Resolution-PC 2012-057RESOLUTION NO. PC2012 -057
A RESOLUTION OF THE ANAHEIM CITY PLANNING COMMISSION
DETERMINING THAT A CLASS 1 CATEGORICAL EXEMPTION
IS THE APPROPRIATE ENVIRONMENTAL DOCUMENTATION
AND AMENDING CONDITIONAL USE PERMIT NO. 2002 -04531
(DEV2012- 00074)
(1617 WEST LA PALMA AVENUE)
WHEREAS, on April 8, 2002, the Anaheim Planning Commission, by its
Resolution No. PC2002 -54, granted Conditional Use Permit No. 2002 - 04531, to permit a church
with an accessory child day care facility; and
WHEREAS, the Planning Commission did receive a verified Petition for
Conditional Use Permit No. 2002 -04531 A , as described below; and
WHEREAS, the applicant requests a Conditional Use Permit to permit the
expansion of an existing church to convert a second story deck and accessory living quarters into
classrooms, to convert a patio into an office, and the addition of a library and baptistery; and
WHEREAS, the subject property is developed with a church facility and is
located in the T (Transition) Zone, and the Anaheim General Plan designates this property for
General Commercial land uses; and
WHEREAS, the Planning Commission did hold a public hearing at the Civic
Center in the City of Anaheim on August 27, 2012, at 5:00 p.m., notice of said public hearing
having been duly given as required by law and in accordance with the provisions of the Anaheim
Municipal Code, Chapter 18.60, to hear and consider evidence for and against said proposed
amendment to conditional use permit and variance and to investigate and make findings and
recommendations in connection therewith; and
WHEREAS, said Planning Commission, after due inspection, investigation and
study made by itself and in its behalf, and after due consideration of all evidence and reports
offered at said hearing, does find and determine the following facts:
1. The proposed request to permit the expansion of an existing church is properly
one for which a conditional use permit is authorized by Anaheim Municipal Code Section
18.14.030.040.0402 (Community and Religious Assembly).
2. The proposed conditional use permit, as conditioned herein, would not adversely
affect the adjoining land uses and the growth and development of the area in which it is proposed
to be located the church will continue to operate in a consistent manner which is not detrimental
to the adjacent properties.
- 1 - PC2012 -057
3. The size and shape of the site for the use is adequate to allow the full development
of the proposed project in a manner not detrimental to the particular area or to the health and
safety because the facilities on the property will adhere to all required land use standards.
4. The traffic generated by the proposed project will not impose an undue burden
upon the streets and highways designed and improved to carry the traffic in the area because the
size of the church is proportionate to the property and will not increase the traffic in the area.
5. The granting of the conditional use permit and the variance under the conditions
imposed will not be detrimental to the health and safety of the citizens of the City of Anaheim as
the proposed project will be compatible with the surrounding area through conditions of approval
for the use and is not a health or safety risk to the citizens of the City of Anaheim.
WHEREAS, the proposed project falls within the definition of Categorical
Exemptions, Section 15301, Class 1 (Existing Facilities) as defined in the State CEQA
Guidelines, and is therefore, exempt from the requirement to prepare additional environmental
documentation.
NOW THEREFORE BE IT RESOLVED that the Planning Commission, for the
reasons hereinabove specified does hereby amend Conditional Use Permit No. 2002 -04531 to
permit the expansion of an existing church to convert a second story deck and accessory living
quarters into classrooms, to convert a patio into an office, and the addition of a library and
baptistery.
BE IT FURTHER RESOLVED that, except as expressly amended herein, the
provision of Resolution No. PC2002 -54, approving Conditional Use Permit No. 2002 - 04531,
shall remain in full force and effect.
BE IT FURTHER RESOLVED, that amendments, modifications and revocations
of this permit may be processed in accordance with Chapters 18.60.190 (Amendment to Permit
Approval) and 18.60.200 (City - Initiated Revocation or Modification of Permits) of the Anaheim
Municipal Code.
BE IT FURTHER RESOLVED that the Anaheim City Planning Commission
does hereby find and determine that adoption of this Resolution is expressly predicated upon
applicant's compliance with each and all of the conditions hereinabove set forth. Should any
such condition, or any part thereof, be declared invalid or unenforceable by the final judgment of
any court of competent jurisdiction, then this Resolution, and any approvals herein contained,
shall be deemed null and void.
BE IT FURTHER RESOLVED that approval of this application constitutes
approval of the proposed request only to the extent that it complies with the Anaheim Municipal
Zoning Code and any other applicable City, State and Federal regulations. Approval does not
include any action or findings as to compliance or approval of the request regarding any other
applicable ordinance, regulation or requirement.
-2- PC2012 -057
BE IT FURTHER RESOLVED that the applicant is responsible for paying all
charges related to the processing of this discretionary case application within 15 days of the
issuance of the final invoice. Failure to pay all charges shall result in the revocation of the
approval of this application.
THE FOREGOING RESOLUTION was adopted at the Planning Commission
meeting of August 27, 2012.
CHAIRMAN, ANAHEIM
ATTEST:
COMMISSION
SENIOR SECRETARY, ANAHEIM CITY PLANNING COMMISSION
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
1, Grace Medina, Senior Secretary of the Anaheim City Planning Commission, do
hereby certify that the foregoing resolution was passed and adopted at a meeting of the Anaheim
City Planning Commission held on August 27, 2012, by the following vote of the members
thereof:
AYES:. COMMISSIONERS: AGARWAL, BOSTWICK, FAESSEL, LIEBERMAN,
PERSAUD, RAMIREZ, SEYMOUR
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
IN WITNESS WHEREOF, I have hereunto set my hand this 27` day of August, 2012.
L�
SENIOR SECRETARY, ANAHEIM CITY PLANNING COMMISSION
-3- PC2012 -057
EXHIBIT " A "
DEV NO. 2012 -00074
APN: 271 - 031 -09
W GLEN AVE
n so mn
t
vt
U
W
J
❑ ❑ N DRESDEN ST
a
DRESDEN ST
216'
z
� � o
m m
N N
2
212' DRCS DEN ST
W LA PALMA AVE
z
w
0
w W DOGWOOD AVE
c
0
z
W FRANCES DR
Source: Recorded Tract Maps and /or City GIS.
Please note the accuracy is +/- two to five feet.
-4- PC2012 -057
W FRANCIS DR
EXMBIT `B"
AMENDMENT TO CONDITIONAL USE PERMIT NO. 2002-04531
(DEV2012- 00074)
-5- PC2012 -057
REVIEW
SIGNED
NO.
CONDITIONS OF APPROVAL
BY
OFF BY
PRIOR TO ISSUANCE OF A BUILDING PERMIT
1
Bumpers shall be installed in the trash enclosure.
Public Works,
Streets and
Sanitation
Division
2
The property owner shall irrevocably offer for dedication to
Public Works,
the City of Anaheim an easement 60 feet in width from the
Subdivision
centerline of La Palma Avenue for road, public utility and
Section
other public purposes.
3
If a fire line is required for fire sprinklers, a private water
Public
system with separate water service for fire protection and
Utilities,
domestic water shall be provided.
Water
Engineering
Division
4
That all backflow equipment shall be located above ground
Public
outside of the street setback area in a manner fully screened
Utilities,
from all public streets and alleys. Any backflow assemblies
Water
currently installed in a vault will have to be brought up to
Engineering
current standards. Any other large water system equipment
Division
shall be installed to the satisfaction of the Water Engineering
Division outside of the street setback area in a manner fully
screened from all public streets and alleys. Said information
shall be specifically shown on plans and approved by Water
Engineering and Cross Connection Control Inspector.
5
That all requests for new water services or fire lines, as well
Public
as any modifications, relocations, or abandonments of
Utilities,
existing water services and fire lines, shall be coordinated
Water
through Water Engineering Division of the Anaheim Public
Engineering
Utilities Department.
Division
6
That all existing water services and fire services shall conform
Public
to current Water Services Standards Specifications. Any water
Utilities,
service and/or fire line that does not meet current standards
Water
shall be upgraded if continued use is necessary or abandoned if
Engineering
the existing service is no longer needed. The owner /developer
shall be responsible for the costs to upgrade or to abandon any
Division
water service or fire line.
7
If a fire line is required for fire sprinklers, the
Public
developer /owner shall submit to the Public Utilities Water
Utilities,
Engineering an estimate of the maximum fire flow rate and
Water
maximum day and peak hour water demands for the project.
Engineering
-5- PC2012 -057
-6- PC2012 -057
This information will be used to determine the adequacy of the
Division
existing water system to provide the estimated water demands.
Any off -site water system improvements required to serve the
project shall be done in accordance with Rule No. 15A.6 of the
Water Utilit Rates, Rules, and Regulations.
8
There is no backflow prevention device on the existing 11/2-
Public
inch water meter serving the property. A lead -free, backflow
Utilities,
prevention assembly, meeting the City of Anaheim's
Water
standards shall be installed prior to issuance of building
Engineering
permits.
Division
9
All new water services shall be installed from the existing
Public
public water main in La Palma Ave.
Utilities,
Water
Engineering
Division
ONGOING DURING PROTECT OPERATIONS
10
This property shall be developed substantially in accordance
Planning
with the plans, technical studies and specifications submitted
Department,
to the City of Anaheim by the applicant and as conditioned
Planning
herein, which include the Site Plan, Floor Plans and
Services
Elevation Plans (Exhibit Nos. 1 -3). Said plans and studies
Division
are on file in the Planning Department.
-6- PC2012 -057