned herein. 5 PC2011 -036