Resolution-PC 2012-092RESOLUTION NO. PC2012 -092
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ANAHEIM APPROVING
TENTATIVE PARCEL MAP NO. 2012-144 AND
MAKING CERTAIN FINDINGS IN CONNECTION THEREWITH
(DEV2012- 00117)
(501 SOUTH WEST STREET)
WHEREAS, the Planning Commission of the City of Anaheim ( "Planning
Commission ") did receive a verified Petition for Tentative Parcel Map No. 2012 -144 to establish
a 3 -lot residential subdivision to allow the future development of three single - family homes on
that certain 0.54 -acre parcel of real property located at 501 South West Street in the City of
Anaheim, as generally depicted on Exhibit A attached hereto and incorporated herein by this
reference (the "Property"); and
WHEREAS, the Property is a vacant lot and is located in the T (Transitional)
zone. The Property is designated for Residential land uses in the City of Anaheim General Plan;
and
WHEREAS, on December 3, 2012, the Planning Commission did hold a public
hearing at the Civic Center in the City of Anaheim, notice of said public hearing having been
duly given as required by law and in accordance with the provisions of Chapter 18.60 of the
Anaheim Municipal Code, to hear and consider evidence for and against proposed Tentative
Parcel Map 2012 -144 to investigate and make findings and recommendations in connection
therewith; and
WHEREAS, as the "lead agency" under the California Environmental Quality Act
(Public Resources Code Section 21000 et seq.; herein referred to as "CEQA "), the Planning
Commission finds and determines that proposed Tentative Parcel Map 2012 -144 is within that
class of projects which consist of in -fill development meeting the conditions described in Section
15332 of Title 14 of the California Code of Regulations ( "CEQA Guidelines "). Specifically,
proposed Tentative Parcel Map 2012 -144 (a) is consistent with the applicable General Plan
designation and all applicable General Plan policies, as well as with applicable zoning
designation and regulations, (b) is no more than five acres in size substantially surrounded by
urban uses, (c) has no value as a habitat for endangered, rare or threatened species, (d) would not
result in significant effects relating to traffic, noise, air quality, or water quality, and (e) the
Property can be adequately served by all required utilities and public services. Accordingly,
pursuant to Section 15332 of the CEQA Guidelines , proposed Tentative Parcel Map 2012 -144
will not cause a significant effect on the environment and is, therefore, categorically exempt
from the provisions of CEQA; and
WHEREAS, the Planning Commission, after due inspection, investigation and
study made by itself and in its behalf, and after due consideration of all evidence and reports
offered at said hearing pertaining to the request to permit a three -lot residential subdivision for
the future construction of three single family homes on the Property, does find and determine the
following facts:
- 1 - PC2012 -092
1. That the proposed subdivision, including its design and improvements, is
consistent with the Low - Density Residential land use designation in the Anaheim General Plan
and the development standards contained in the RS -3 (Single - Family Residential) zone.
2. That the site is physically suitable for the type and density of the proposed
residential subdivision.
3. That the design of the subdivision is not likely to cause substantial environmental
damage or substantially and avoidably injure fish or wildlife or their habitat, as no sensitive
environmental habitat has been identified.
4. That the design of the subdivision or the type of improvements is not likely to
cause serious public health problems, since any new structures and associated site improvements
will be constructed on the property in compliance with Code requirements.
5. That the design of the subdivision or the type of improvements will not conflict
with easements, acquired by the public at large, for access through or use of property within the
proposed subdivision.
NOW, THEREFORE, BE IT RESOLVED that this Planning Commission does
hereby approve proposed Tentative Parcel Map No. 2012 -144, subject to the conditions of
approval described in Exhibit B attached hereto and incorporated by this reference, which are
hereby found to be a necessary prerequisite to the proposed use of the Property in order to
preserve the health, safety and general welfare of the citizens of the City of Anaheim.
Extensions for further time to complete conditions of approval may be granted in accordance
with Section 18.60.170 of the Anaheim Municipal Code. Timing for compliance with conditions
of approval may be amended by the Planning Director upon a showing of good cause provided
(i) equivalent timing is established that satisfies the original intent and purpose of the condition
(s), (ii) the modification complies with the Anaheim Municipal Code, and (iii) the applicant has
demonstrated significant progress toward establishment of the use or approved development.
BE IT FURTHER RESOLVED, that this permit is approved without limitations
on the hours of operation or the duration of the use. Amendments, modifications and revocations
of this permit may be processed in accordance with Chapters 18.60.190 (Amendment to Permit
Approval) and 18.60.200 (City - Initiated Revocation or Modification of Permits) of the Anaheim
Municipal Code.
BE IT FURTHER RESOLVED that the Planning Commission does hereby find
and determine that adoption of this Resolution is expressly predicated upon applicant's
compliance with each and all of the conditions hereinabove set forth. Should any such condition,
or any part thereof, be declared invalid or unenforceable by the final judgment of any court of
competent jurisdiction, then this Resolution, and any approvals herein contained, shall be
deemed null and void.
BE IT FURTHER RESOLVED that approval of this application constitutes
approval of the proposed request only to the extent that it complies with the Anaheim Municipal
Code and any other applicable City, State and Federal regulations. Approval does not include
any action or findings as to compliance or approval of the request regarding any other applicable
ordinance, regulation or requirement.
-2- PC2012 -092
BE IT FURTHER RESOLVED that the applicant is responsible for paying all
charges related to the processing of this discretionary case application within 15 days of the
issuance of the final invoice. Failure to pay all charges shall result in the revocation of the
approval of this application.
THE FOREGOING RESOLUTION was adopted at the Planning Commission
meeting of December 3, 2012. Said Resolution is subject to the appeal provisions set forth in
Chapter 18.60 ( "Zoning Provisions - General") of the Anaheim Municipal Code pertaining to
appeal procedures and may be replaced by a City Council Resolution in the event of an appeal.
CHAIR, ANAHEIM CITY PL G COMMISSION
ATTEST:
SENIOR SECRETARY, ANAHEIM CITY PLANNING COMMISSION
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, Grace Medina, Senior Secretary of the Anaheim City Planning Commission, do
hereby certify that the foregoing resolution was passed and adopted at a meeting of the Anaheim
City Planning Commission held on December 3, 2012, by the following vote of the members
thereof:
AYES: COMMISSIONERS: BOSTWICK, FAESSEL, LIEBERMAN, PERSAUD,
RAMI EZ, SEYMOUR
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: AGARWAL
IN WITNESS WHEREOF, I have hereunto set my hand this 3rd day of December, 2012.
t
SENIOR SECRETARY, ANAHEIM CITY PLANNING COMMISSION
-3- PC2012 -092
EXHIBIT "
DEV NO. 2012-00117
APN: 036- 091 -02
'z
0
D
D
a
V �Ep y � N
W 5A�.1Tp Np ST 12 5 ,
m
m
J
125
G
F
'riy! 9
y2 �'
r
F
�F
9L
F
W WpTEFSS
® o so ioo Source: Recorded Tract Maps and /or City GIS.
v
re.t Please note the accuracy is +/- two to five feet.
-4- PC2012 -092
EXHIBIT "B"
TENTATIVE PARCEL MAP NO. 2012 -144
(DEV2012- 00117)
NO.
CONDITIONS OF APPROVAL
REVIEW
SIGNED
BY
OFF BY
GENERAL
1
Subject property shall be developed, maintained and operated
Planning
substantially in accordance with plans and specifications submitted
to the City of Anaheim by the petitioner and which plans are on file
with the Planning Department marked Exhibit No. 1, and as
conditioned herein.
2
No driveway openings will be permitted on Santa Ana Street.
Planning
3
That all requests for new water services or fire lines, as well as any
Public
modifications, relocations, or abandonments of existing water
Utilities,
services and fire lines, shall be coordinated through Water
Water
Engineering Division of the Anaheim Public Utilities Department.
Engineering
4
That if this is an individual homeowner project with a landscaping
Public
area (including pools or other Water features) exceeding 5,000
Utilities,
square feet, a Landscape Documentation Package, a Certification of
Water
Completion and a separate irrigation meter shall be installed in
Engineering
compliance with Chapter 10.19 of Anaheim Municipal Code and
Ordinance No. regarding water conservation.
5
That all existing water services and fire services shall conform to
Public
current Water Services Standards Specifications. Any water service
Utilities,
and/or fire line that does not meet current standards shall be
Water
upgraded if continued use is necessary or abandoned if the existing
Engineering
service is no longer needed. The owner /developer shall be
responsible for the costs to upgrade or to abandon any water service
or fire line.
6
That individual water service and/or fire line connections will be
Public
required for each parcel or residential, commercial, industrial unit
Utilities,
per Rule 18 of the City of Anaheim's Water Rates, Rules and
Water
Regulations.
Engineering
7
All fire services 2 -inch and smaller shall be metered with a UL
Public
listed meter, Hershey Residential Fire Meter with Translator
Utilities,
Register, no equals.
Water
Engineering
PRIOR TO ISSUANCE OF BUILDING PERMIT
8
Prior to approval of permits for improvement plans, the property
Public
owner /developer shall coordinate with Electrical Engineering to
Utilities,
establish electrical service requirements and submit electric system
Electrical
plans, electrical panel drawings, site plans, elevation plans, and
Engineering
related technical drawings and specifications.
-5- PC2012 -092
NO.
CONDITIONS OF APPROVAL
REVIEW
SIGNED
BY
OFF BY
9
If required, prior to connection of electrical service, the legal owner
Public
shall provide to the City of Anaheim a Public Utilities easement
Utilities,
with dimensions as shown on the approved utility service plan.
Electrical
Engineering
10
Prior to connection of electrical service, the legal owner shall submit
Public
payment to the City of Anaheim for service connection fees.
Utilities,
Electrical
Engineering
11
Prior to connection of any sewer lateral and prior to final building
Public Works
and zoning inspections, the developer shall repair the existing sewer
Development
main within the frontage of the project to the satisfaction of the City
Services
Engineer.
12
Prior to issuance of a grading permit, the recordation of a Save
Public Works
Harmless in -lieu of Encroachment Agreement is required for any
Development
private storm drains connecting to a City storm drain.
Services
13
Prior to issuance of a building permit, the developer shall submit to
public Works
the Public Works, Development Services the required street
Development
improvement plans. The plans shall include the installation and
Services
construction of landscape, irrigation, street lights, storm drain and
sewer improvements. The landscape and irrigation improvement
plans shall be prepared in accordance with the City Master Street
Tree Plan for Arterial Corridors, and Public Works Landscape and
Irrigation Manual for Public Street and Highway. The irrigation
shall be connected to the on -site water supply and a bond shall be
posted to guarantee the construction of all public works
improvements.
14
All public improvements shall be completed by the developer and
Public Works
accepted by the City prior to final building and zoning inspections.
Development
Services
PRIOR TO PARCEL MAP APPROVAL
15
Prior to parcel map approval, the developer shall irrevocably offer to
Public Works
dedicate to the City of Anaheim a corner cut -off as an easement for
Development
road, public utility and other public purposes.
Services
16
The parcel map shall be submitted for review and approval to the
Public Works
City of Anaheim and the Orange County Surveyor and then shall be
Development
recorded in the Office of the Orange County Recorder.
Services
-6- PC2012 -092