2001-189RESOLUTION NO. 2001R-189
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ANAHEIM ADOPTING NEW FEE SCHEDULES FOR BUILDING AND
CONSTRUCTION.
WHEREAS, Section 15.02.070 of the Anaheim Municipal Code
authorizes the City Council to establish fees for permits,
inspections, re-inspections and other activities relating to the
Uniform Codes pertaining to the regulation of building and
construction activities; and
WHEREAS, the City Council wishes to adopt new fee schedules
for those building and construction activities; and
WHEREAS, the City Council has considered said proposed fees
at a public meeting notice of which has heretofore been given in the
manner required by Section 66016 of the Government Code and at which
meeting oral and written presentations were invited and considered
concerning said fee and service charge increases: and
WHEREAS, the City Council finds and declares that adoption
of this fee schedule is exempt from the provisions of the California
Environmental Quality Act pursuant to Section 21080(b(8) of the
Public Resources Code and California Code of Regulations Section
15273 in that the fees and rates are established to meet operating
expenses, including employee wage rates and fringe benefits;
purchasing or leasing supplies, equipment or materials; and
WHEREAS, the City Council further finds that the
hereinafter specified fees and services charges do not exceed the
estimated amount required to provide the service for which the fee or
service charge is levied.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Anaheim as follows:
1. The fees set forth in the following fee schedules shall
be, and the same are hereby, adopted:
Anaheim Building Code:
Building Permit Fees,
Attached as Exhibit A
Anaheim Electrical Code: Electrical Permit Fees,
Attached as Exhibit B
Anaheim Mechanical Code: Mechanical Permit Fees,
Attached as Exhibit C
Anaheim Plumbing Code: Plumbing Permit Fees,
Attached as Exhibit D
2. The fees established herein shall become effective
sixty (60) days following the date of adoption of this Resolution.
3. The fees established herein shall, upon the effective
date of said fees, supersede any previously adopted fees for the same
permit or approval.
4. The City Council hereby declares that should any one or
more fees established by this Resolution or any portion of this
Resolution be declared for any reason to be invalid, it is the intent
of the City Council that it would have adopted all other fees and
portions of this Resolution independent of the elimination herefrom
of any such fee or such portion as may be declared invalid.
THE FOREGOING RESOLUTION is approved and adopted by the
City Council of the City of Anaheim this 10th day of
2001.
ATTEST:
July
MAY~DR OF THE CITY OF~NAHEIM
CITY CL~K OF THE CITY OF ANAHEIM
40055.1/VPETER/May 2, 2001
2
EXHIBIT A
BUILDING PERMIT FEE SCHEDULE
TOTAL VALUATION
FEE
$1.00 to $1200.00
$31.00
$1,201.00 to $2,000.00
$31.00 for the first $1,200.00 plus $4.50 for each
additional $100.00 or fraction thereof, up to and including
$2,000.00
$2,001.00 to $25,000.00
$67.00 for the first $2,000.00 plus $13.25 for each
additional $1,000.00 or fraction thereof, up to and including
$25,000.00
$25,0001.00 to $50,000.00
$371.75 for the first $25,000.00 plus $9.65 for each
additional $1,000.00 or fraction thereof, up to and including
$50,000.0O
$50,001.00 to $100,000.00
$613.00 for the first $50,000.00 plus $6.65 for each
additional $1,000.00 or fraction thereof, up to and including
$100,000.00
$100,001.00 to $500,000.00
$945.50 for the first $100,000.00 plus $5.35 for each
additional $1,000.00 or fraction thereof, up to and including
$500,000.00
$500,001.00 to $1,000,000.00
$3,085.50 for the first $500,000.00 plus $4.50 for each
additional $1,000.00 or fraction thereof, up to and including
$1,000,000.00
$1,000,001.00and up
$5,335.00 for the first $1,000,000.00 plus $3.10 for each
additional $1,000.00 or fraction thereof
Plan Checking Fees: When the valuation of the proposed construction exceeds $1,000.00
and a plan is required to be submitted by Section 106.3.2 of the Building Code, the plan
checking fee shall be paid to the Building Official at the time of submitting plans and
specifications for checking:
Residential plan checking
80% of Building Permit Fee
Non-Residential plan checking 80% of Building Permit Fee
Repetitive Plan Review 50% of Plan Check Fee
(similar units after model fee is paid)
Where plans are incomplete or changed so as to require additional plan checking, an
additional plan check fee shall be charged at a rate established by the Building Official.
Other Inspections and Fees for all Permits and Uniform Codes:
Inspections outside of normal business hours for normal
working days (minimum charge 2 hours)
For weekend inspections
(minimum charge 4 hours)
Re-inspection fees assessed, inspections for which no fee is
specifically indicated (one hour minimum)
Additional plan review required by changes, additions or
revisions to approved plans (minimum charge - one hour)
Special Inspections and Investigative Inspections
Additional plan review required by changes,
additions or revisions to approved plans
(minimum charge - one hour)
For issuing each permit
Supplement to existing permit
Minimum permit fee
Temporary Utilities
Temporary Certificate of Occupancies
Appeal Board Application
51.50 per hour
51.50 per hour
51.50 per hour
51.50 per hour
51.50 per hour
51.50 per hour
25.00
15.00
41.00
160.00
215.00
480,00
EXHIBIT B
ELECTRICAL PERMIT FEES
NEW RESIDENTIAL, BUILDINGS:
New multi-family residential buildings (apartments, motels, hotels & condominiums)
per square feet ................................................................................. 047
New single and two family buildings per square foot ..................... 052
Garages, carports (attached or detached) parking structures per square foot .022
Other types of residential alterations, additions and modifications to existing
buildings refer to Unit Fee Schedule.
TEMPORARY POWER:
1. Temporary service pole or pedestal including meters ....................
2. Temporary sub poles including switches and outlets .....................
3. Temporary Trailer Inspection (Pre-Site) ........................................
23.70
23.70
51.50
UNIT FEE SCHEDULE:
RECEPTACLE, SWITCH, AND LIGHTING OUTLETS:
2.
3.
4.
5.
6.
First 20 outlets, switches, fixtures, each .......................................
Additional outlets, each ................................................................
Multi-outlet assemblies each 5' or fraction ...................................
Pole light and fixture .....................................................................
Each additional fixture ..................................................................
Theatrical type lighting fixtures, each ...........................................
1.40
.70
.70
1.40
1.40
1.40
RESIDENTIAL APPLIANCES:
For fixed residential appliances or receptacle outlets including wall mounted
electric ovens; counter mounted cooking tops; electric ranges; self-contained
room, console or through wall air conditioners; space heaters; food waste
grinders; dishwashers, washing machines; water heaters; clothes dryers; or
other motor operated appliances not exceeding one HP in rating, each ........
4.50
NOTE: For other types of air conditioners and motor driven appliances
having larger electrical ratings, see Power Apparatus.
NON RESIDENTIAL APPLIANCES:
For nonresidential appliances and self-contained factory wired appliances not
exceeding one horsepower (HP), kilowatt (KW) or kilovaoltampere (KVA), in rating
including medical and dental devices, food, beverage and ice cream cabinets,
illuminated show cases, drinking fountains, vending machines, laundry machines,
or other similar types of equipment each .......................................................
4.50
POWER APPARATUS (AS LISTED):
For motors, generators, transformers, rectifiers, synchronous converters, capacitors,
industrial heating, air conditioners and heat pumps, cooking or baking equipment and
other apparatus.
Up to and including I each ...................................................................
Over 1 and not over 10 each ..............................................................
Over 10 and not over 50 each ............................................................
Over 50 and not over 100 each ...........................................................
Over 100 and not over 500 each ........................................................
Over 500 each ....................................................................................
4.50
11.75
23.75
47.20
70.90
70.90
BUSWAYS:
For trolley and plug-in busways, each 100 feet or fraction thereof. .........
5.40
NOTE: An additional fee will be required for lighting fixtures, motors and other
appliances that are connected to trolley and plug-in type busways.
SIGNS, OUTLINE LIGHTING AND MARQUES:
2.
3.
4.
5.
6.
7.
One sign and one transformer ...............................................................
Additional sign and transformer per address ........................................
Additional transformers per sign ..........................................................
Additional circuits per sign ..................................................................
Alterations to existing signs .................................................................
Relocation of existing signs .................................................................
Time clocks, each .................................................................................
23.75
10.70
4.90
4.50
10.70
16.00
3.20
SERVICES/METERS/PANELS/DISCONNECT SWITCHES:
1. For services of 600 volt or less and not over 200 amps, each ..................
2. For services of 600 volt or less and over 200 amps and up to 500 amps, each
3. For services over 600 volts or over 1000 amps, each ...............................
29.30
57.25
118.70
MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS, ELECTRICAL
COMPONENTS FOR WHICH A PERMIT IS REQUIRED BUT FOR WHICH NO FEE IS HEREIN
SET FORTH:
1. Apparatus or equipment each ..................................................................... 17.50
2. Conduits and conductors for each 50 feet or fraction thereof. ................... 17.50
3. Private Street Lights .................................................................................. 19.20
4. Under floor raceways - each 100 feet or fraction thereof. .................. 10.70
EXHIBIT C
MECHANICAL PERMIT FEES
Heating appliances, including vent
Up to 100,000 BTU/H each ................................................................... 14.20
100,000 BTU/H and over each .............................................................. 17.50
2. Residential air circulation outlets (heating or cooling) each ................. 7.00
3. Commercial air distribution system (heating, cooling or ventilation)... 8.50
per 100 sq. ft. each
4. Combustion products vent (other than chimney and not included in ... 10.30
appliance permit) each
Factory built or metal chimney each ......................................................
Compressor or boiler to 3 HP (includes built-in window type air conditioners)
3- 15HP ...............................................................................................
Over 15 - 30 HP ....................................................................................
Over 30 - 50 HP ....................................................................................
Over 50 HP ...........................................................................................
10.30
14.20
25.80
35.60
52.60
88.25
7. Absorption Unit to 100,000 BTU/H ......................................................
100,001 to 500,000 BTU/H ...................................................................
500,001 to 1,000,000 BTU/H ................................................................
1,000,001 to 1,750,000 BTU/H .............................................................
Over 1,750,000 BTU/H .........................................................................
8. Air handling unit (heating, cooling or ventilation supply) up to 10,000 CFM each...
Over 10,000 CFM each ..................................................................................
9. Evaporative cooler (other than portable) each ................................................
10. Ventilation fans to 300 CFM on single duct (including dryer exhaust duct)each
11. Ventilation fans 301 CFM and over each .......................................................
12. Commercial hood (including ducts) each .......................................................
13. Heating or cooling coils (not part of factory assembled unit) each ................
(V.A.V. unit, cooling tower, evaporative or air cooled condenser)
14. Appliance or piece of equipment regulated by this code
but not specifically classed or listed each .......................................................
15. Gas system 1 to 5 outlets ..............................................................................
Gas system each additional outlet over 5 .......................................................
16. Fire Dampers each ..........................................................................................
17. Central Vacuum Systems each .......................................................................
18. Unlimited Gas Appliance ...............................................................................
14.20
25.80
35.60
52.60
88.25
10.30
17.30
10.30
7.00
10.30
21.40
13.20
10.30
5.30
1.40
10.30
10.30
47.20
EXHIBIT D
PLUMBING PERMIT FEES
UNIT FEE SCHEDULE:
1. Each plumbing fixture including water, drainage piping and backwater valve.
2. Each building SEWER and each trailer space sewer:
1st 100 feet ................................................................................
each additional 100 feet ............................................................
Abandonment/close sewer ................................................................................
Rainwater systems - (per drain inside building) ...............................................
Each private sewage disposal system ...............................................................
Each water heater and/or vent .................................................................................
4.
5.
6.
7.50
16.00
7.50
16.00
7.50
42.80
7.50
8.
9.
lO.
11.
12.
13.
14.
15.
16.
Gas-piping system of 1 to 5 outlets ..................................................................... 5.30
Each additional gas piping system outlet, per outlet ...................................... 1.40
Medical gas system of 1 to 5 inlets/outlets ......................................................... 51.50
Each additional medical gas inlets/outlets ............................................................ 5.30
Each industrial waste pretreatment interceptor including its trap and vent,
excepting kitchen-type grease interceptors functioning as fixture traps ................ 7.50
For each installation, alteration or repair of water piping and/or water treating
equipment ................................................................................................................ 7.50
For repair or alteration of drainage or vent piping, each fixture ............................ 7.50
For atmospheric-type vacuum breakers (Lawn Sprinklers):
1 to 5 ............................................................................................... 5.30
over 5 each ...................................................................................... 1.40
For each backflow protective device other than atmospheric type vacuum
breakers: 2 inch diameter and smaller ............................................................ 7.50
over 2 inch diameter ....................................................................... 16.00
Each building water service:
1st 100 ft ......................................................................................... 7.50
additional building water service, per 100 ft .................................. 7.50
MISCELLANEOUS FIXTURES (EACH):
1. Includes solar panels and solar tanks, water softener/water treatment equipment... 7.50
2. For each graywater system ....................................................................................... 51.50
3. For initial installation and testing for a reclaimed water system per hour ............... 51.50
4. Annual Cross-Connection Test ................................................................................ 51.50
SWIMMING POOL/SPA PIPING SYSTEMS:
1. Covers all pool piping & gas (one outlet) Does not cover pool solar ..................... 51.50
POOL/SPA FEES:
1. STRUCTURAL (per Exhibit A- valuation of work)
2. PLAN CHECK (65 % of No. 1 above) Not required for fiberglass spa
3. Pool/Spa Pre-Site Inspection & Plan Check ............................................................ 51.50
PLUMBING (includes all pool piping, except solar) One gas outlet, backwash lines, backwash
receptor/P-Trap, pool fill line and backflow protection ...................................... 51.50
ELECTRICAL:
Residential ............................................................................................................... 51.50
Commercial ............................................................................................................ 74.80
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, SHERYLL SCHROEDER, City Clerk of the City of Anaheim, do hereby certify that the foregoing
Resolution No. 2001R-189 was introduced and adopted at a regular meeting provided by law, of
the Anaheim City Council held on the 10th day of July, 2001, by the following vote of the members
thereof:
AYES:
MAYOR/COUNCIL MEMBERS: Feldhaus, Kring, Tait, McCracken, Daly
NOES:
MAYOR/COUNCIL MEMBERS: None
ABSENT:
MAYOR/COUNCIL MEMBERS: None
CIT~ CLERK ~)F THE CITY OF ANAHEIM
(SEAL)