Resolution-PC 2013-011RESOLUTION NO. PC2013 -011
A RESOLUTION OF THE ANAHEIM CITY PLANNING COMMISSION
DETERMINING THAT A PREVIOUSLY - APPROVED MITIGATED NEGATIVE
DECLARATION, TOGETHER WITH MITIGATION MONITFORING PROGRAM NO. 156
AND THE UPDATED AND MODIFIED MITIGATION MONITORING PROGRAM NO.
156A, SERVE AS THE APPROPRIATE ENVIRONMENTAL DOCUMENTATION AND
AMENDING FINAL SITE PLAN NO. 2008 -00004
(TRACKING NO. FSP2008- 00004B)
(1820 SOUTH HARBOR BOULEVARD)
WHEREAS, on March 2, 2009, the Planning Commission of the City of Anaheim (herein
referred to as the "Planning Commission ") adopted its Resolution No. PC2009 -039 for the
approval of a Final Site Plan to construct a nine -story, 252 -room hotel with 75,593 square feet of
accessory uses for certain real property located at 1820 South Harbor Boulevard in the City of
Anaheim, County of Orange, State of California, as generally depicted on the map attached
hereto as Exhibit A and incorporated herein by this reference (the "Original Project'); and,
WHEREAS, on March 31, 2009, the City Council of the City of Anaheim adopted
Resolution No. 2009 -059 granting Final Site Plan No. 2008 -00004 for the Original Project; and,
WHEREAS, Final Site Plan No. 2008 -00004 was approved in connection with General
Plan Amendment No. 2008 - 00470, Amendment No. 13 to the Anaheim Resort Specific Plan
(SPN2008- 00055), Amendment No. 4 to the Anaheim Resort Public Realm Landscape Program
(Miscellaneous No. 2009 - 00297), Conditional Use Permit No. 2009 - 05403, Variance No. 2008-
04761 and Public Convenience or Necessity No. 2009 -00056 (collectively, the "Original
Entitlements "); and,
WHEREAS, on July 16, 2012, the Planning Commission approved a request to extend the
time to comply with the conditions of approval for the Original Entitlements, including Final Site
Plan No. 2008 - 00004, by two years to March 31, 2014 (herein referred to and designated as
"Final Site Plan No. 2008- 00004A "); and,
WHEREAS, the Planning Commission did receive a verified petition to further amend
Final Site Plan No. 2008 -00004 (hereinafter referred to "Final Site Plan No. 2008- 00004B ") to
reflect revised plans to construct a 5- story, 252 -room hotel with 28,647 square feet of accessory
uses; and,
WHEREAS, the Planning Commission did hold a public hearing at the Civic Center in
the City of Anaheim on January 28, 2012, at 5:00 p.m., notice of said public hearing having been
duly given as required by law and in accordance with the provisions of Chapter 18.60 of the
Anaheim Municipal Code, to hear and consider evidence for and against said proposed Final Site
Plan No. 2008- 00004B and to investigate and make findings and recommendations in connection
therewith; and,
WHEREAS, the Planning Commission has reviewed the proposed Final Site Plan No.
2008- 00004B and has considered the Mitigated Negative Declaration and the associated
Mitigation Monitoring Program No. 156, which were approved by the Planning Commission and
the City Council in connection with the approval of the Original Entitlements, together with the
1 - PC2013 -011
Updated and Modified Mitigation Monitoring Program No. 156A in the form presented at this
meeting, and finds and determines that (i) said environmental documentation is adequate to serve
as the appropriate environmental documentation in connection with this request and satisfies all
the requirements of the California Environmental Quality Act ( "CEQA "); (ii) "none of the
conditions described in Section 15162 [of the State CEQA Guidelines] calling for the preparation
of a subsequent EIR or negative declaration have occurred" in connection with the proposed
amendment to Final Site Plan No. 2008 - 00004; and (iii) no further environmental documentation
need be prepared for said amendment; and,
WHEREAS, the Planning Commission, after due inspection, investigation and study
made by itself and in its behalf, and after due consideration of all evidence and reports offered at
said hearing, does find and determine the following facts:
1. That the request to construct a 252 -room hotel with 28,647 square feet of accessory
uses, including supporting retail, restaurants, meeting rooms and hotel offices complies with the
Anaheim Resort Specific Plan (SP92 -2), contingent upon and subject to the approval of
amendments to Conditional Use Permit No. 2009- 05403, Variance No. 2008 - 04761, and Public
Convenience and Necessity No. 2009 - 05403, now pending; and
2. That the proposed 252 -room hotel with 28,647 square feet of accessory uses will be
compatible with hotels within the Anaheim Resort Specific Plan. Moreover, the proposed project
has been designed to have an attractive appearance from both Harbor Boulevard and Katella
Avenue to preserve and enhance The Anaheim Resort.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission, for the reasons
hereinabove stated, does hereby approve Final Site Plan No. 2009- 05403B, contingent upon and
subject to the conditions of approval described in Exhibit B and the mitigation measures
described in Exhibit attached hereto and incorporated herein by this reference, which are hereby
found to be a necessary prerequisite to the proposed use of the subject property in order to
preserve the health, safety and general welfare of the citizens of the City of Anaheim.
BE IT FURTHER RESOLVED that approval of Final Site Plan No. 2008- 00004B is
contingent upon and subject to the approval of the amendments to Conditional Use Permit No.
2009 - 05403, Variance No. 2008 - 004761, and Public Convenience and Necessity No. 2009-
00056, now pending; and
BE IT FURTHER RESOLVED, that Final Site Plan No. 2009- 05403B is approved
without limitations on the hours of operation or the duration of the use. Amendments,
modifications and revocations of Final Site Plan No. 2009- 05403B may be processed in
accordance with Chapters 18.60.190 (Amendment to Permit Approval) of the Anaheim
Municipal Code.
BE IT FURTHER RESOLVED that the Planning Commission does hereby find and
determine that adoption of this Resolution is expressly predicated upon applicant's compliance
with each and all of the conditions hereinabove set forth. Should any such condition, or any part
thereof, be declared invalid or unenforceable by the final judgment of any court of competent
jurisdiction, then this Resolution, and any approvals herein contained, shall be deemed null and
void.
-2- PC2013 -011
BE IT FURTHER RESOLVED that the applicant is responsible for paying all charges
related to the processing of this discretionary case application within 15 days of the issuance of
the final invoice or prior to the issuance of building permits for this project, whichever occurs
first. Failure to pay all charges shall result in delays in the issuance of required permits or the
revocation of the approval of this application.
THE FOREGOING RESOLUTION was adopted at the Anaheim City Planning
Commission meeting of January 28, 2013. Said resolution is subject to the appeal provisions set
forth in Chapter 18.60 (Zoning Provisions – General) of the Anaheim Municipal Code pertaining
to appeal procedures and may be replaced by a City Council Resolution in the event of an appeal.
CHAIR PR (YTEMPORE, ANAHEIM CITY PLANNING COMMISSION
ATTEST:
— 1 ; , , " /"
SENIOR ECRETARY, ANAHEIM CITY PLANNING COMMISSION
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, Grace Medina, Senior Secretary of the Anaheim City Planning Commission, do hereby
certify that the foregoing resolution was passed and adopted at a meeting of the Anaheim City
Planning Commission held on January 28, 2013, by the following vote of the members thereof:
AYES: COMMISSIONERS: AGARWAL, BOSTWICK, FAESSEL, LIEBERMAN,
PERSAUD, SEYMOUR
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: RAMIREZ
IN WITNESS WHEREOF, I have hereunto set my hand this 28 day of January, 2013.
SENIOR SEMETARY, ANAHEIM
COMMISSION
3- PC2013 -011
EXHIBIT "A"
DEV NO. 2012 -00141
APN: 137 - 171 -24
137- 171 -29
137- 171 -31
W KATELLA AVE
J 5545'
m
a iV
0 F �
m �
Q
2 535'
I
Source: Recorded Tract Maps and/or City GIS.
Please note the accuracy is +/- two to five feet.
-4- PC2013 -011
EXHIBIT `B"
DEN NO. 2012 -00141
NO.
CONDITIONS OF APPROVAL
REVIEW BY
SIGNED
OFF BY
PRIOR TO ISSUANCE OF GRADING PERMITS
1
The property owner /developer shall demonstrate that coverage has
Public Works,
been obtained under California's General Permit for Stormwater
Development
Discharges Associated with Construction Activity by providing a
Services
copy of the Notice of Intent (NOI) submitted to the State Water
Resources Control Board and a copy of the subsequent notification of
the issuance of a Waste Discharge Identification (WDID) Number.
2
The property owner /applicant shall submit for review and approval a
Public Works,
Final Water Quality Management Plan that:
Development
• Addresses Site Design Best Management Practices (BMPs)
Services
such as minimizing impervious areas, maximizing
Planning
permeability, minimizing directly connected impervious areas,
creating reduced or "zero discharge" areas, and conserving
natural areas.
• Incorporates the applicable Routine Source Control BMPs as
defined in the Drainage Area Management Plan (DAMP).
• Incorporates Treatment Control BMPs as defined in the
DAMP.
• Describes the long -term operation and maintenance
requirements for the Treatment Control BMPs
• Identifies the entity that will be responsible for long -term
operation and maintenance of the Treatment Control BMPs,
and describes the mechanism for funding the long -tern
operation and maintenance of the Treatment Control BMPs.
3
There is no backflow prevention device on the existing 3 -inch water
Public
meter serving the property. If the property owner /developer plans to
Utilities, Water
re -use the service, a lead -free backflow prevention device meeting the
Engineering
City of Anaheim's requirements shall be installed on the meter prior
to issuance of building or grading permits, whichever comes first.
Additionally, the meter is substandard and shall be upgraded per City
Standards (above ground, on private property behind setback, and in
an easement). Otherwise, the service shall be abandoned cut, and
capped at the main and the vault shall be backfilled per City of
Anaheim standards.
4
The applicant/developer shall submit an emergency fire access plan to
Fire
the Fire Department for review and approval to ensure that service to
the site is in accordance with Fire Department service requirements.
PRIOR TO ISSUANCE OF BUILDING PERMITS
-5- PC2013 -011
5
Plans shall specifically indicate that all vehicular ramps and grades
Public Works,
conform to all applicable Engineering Standards.
Traffic and
Transportation
6
Plans for the parking structure shall demonstrate that at -grade ducts
Public Works,
and overhead pipes shall not encroach in the parking space areas or
Traffic and
required vehicle clearance areas.
Transportation
7
The property owner /developer shall comply with Ordinance No. 5209
Public Works,
and Resolution No. 91R -89 relating to the Transportation Demand
Traffic and
Management (TDM) by providing on -site taxi and shuttle bus loading
Transportation
zones, and by joining and financially participating in the ATN and
Clean Fuel Shuttle Program and by installing bicycle racks. The
project shall provide a taxi/shuttle loading area and a separate bus bay
on site acceptable to the City Traffic and Transportation Manager for
hotel shuttle busses to transport guests to and from tourist attractions
and local airports.
8
The legal property owner shall irrevocably offer to dedicate to the
Public Works,
City of Anaheim and easement for street, public utility and other
Development
public purposes for the widening of Katella Avenue and Harbor
Services
Boulevard to its ultimate right -of -way of 83 feet from the streets
centerline.
9
A lot line adjustment shall be submitted to the Public Works
Public Works,
Department, Development Services Division to merge the existing
Development
parcels into one legal lot. The Lot Line Adjustment shall be approved
Services
by the City Engineer and recorded in the office of the Orange County
Recorder.
10
All existing structures shall be demolished. The developer shall obtain
Public Works,
a demolition permit from the Building Division.
Development
Services
11
All structural BMPs of the WQMP shall be reviewed and approved by
Public Works,
the City's Operation and Maintenance Division.
Development
Services
12
The City shall have final authority over the selection of pavers installed
Public Works,
in the public right -of -way. Consideration for appearance, size, shape
Development
and other physical properties, shall be taken into account.
Services
Recommendations shall be made by the project proponent and City
approval shall be made through the required street improvement plans.
13
A Right of Way Construction Permit shall be obtained from the Public
Public Works,
Works Department/Development Services for all work performed in the
Development
right -of -way. A bond shall be posted in an amount approved by the
Services
City Engineer and a form approved by the City Attorney. The
improvements shall be constructed prior to final building and zoning
inspections.
-6- PC2013 -011
14
The recordation of a Save Harmless in -lieu of Encroachment
Public Works,
Agreement is required for any private storm drains connecting to a City
Development
storm drain.
Services
15
Street improvement plans shall be submitted for all required public
Public Works,
works improvements; including traffic signal and related improvements,
Development
striping, storm drain, sewer, landscape and irrigation improvements, to
Services
the Public Works Department, Development Services Division for
review and approval. A bond shall be posted in an amount approved by
the City Engineer and a form approved by the City Attorney prior to
issuance of a building permit. The improvements shall be constructed
prior to final building and zoning inspections.
16
The property owner /developer shall enter into an encroachment license
Public Works,
agreement with the City of Anaheim for all non - standard improvements
Development
proposed in the public right of way.
Services
17
The existing middle driveway approach on Harbor Blvd shall be
Public Works,
removed and replace with curb, gutter, parkway landscaping and
Development
sidewalk. A bond shall be posted in an amount approved by the City
Services
Engineer and a form approved by the City Attorney prior to issuance of
a building permit. A Right of Way Construction Permit shall be
obtained from the Public Works Department/Development Services for
all work performed in the right -of -way. The improvements shall be
constructed prior to final building and zoning inspections.
18
The applicant/developer shall abandon any existing City of Anaheim
Public Works,
Public Utilities easements conflicting with building footprints.
Development
Services
19
Plans shall demonstrate that fire lanes shall be posted with "No
Public Works,
Parking Any Time." Said information shall be specifically shown on
Traffic and
plans submitted for building permits.
Transportation
20
The applicant/developer shall submit an emergency fire access plan to
Fire
the Fire Department for review and approval to ensure that service to
the site is in accordance with Fire Department Service Programs.
21
A private water system with separate water service for fire protection
Public
and domestic water shall be provided.
Utilities, Water
Engineering
22
All backflow equipment shall be located above ground outside of the
Public
street setback area in a manner fully screened from all public streets
Utilities, Water
and alleys. Any backflow assemblies currently installed in a vault
Engineering
will have to be brought up to current standards. Any other large water
system equipment shall . be installed to the satisfaction of the Water
Engineering Division outside of the street setback area in a manner
fully screened from all public streets and alleys. Said information
shall be specifically shown on plans and approved by Water
-7- PC2013 -011
-8- PC2013 -011
Engineering and Cross Connection Control Inspector.
23
All request for new water services or fire lines, as well as any
Public
modifications, relocations, or abandonments of existing water
Utilities, Water
services and fire lines, shall be coordinated through the Water
Engineering
Engineering Division of the Anaheim Public Utilities Department.
24
This is a non - individual homeowner project with a landscaping area
Public
(including pools or other Water features) exceeding 2,500 square feet,
Utilities, Water
a Landscape Documentation Package and a Certificate of Completion
Engineering
are required and a separate irrigation meter shall be installed in
compliance with Chapter 10.19 of the Anaheim Municipal Code and
Ordinance No. 6160 relating to landscape water efficiency.
25
The landscaping shall be provided around the above ground large
Public
meter or fire service to shield from street view.
Utilities, Water
Engineering
26
This project is located in the Anaheim Resort Area, installation of
Public
large meters and fire service assemblies must comply with the
Utilities, Water
screening requirements of Ordinance No. 5156 and Chapter 18.116 of
Engineering
the Anaheim Municipal Code.
27
All existing water services and fire services shall conform to current
Public
Water Services Standards Specifications. Any water service and/or
Utilities, Water
fire line that does not meet current standards shall be upgraded if
Engineering
continued use is necessary of abandoned if the existing service is no
longer needed. The owner /developer shall be responsible for the
costs to upgrade or to abandon any water service or fire line.
28
The property owner /developer shall contact Water Engineering for
Public
recycled water system requirements and specific water conservation
Utilities, Water
measures to be incorporated into the building and landscape
Engineering
construction plans.
29
The applicant/developer shall install, bond for, or otherwise secure
Public
on -site electrical facilities in accordance with the City of Anaheim
Utilities,
Public Utility Electric Rates, Rules and Regulations, and provide
Electrical
written evidence of this fact to the Public Utilities Department.
Engineering
30
The applicant/developer shall coordinate with the Electrical
Public
Engineering Division to ensure that there will be no conflicts with the
Utilities,
underground electrical systems and to establish electrical service
Electrical
requirements and obtain electrical distribution plans.
Engineering
-8- PC2013 -011
31
Plans shall indicate that above - ground utility devices are located on
Public
private property and outside any required setback areas unless
Utilities,
otherwise allowed by the Code. The above - ground utility devices
Electrical
shall be specifically shown on construction plans in locations
Engineering
substantially in accordance with the approved Final Site Plan.
Landscape and /or hardscape screening of all padmounted equipment
shall be required outside the easement area of the equipment.
32
The applicant/developer shall coordinate its service requirements and
Public
relocation issues with the City of Anaheim Public Utilities
Utilities,
Department and the other utility companies involved.
Electrical
Engineering
33
Building plans shall show that the property shall be served with
Public
underground utilities per the Electrical Rates, Rules, and Regulations,
Utilities,
and the City of Anaheim Underground Policy, with installation prior
Electrical
to the first final building and zoning inspection.
Engineering
34
The applicant/developer shall incorporate the following energy saving
Public
practices into building plans. The applicant/devetoper shall
Utilities,
implement, to the extent feasible, these energy saving practices, in
Electrical
compliance with Title 10 of the Anaheim Municipal Code, prior to
Engineering
final building and zoning inspection:
a. Consultation with the Public Utilities Department energy
conservation experts for assistance with energy conservation
design features.
b. Use of electric motors designed to conserve energy.
c. Use of special lighting fixtures such as motion sensing light
switch devices and compact fluorescent fixtures in place of
incandescent lights.
d. Use of T8 lamps and electronic ballasts. Metal halide or high -
pressure sodium for outdoor lighting.
PRIOR TO APPLYING FOR THE FIRST WATER METER OR FIRE SERVICE OR FIRST
SUBMITTAL OF THE WATER IMPROVEMENT PLANS
35
The property owner /developer shall submit to the Public Utilities
Public
Department, Water Engineering Division and estimate of the
Utilities, Water
maximum fire flow rate and maximum day and peak hour water
Engineering
demands for the project. This information will be used to determine
the adequacy of the existing water system to provide the estimated
water demands. Any off -site water system improvements required to
serve the project shall be done in accordance with Rule No. 15A.6 of
the Water Utility Rates, Rules and Regulations.
PRIOR TO APPROVAL OF WATER IMPROVEMENT PLAN
36
The owner shall irrevocably offer to dedicate to the City of Anaheim
(i) an easement for all large domestic above - ground water meters and
fire hydrants, including a five (5) -foot wide easement around the fire
hydrant and/or water meter pad. (ii) a twenty (20) foot wide easement
-9- PC2013 -011
- 10- PC2013 -011
for all water service laterals all to the satisfaction of the Water
Engineering Division. The easements shall be granted on the Water
Engineering Division of the Public Utilities Division. The easements
shall be granted on the Water Engineering Division of the Public
Utilities Department's standard water easement deed. The easement
deeds shall include language that requires the Owner to be responsible
for restoring any special surface improvements, other than asphalt
paving, including but not limited to colored concrete, bricks, pavers,
stamped concrete, decorative hardscape, walls or landscaping that
becomes damaged during excavation, repair or replacement of City -
owned water facilities. Provisions for the repair, replacement and
maintenance of all surface improvements other than asphalt paving
shall be the responsibility of the Owner and included and recorded in
the Master CC & Rs for the project.
PRIOR TO FINAL BUILDING AND ZONING INSPECTIONS
37
The applicant shall:
Public Works,
• Demonstrate that all structural BMPs described in the Project &
Development
Services
Site Specific WQMP have been constructed and installed in
conformance with approved plans and specifications.
• Demonstrate that the applicant is prepared to implement all non-
structural BMPs described in the Project & Site Specific WQMP
• Demonstrate that an adequate number of copies of the approved
Project & Site Specific WQMP are available onsite.
• Submit for review and approval by the City an Operation and
Maintenance Plan for all structural BMPs.
38
The installation of new electrical facilities systems shall be timed to
Public
coincide with the level of development that would require this
Utilities,
improvement, to the satisfaction of the Anaheim Public Utilities
Electrical
Department and other utility companies.
Engineering
39
The applicant/developer shall provide the City of Anaheim with a
Public
public utilities easement (per final electric design), along/across high
Utilities,
voltage lines, low voltage lines crossing private property, and around
Electrical
all padmounted transformers, switches, capacitors, etc. Said easement
Engineering
shall be submitted to the City of Anaheim prior to connection of
electrical service. Landscape and /or hardscape screening of all
padmounted equipment shall be required outside the easement area of
the equipment.
40
A Burglary/Robbery Alarm Permit application, Form APD 516 shall
Police
be completed and returned to the Police Department prior to initial
alarm activation. This form is available at the Police Department
front counter, or it can be downloaded from the following web site:
www. anaheim.net/article.asp ?id -678
ONGOING DURING PROJECT OPERTATION
41
Parking area shall be equipped with lighting of sufficient power to
Police
illuminate and make easily discernible the appearance and conduct of
- 10- PC2013 -011
- 11- PC2013 -011
all persons on or about the parking lot. Additionally, the position of
such lighting shall not disturb the normal privacy and use of any
neighboring uses.
42
Compliance with AMC 6016, the Anaheim Public Safety Radio
Police
System Coverage Ordinance is required. To request a copy of the
ordinance, contact Officer Budds at (714) 765 -3859 or
mbudds @anaheim.net A copy of the ordinance can also be
viewed/downloaded online through the City of Anaheim web site
under "City Records ": www.anaheim.net
43
Parking structures should have clearly marked emergency stations
Police
with hands free, two -way communication with Security /Police.
These should be placed adjacent to stairway landings and
appropriately spaced throughout the structure.
44
All entrances to parking areas shall be posted with appropriate signs
Police
per 22658(a) C.V.C., to assist in removal of vehicles at the property
owner /managers request.
45
"No Trespassing 602(k) P.C." shall be posted at the entrances of
Police
parking lots /structures and located in other appropriate places. Signs
must be at least 2' x 1' in overall size, with white background and
black 2" lettering.
46
Minimum recommended lighting level for covered portions of all
Police
parking structures is 1 foot - candle maintained, measured at the
parking surface, with a maximum to minimum ratio no greater than
10:1.
47
Rooftop address numbers for the police helicopter shall be provided
Police
at a minimum size of 4' in height and 2' in width. The lines of the
numbers are to be a minimum of 6" thick. Numbers shall be spaced
12" to 18" apart. Numbers shall be painted or constructed in a
contrasting color to the roofing material. Numbers shall face the
street to which the structure is addressed. Numbers are not to be
visible from ground level.
48
The sanitary sewer and storm drains for this development shall be
Public Works,
privately maintained except the mainline sewer and storm drain within
Development
the public streets.
Services
49
No required parking areas shall be fenced or otherwise enclosed for
Planning
outdoor storage uses.
GENERAL
50
That it is the responsibility of the OWNER to remove and relocate
Public Works,
any traffic signal poles and equipment at the intersection of Katella
Development
Avenue and Harbor Boulevard if necessary at the OWNERS expense.
Services
- 11- PC2013 -011
51
The applicant shall comply with the measures and timing in
Planning
Mitigation Monitoring Program No. 156A, attachment "C" of this
resolution.
52
The subject property shall be developed substantially in accordance
Planning
with plans and specifications submitted to the City of Anaheim by the
petitioner and which plans are on file with the Planning Department
and as conditioned herein.
53
The time period to satisfy conditions of approval shall be two (2)
Planning
years, commencing immediately following the original expiration
date, which was March 31, 2012. Extensions for further time to
complete conditions of approval may be granted in accordance with
Section 18.60.170 of the Anaheim Municipal Code, as the same may
be amended from time to time.
54
That timing for compliance with conditions of approval may be
Planning
amended by the Planning Director upon a showing of good cause
provided (i) equivalent timing is established that satisfies the original
intent and purpose of the condition(s), (ii) the modification complies
with the Anaheim Municipal Code and (iii) the applicant has
demonstrated significant progress toward establishment of the use or
approved development.
55
Approval of this application constitutes approval of the proposed
Planning
request only to the extent that complies with the Anaheim Municipal
Zoning Code and any other applicable City, State and Federal
regulations. Approval does not include any action or findings as to
compliance or approval of the request regarding any other applicable
ordinance, regulation or requirement.
-12- PC2013 -011
MITIGATION MONITORING PROGRAM NO. 156A
Exhibit "C"
MITIGATION MONITORING PROGRAM NO. 156A
MITIGATE NEGATIVE DECLARATION
SCH 2009 - 011077
Terms and Definitions:
1. Property Owner /Developer — The Property Owner and /or Developer of 1800 -1820 South Harbor Boulevard.
2. Environmental Equivalent/Timing - Any mitigation measure and timing thereof, subject to the approval of the City, which will have the same or
superior result and will have the same or superior effect on the environment. The Planning Department, in conjunction with any appropriate
agencies or City departments, shall determine the adequacy of any proposed "environmental equivalent/timing" and, if determined necessary, may
refer said determination to the Planning Commission. Any costs associated with information required in order to make a determination of
environmental equivalency /timing shall be borne by the property owner /developer. Staff time for reviews will be charged on a time and materials
basis at the rate in the City's adopted Fee Schedule.
3. Timing - This is the point where a mitigation measure must be monitored for compliance. In the case where multiple action items are indicated, it
is the first point where compliance associated with the mitigation measure must be monitored. Once the initial action item has been complied with,
no additional monitoring pursuant to the Mitigation Monitoring Plan will occur, as routine City practices and procedures will ensure that the intent of
the measure has been complied with. For example, if the timing is "to be shown on approved building plans" subsequent to issuance of the
building permit consistent with the approved plans will be final building and zoning inspections pursuant to the building permit to ensure
compliance.
4. Responsibility for Monitoring - Shall mean that compliance with the subject mitigation measure(s) shall be reviewed and determined adequate by
all departments listed for each mitigation measure. Outside public agency review is limited to those public agencies specified in the Mitigation
Monitoring Plan which have permit authority in conjunction with the mitigation measure.
5. Ongoing Mitigation Measures - The mitigation measures that are designated to occur on an ongoing basis as part of this Mitigation Monitoring
Plan will be monitored in the form of an annual letter from the property owner /developer in January of each year demonstrating how compliance
with the subject measure(s) has been achieved. When compliance with a measure has been demonstrated for a period of one year, monitoring of
the measure will be deemed to be satisfied and no further monitoring will occur. For measures that are to be monitored "Ongoing During
Construction ", the annual letter will review those measures only while construction is occurring; monitoring will be discontinued after construction is
complete. A final annual letter will be provided at the close of construction.
6. Building Permit - For purposes of this Mitigation Monitoring Plan, a building permit shall be defined as any permit issued for construction of a new
building or structural expansion or modification of any existing building, but shall not include any permits required for interior tenant improvements
or minor additions to an existing structure or building.
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
I. AESTHETICS
1
Prior to Issuance of
The property Owner /Developer shall submit plans which detail the
Planning
a Building Permit
lighting system for any parking facilities adjacent to residential or light -
sensitive uses. The systems shall be designed and maintained in such
a manner as to conceal light sources to the extent feasible to minimize
light spillage and glare to the adjacent uses. The plans shall be
prepared and signed by a licensed Electrical Engineer, with a letter
from the engineer stating that, in the opinion of the engineer, this
requirement has been met.
3
Prior to Issuance of
The property owner /developer shall submit plans which illustrate that
Planning
Each Building
all mechanical equipment and trash areas for the subject building(s)
Permit
will be screened from adjacent public streets and adjacent residential
areas. Screening shall be installed prior to final building and zoning
inspection.
4
Prior to Issuance of
The property owner /developer shall submit a landscape and irrigation
Planning
Each Building
plan which shall be prepared and certified by a licensed landscape
Permit
architect. The landscape plan shall include a phasing plan for the
installation and maintenance of landscaping associated with that
building permit and shall be in conformance with the Water Efficiency
Landscape Ordinance.
The irrigation plan shall specify methods for monitoring the irrigation
system. The system shall ensure that irrigation rates do not exceed
the infiltration of local soils, that the application of fertilizers and
pesticides do not exceed appropriate levels of frequencies, and that
surface runoff and overwatering is minimized.
The landscape and irrigation plans shall include water - conserving
features such as low flow irrigation heads, automatic irrigation
scheduling equipment, flow sensing controls, rain sensors, soil
moisture sensors, and other water - conserving equipment. In addition,
all irrigation systems shall be designed so that they will function
properly with reclaimed water, once a system is available. The
landscape and irrigation plans shall be reviewed by the Anaheim
Resort Maintenance District.
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
5
Prior to Submittal of
The property owner /developer shall submit a shade and shadow
Planning
Each Final Site Plan
analysis to the Planning Department for review and approval
demonstrating that the proposed structure(s) would not create
significant shade and shadow impacts on adjacent land uses. A
significant shade and shadow impact would occur when outdoor active
areas (e.g., eating areas along Harbor Boulevard, hotel /motel
swimming pools, and residential front and back yards) or structures
that include sensitive uses (e.g., residences) have windows that
normally receive sunlight are covered by shadows for more than 50
percent of the sunlight hours. If the analysis identifies shade and /or
shadow impacts would occur and the building setback, architectural
massing and landscape requirement provisions set forth in Section 5.0,
Design Plan of the Anaheim Resort Specific Plan, do not function as
feasible mitigation measures, additional technical review of the
structure(s) will be required.
6
Prior to the Final
The property owner /developer shall participate in the Anaheim
Planning
Building and Zoning
Assessment District for landscape installation and maintenance.
Inspection
II. AGRICULTURE RESOURCES —No Mitigation Measures Required
III. AIR QUALITY
7
Ongoing During
The property owner /developer shall implement measures to reduce
Traffic and
Project Operation
emissions to the extent practical, schedule goods movements for off-
Transportation
peak traffic hours, and use clean fuel for vehicles and other equipment,
as practicable.
8
Prior to Issuance of
The property owner /developer shall submit evidence that low emission
Building
Each Building
paints and coatings are utilized in the design of buildings, in
Permit; and,
compliance with SCAQMD regulations. This information shall be
Ongoing During
denoted on the project plans and specifications. The property
Construction
owner /developer shall also implement the following to limit emissions
from architectural coatings and asphalt usage:
a. Use non - solvent -based coatings on buildings, wherever
appropriate.
b. Use solvent -based coatings, where they are necessary, in ways
that minimize solvent emissions.
c. Encourage use of high -solid or water -based coatings.
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Number
Timing
Measure
Responsible for
Monitoring
Completion
9
Ongoing During
The property owner /developer shall implement measures to reduce
Development
Construction
construction - related air quality impacts. These measures shall include,
Services
but are not limited to:
a. Normal wetting procedures (at least twice daily) or other dust
Building
palliative measures shall be followed during earth- moving
operations to minimize fugitive dust emissions, in compliance with
the City of Anaheim Municipal Code including application of
chemical soil stabilizers to exposed soils after grading is
completed and replacing ground cover in disturbed areas as
quickly as practicable.
b. Enclosing, covering, watering twice daily, or applying approved
soil binders, according to manufacturer's specification, to exposed
stock piles.
c. Roadways adjacent to the project shall be swept and cleared of
any spilled export materials at least twice a day to assist in
minimizing fugitive dust; and, haul routes shall be cleared as
needed if spills of materials exported from the project site occur.
d. Where practicable, heavy duty construction equipment shall be
kept onsite when not in operation to minimize exhaust emissions
associated with vehicles repetitiously entering and exiting the
project site.
e. Trucks importing or exporting soil material and /or debris shall be
covered prior to entering public streets.
f. Taking preventive measures to ensure that trucks do not carry dirt
on tires onto public streets, including treating onsite roads and
staging areas.
g. Preventing trucks from idling for longer than 2 minutes.
h. Manually irrigate or activate irrigation systems necessary to water
and maintain the vegetation as soon as planting is completed.
i. Reduce traffic speeds on all unpaved road surfaces to 15 miles
per hour or less.
j. Suspend all grading operations when wind speeds (as
instantaneous gust) exceed 25 miles per hour and during first and
second stage smog alerts.
k. Comply with the SCAQMD Rule 402, which states that no dust
impacts offsite are sufficient to be called a nuisance, and
SCAQMD Rule 403, which restricts visible emissions from
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
construction.
I. Use low emission mobile construction equipment (e.g., tractors,
scrapers, dozers, etc.) where practicable.
m. Utilize existing power sources (e.g., power poles) or clean -fuel
generators rather than temporary power generators, where
practicable.
n. Maintain construction equipment engines by keeping them
properly tuned.
o. Use low sulfur fuel for equipment, to the extent practicable.
10
Prior to Approval of
The property owner /developer shall submit Demolition and
Development
Each Grading Plan
Import/Export Plans, if determined to be necessary by the Public
Services
(for Import/Export
Works Department. The plans shall include identification of offsite
Plan) and Prior to
locations for materials export from the project and options for disposal
Issuance of
of excess material. These options may include recycling of materials
Demolition Permit
onsite, sale to a soil broker or contractor, sale to a project in the vicinity
(for Demolition
or transport to an environmentally cleared landfill, with attempts made
Plan)
to move it within Orange County. The property owner /developer shall
offer recyclable building materials, such as asphalt or concrete, for sale
or removal by private firms or public agencies for use in construction of
other projects, if not all can be reused on project site.
11
Prior to Issuance of
The property owner /developer shall comply with all SCAQMD offset
Planning (for
Each Building
regulations and implementation of Best Available Control Technology
verification of
Permit
(BACT) and Best Available Retrofit Control Technology (BARCT) for
permit application
any new or modified stationary source. Copies of permits shall be
and receipt)
given to the Planning Department.
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
12
Prior to Issuance of
The property owner /developer shall implement, and demonstrate to the
Resource Efficiency
Each Building
City, measures that are being taken to reduce operation - related air
Permit
quality impacts. These measures may include, but are not limited to,
Planning
the following:
1. Improve thermal integrity of structures and reduced thermal load
through use of automated time clocks or occupant sensors.
2. Incorporate efficient heating and other appliances.
3. Incorporate energy conservation measures in site orientation and
in building design, such as appropriate passive solar design.
4. Use drought- resistant landscaping wherever feasible to reduce
energy used in pumping and transporting water.
5. To the extent feasible, provide daycare opportunities for
employees or participate in a joint development daycare center.
13
Prior to Issuance of
Implementation of energy conservation techniques (i.e., installation of
Resource Efficiency
a Building Permit
energy saving devices, construction of electrical vehicle charging
stations, use of sunlight filtering window coatings or double -paned
Planning
windows, utilization of light- colored roofing materials as opposed to
dark - colored roofing materials, and placement of shady trees next to
habitable structures) shall be indicated on plans.
14
Prior to Issuance of
The applicant shall incorporate project features and commitments as
Planning
Building Permits
described in Table AQ -7, attached hereto.
IV. BIOLOGICAL RESOURCES
16
Prior to Issuance of
If the ornamental trees on the project site are proposed to be removed
Planning
a Grading Permit
during the nesting season, (February 1 to June 30), prior to site
clearance /grading a qualified Biologist shall be required to inspect the
trees prior to removal to ensure no nesting birds are present. If an
active nest is present, then the Biologist will identify appropriate
minimization measures to the satisfaction of the City of Anaheim
Planning Department.
V. CULTURAL RESOURCES
17
Prior to Approval of
The property owner /developer shall submit a letter identifying the
Development
Each Grading Plan
certified archaeologist that has been hired to ensure that the following
Services
actions are implemented:
a. The archaeologist must be present at the pregrading conference
in order to establish procedures for temporarily halting or
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Number
Timing
Measure
Responsible for
Monitoring
Completion
redirecting work to permit the sampling, identification, and
evaluation of artifacts if potentially significant artifacts are
uncovered. If artifacts are uncovered and determined to be
significant, the archaeological observer shall determine
appropriate actions in cooperation with the property
owner /developer for exploration and /or salvage.
b. Specimens that are collected prior to or during the grading
process will be donated to an appropriate educational or research
institution.
c. Any archaeological work at the site shall be conducted under the
direction of the certified archaeologist. If any artifacts are
discovered during grading operations when the archaeological
monitor is not present, grading shall be diverted around the area
until the monitor can survey the area.
d. A final report detailing the findings and disposition of the
specimens shall be submitted to the City Engineer. Upon
completion of the grading, the archaeologist shall notify the City
as to when the final report will be submitted.
18
Prior to Approval of
The property owner /developer shall submit a letter identifying the
Development
Each Grading Plan
certified paleontologist that has been hired to ensure that the following
Services
actions are implemented:
a. The paleontologist must be present at the pregrading conference
in order to establish procedures to temporarily halt or redirect
work to permit the sampling, identification, and evaluation of
fossils if potentially significant paleontological resources are
uncovered. If artifacts are uncovered and found to be significant,
the paleontological observer shall determine appropriate actions
in cooperation with the property owner /developer for exploration
and /or salvage.
b. Specimens that are collected prior to or during the grading
process will be donated to an appropriate educational or research
institution.
c. Any paleontological work at the site shall be conducted under the
direction of the certified paleontologist. If any fossils are
discovered during grading operations when the paleontological
monitor is not present, grading shall be diverted around the area
until the monitor can survey the area.
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
d. A final report detailing the findings and disposition of the
specimens shall be submitted. Upon completion of the grading,
the paleontologist shall notify the City as to when the final report
will be submitted.
VI. GEOLOGY AND SOILS
19
Prior to Issuance of
The property owner /developer shall submit plans showing that the
Building
Each Building
proposed structure has been analyzed for earthquake loading and
Permit
designed according to the most recent seismic standards in the
Uniform Building Code adopted by the City of Anaheim.
20
Prior to Approval of
The property owner /developer shall submit to the City Engineer for
Development
Each Grading Plan
review and approval, a soils and geological report for the area to be
Services
graded, based on proposed grading and prepared by an engineering
geologist and geotechnical engineer. All grading shall be in
conformance with Title 17 of the Anaheim Municipal Code.
21
Prior to Issuance of
The property owner /developer shall submit for review and approval,
Building
Each Building
detailed foundation design information for the subject building(s),
Permit
prepared by a civil engineer, based on recommendations by a
geotechnical engineer.
22
Prior to Issuance of
The property owner /developer shall submit a report prepared by a
Building
Each Foundation
geotechnical engineer for review and approval which shall investigate
Permit
the subject foundation excavations to determine if soft layers are
present immediately beneath the footing site and to ensure that
compressibility does not underlie the footing.
23
Ongoing During
The property owner /developer shall implement standard practices for
Fire
Grading Activities
all applicable codes and ordinances to prevent erosion to the
satisfaction of the Public Works Department, Development Services
Division.
24
Prior to Final
The property owner /developer shall submit an earthquake emergency
Fire
Building and Zoning
response plan for review and approval. The plan shall require posted
Inspection for a
notices in hotel rooms on earthquake safety procedures and
Hotel /Motel
incorporate ongoing earthquake training for hotel staff.
VII. HAZARDS AND HAZARDOUS MATERIALS
25
Ongoing during
In the event that hazardous waste, including asbestos, is discovered
Fire
demolition and
during site preparation or construction, the property owner/de
shall ensure that the identified hazardous waste and /or hazardous
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
material are handled and disposed of in the manner specified by the
State of California Hazardous Substances Control Law (Health and
Safety Code, Division 20, Chapter 6.5) and according to the
requirements of the California Administrative Code, Title 30, Chapter
22.
26
Prior to approval of
The property owner /developer shall submit a plan for review and
Fire
the first grading
approval to the Environmental Protection Section of the Fire
plan or issuance of
Department which details procedures that will be taken if a previously
the first demolition
unknown USTs, or other unknown hazardous material or waste, is
permit, whichever
discovered onsite.
occurs first
27
Prior to approval of
The Property owner /developer shall provide an Asbestos Identification
Fire
the first grading
Survey to the Environmental Protection Section of the City of Anaheim
plan or issuance of
Fire Department. This Survey shall detail procedures that will be taken
the first demolition
if previously unknown underground storage tanks (USTs), or other
permit, whichever
unknown hazardous material or waste is discovered.
occurs first
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
VIII. HYDROLOGY AND WATER QUALITY
28
Prior to issuance of
The Landowner or subsequent project property owner /developer shall
Development
grading permits
prepare a Storm Water Pollution Prevention Plan ( SWPPP) that will:
Services
• Require implementation of Best Management Practices (BMPs)
designed with a goal of preventing a net sediment load increase
in storm water discharges relative to preconstruction levels;
• Prohibit, during the construction period, discharges of storm water
or non -storm water at levels which would cause or contribute to
an exceedance of applicable water quality standards contained in
the Basin Plan;
• Discuss in detail the BMPs planned for the project related to
control of sediment and erosion, non - sediment pollutants, and
potential pollutants in non -storm water discharges;
• Describe post- construction BMPs for the project;
• Explain the maintenance program for the project's BMPs;
• Require reporting of violations to the Regional Board during
construction; and
• List the parties responsible for SWPPP implementation and BMP
maintenance during and after grading.
29
Prior to the initiation
The property owner /developer shall ensure compliance with all
Development
of grading, and
recommended structural and non - structural Best Management
Services
throughout the
Practices identified in the Water Quality Management Plan (WQMP).
duration of project
construction
30
Prior to Approval of
The property owner /developer shall obtain coverage under the NPDES
Development
Grading Plan or
Statewide Industrial Stormwater Permit for General Construction
Services
Issuance of
Activities from the State Water Resources Control Board. Evidence of
Demolition Permit;
attainment shall be submitted to the City Engineer.
and, During
Clearing
10
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
31
During Project
The property owner /developer shall provide for the following: cleaning
Streets and
Operations
of all paved areas not maintained by the City of Anaheim on a monthly
Sanitation
basis, including, but not limited to, private streets and parking lots. The
use of water to clean streets, paved areas, parking lots, and other
areas and flushing the debris and sediment down the storm drains
shall be prohibited.
32
Prior to Each Final
The property owner /developer shall submit a letter from a licensed
Planning
Building and Zoning
landscape architect to the City certifying that the landscape installation
Inspection
and irrigation systems have been installed as specified in the approved
landscaping and irrigation plans.
33
Prior to Final
The property owner /developer shall install piping onsite with project
Resource Efficiency
Building and Zoning
water mains so that reclaimed water may be used for landscape
Inspection
irrigation, if and when it becomes available from the County Sanitation
District of Orange County.
34
Prior to Approval of
The property owner /developer shall submit a Master Drainage and
Development
First Grading Plan
Runoff Management Plan (MDRMP) for review and approval by the
Services
or Issuance of First
Public Works /Engineering Department, Development Services Division
Building Permit,
and Orange County Environmental Management Agency. The Master
Whichever Occurs
Plan shall include, but not be limited to, the following items:
First
a. Backbone storm drain layout and pipe size, including supporting
hydrology and hydraulic calculations for storms up to and
including the 100 -year storm; and,
b. A delineation of the improvements to be implemented for control
of project - generated drainage and runoff.
IX. LAND USE AND PLANNING — No Mitigation Measures Required
X. MINERAL RESOURCES - No Mitigation Measures Required
XI. NOISE
35
Ongoing During
Noise generated by construction activity shall be limited by the property
Code Enforcement
Demolition, Grading
owner /developer to 60 dBA along the property boundaries, before
and Construction
7:00 a.m. and after 7:00 p.m., as governed by Chapter 6.70, Sound
Building (verification
Pressure Levels, of the Anaheim Municipal Code.
of notes on plans)
11
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
36
Prior to Issuance of
An 8- foot -high perimeter or portable construction barrier shall be
Building
Each Building
provided by the property owner /developer along boundaries of
Permit
construction areas which have noise - sensitive land uses adjacent to
them to minimize noise impacts.
37
Ongoing During
The property owner /developer shall ensure that all internal combustion
Building
Project Construction
engines on construction equipment and trucks are fitted with properly
maintained mufflers.
38
Prior to Issuance of
The property owner /developer shall ensure that all mechanical
Building
Each Building
ventilation units are shown on plans and installed in compliance with
Permit
the Sound Pressure Levels Ordinance.
39
Ongoing During
The property owner shall ensure that large bulldozers, large heavy
Building
Project Construction
trucks, and other similar equipment not be used within 20 feet of the
built or occupied parts of Islander Inn Suites. The work shall be done
with medium -sized equipment or smaller within this distance.
40
Ongoing During
The property owner shall ensure the provision of an 8- foot -high
Building
Project Construction
temporary construction noise barrier on or adjacent to the section of
the eastern property line adjacent to the Islander Inn Suites swimming
pool. The barrier shall be solid from the ground to the top, with no
openings, and shall have a weight of at least three pounds per square
foot, such as half -inch thick plywood.
XII. POPULATION AND HOUSING - No Mitigation Measures Required
XIII. PUBLIC SERVICES
41
Prior to approval of
The water supply system shall be designed by the property
Fire
water improvement
owner /developer to provide sufficient fire flow pressure and storage for
plans
the proposed land use and fire protection in accordance with Fire
Department requirements.
12
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
42
Prior to
Onsite fire hydrants shall be installed and charged by the property
Fire
commencement of
owner /developer as required and approved by the Fire Department.
structural framing
on each parcel or
lot
43
Prior to approval of
The property owner /developer shall submit an emergency fire access
Fire
each grading plan
plan to the Fire Department for review and approval to ensure that
service to the site is in accordance with Fire Department service
requirements.
44
Prior to issuance of
Plans shall indicate that all buildings shall have sprinklers installed by
Fire
each building permit
the property owner /developer in accordance with Anaheim Municipal
and to be
Code. Said sprinklers shall be installed prior to each final building and
implemented prior
zoning inspection.
to final building and
zoning inspection
45
Prior to issuance of
Plans shall be submitted to ensure that development is in accordance
Fire
each building permit
with the City of Anaheim Fire Department Standards, including:
A Overhead clearance shall not be less than 14 feet for the full width
of access roads.
D Adequate off -site public fire hydrants contiguous to the Specific
Plan Area and onsite private fire hydrants shall be provided by the
property owner /developer. The precise number, types and
locations of the hydrants shall be determined during building permit
review. Hydrants are to be a maximum of 400 feet apart.
E A minimum residual water pressure of 20 psi shall remain in the
water system. Flow rates for public parking facilities shall be set at
1,000 to 1,500 gpm.
46
Prior to issuance of
The property owner /developer shall submit a Construction Fire
Fire
a building permit
Protection Plan to the Fire Department for review and approval
detailing accessibility of emergency fire equipment, fire hydrant
location, and any other construction features required by the Fire
Marshal. The property owner /developer shall be responsible for
securing facilities acceptable to the Fire Department and hydrants shall
be operational with required fire flow.
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
47
Prior to each final
The property owner /developer shall place emergency telephone
Fire
building and zoning
service numbers in prominent locations as approved by the Fire
inspection
Department.
48
Prior to approval of
The property owner /developer shall submit plans to the Police
Police
each final site plan
Department for review and approval for the purpose of incorporating
and issuance of
safety measures in the project design including the concept of crime
each building permit
prevention through environmental design (e.g., building design,
circulation, site planning, and lighting of parking structures and parking
areas).
49
Ongoing during
Ongoing during project operation, the property owner /developer shall
Police
project operation
provide private security on the premises to maintain adequate security
for the entire project subject to review and approval of the Police
Department. The use of security patrols and electronic security
devices (i.e., video monitors) should be considered to reduce the
potential for criminal activity in the area.
50
Prior to issuance of
The project design shall include parking lots with controlled access
Police
each building permit
points to limit ingress and egress if determined to be necessary by the
Police Department, and shall be subject to the review and approval of
the Police Department.
51
Prior to issuance of
The property owner /developer shall provide proof of compliance with
Building
each building permit
Government Code Section 53080 (schools) to the Building Division of
the Planning Department.
XIV. RECREATION No Mitigation Measures Required
XV. TRANSPORTATIONITRAFFIC
52
Prior to Issuance of
Appropriate Traffic Signal Assessment Fees and Traffic Impact and
Traffic and
Each Building
Improvement Fees shall be paid by the property owner /developer to
Transportation
Permit
the City of Anaheim in amounts determined by the City Council
Resolution in effect at the time of issuance of the building permit with
credit given for City- authorized improvements provided by the property
owner /developer; and, participate in all applicable reimbursement or
benefit districts which have been established.
53
Prior to Approval of
The property owner /developer shall irrevocably offer for dedication
Development
First Final
(with subordination of easements), including necessary construction
Services
Subdivision Map or
easements, the ultimate right(s) -of -way as shown in the Circulation
Issuance of First
Element of the Anaheim General Plan adjacent to their property.
14
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
Building Permit,
Whichever Occurs
First
54
Ongoing During
If the Anaheim Police Department or Anaheim Traffic Management
Police
Construction
Center (TMC) personnel are required to provide temporary traffic
control services, the property owner /developer shall reimburse the City,
Traffic and
on a fairshare basis, if applicable, for reasonable costs associated with
Transportation
such services.
55
Prior to Issuance of
The property owner /developer shall fully fund the implementation of
Traffic and
Each Building
Intelligent Transportation Systems (ITS) improvements at and adjacent
Transportation
Permit
to the intersection of Harbor Boulevard and Katella Avenue. The
specific improvements to be implemented shall be: 1) a CCTV
installation at the Harbor Boulevard/ Convention Way intersection; 2)
performance monitoring station and detection to provide a permanent
traffic count station at the Harbor Boulevard/ Katella Avenue
intersection; and 3) ATC controller and ITS cabinet with hardened
Ethernet communications to cabinet at the Harbor Boulevard/ Katella
Avenue intersection. Implementation of these improvements shall be
to the satisfaction of the City Engineer.
15
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Number
Timing
Measure
Responsible for
Monitoring
Completion
56
Prior to the first final
The property owner /developer shall provide proof of participation in the
Traffic and
building and zoning
Anaheim Transportation Network (ATN).
Transportation
inspection and
ongoing during
Ongoing during project operations, every property owner and /or lessee
project operation
shall be a voting member of the ATN, subject to the terms and
provisions of the by -laws and association rules of the ATN.
Every property owner and /or lessee shall participate in ATN
coordinated transportation demand management efforts designed to
decrease traffic congestion and increase ridesharing.
Every property owner and /or lessee shall financially participate in the
operation of a clean fuel shuttle system, and pursue its use for
employee transportation, aka Anaheim Resort Transit.
Every property owner and /or lessee shall designate an on -site contact
who shall be responsible for coordinating with the ATN and
implementing all trip mitigation measures. The requirements of this
mitigation measure shall be included in the lease or other agreement
with all of the project participants. Documentation indicating
compliance with this mitigation measure shall be included in the annual
monitoring report ongoing during project operation.
57
Ongoing during
The property owner /developer shall implement and administer a
Traffic and
project
comprehensive Transportation Demand Management (TDM) program
Transportation
implementation with
for all employees. Objectives of the TDM program shall be:
verification by
participating
Increase ridesharing and use of alternative transportation
lessees
modes by employees and guests.
• Provide a menu of commute alternatives for employees to
reduce project - generated trips.
• Conduct an annual commuter survey to ascertain trip
generation, trip origin, and Average Vehicle Ridership.
Every property owner and /or lessee shall designate an on -site contact
who shall be responsible for coordinating with the ATN and
implementing all trip mitigation measures. The on -site coordinator
shall be the one point of contact representing the project with the ATN.
The requirements of the mitigation measure shall be included in the
lease or other agreement with all of the project participants.
Ir-
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
Documentation indicating compliance with this mitigation measure shall
be included in the annual monitoring report ongoing during project
operation.
XVI. UTILITIES AND SERVICE SYSTEMS
58
Prior to the
The property Owner /Developer shall coordinate with all utility providers
Building
issuance of building
to ensure avoidance of any notable service disruptions during the
permits and
extension, relocation, upgrading of, or connection to services.
throughout the
construction
process
59
Prior to the
The project shall be subject to the fees, terms and conditions of the
Public Utilities,
issuance of building
Anaheim Resort Area Water Supply Assessment (currently under
Water
permits
preparation), the APUD Water Rates, Rules and Regulations.
The developer /owner will be required to pay a share of the cost of the
additional water supply, based on a percentage of the average day
water demand imposed by the proposed development compared to the
capacity of a future water supply facility (e.g. well, MWD connection).
The developer /owner will be required to pay fees in accordance with
APUD's Water Rates, Rules, and Regulations, Part 15E.
All new water connections shall be installed and constructed in
accordance with the latest version of Anaheim Water Services
Standard Specifications and the applicable Supplements. The
quantities of water delivered to the property owner /developer shall also
be subject to the requirements of the Orange County Water District and
the Metropolitan Water District of Southern California.
17
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Number
Timing
Measure
Responsible for
Monitoring
Completion
60
Prior to Issuance of
The property owner /developer shall submit project plans to the
Streets and
Each Building
Maintenance Department for review and approval to ensure that the
Sanitation
Permit; to be
plans comply with AB 939, the Solid Waste Reduction Act of 1989, as
Implemented Prior
administered by the City of Anaheim and the County of Orange and
to Final Building
City of Anaheim Integrated Waste Management Plans. Prior to final
and Zoning
building and zoning inspection, implementation of said plan shall
Inspection
commence and shall remain in full effect. Waste management
mitigation measures that shall be taken to reduce solid waste
generation include, but are not limited to:
A. Detailing the location and design of on -site recycling facilities.
B. Providing on -site recycling receptacles to encourage recycling.
C. Complying with all Federal, State and City regulation for hazardous
material disposal.
Participating in the City of Anaheim's "Recycle Anaheim" program
or other substitute program as may be developed by the City.
In order to meet the requirements of the Solid Waste Reduction Act of
1989 (AB 939), the property owner /developer shall implement
numerous solid waste reduction programs, as required by the Public
Works Department, including, but not limited to:
• Facilitating paper recycling by providing chutes or convenient
locations for sorting and recycling bins.
• Facilitating cardboard recycling (especially in retail areas) by
providing adequate space and centralized locations for collection
and bailing.
• Facilitating glass recycling (especially from restaurants) by
providing adequate space for sorting and storing.
• Providing trash compactors for non - recyclable materials whenever
feasible to reduce the total volume of solid waste and the number
of trips required for collection.
• Prohibiting curbside pick -up.
61
Ongoing During
The following practices shall be implemented, as feasible, by the
Resource Efficiency
Project Operation
property owner /developer:
• Usage of recycled paper products for stationery, letterhead, and
packaging.
• Recovery of materials such as aluminum and cardboard.
is
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
• Collection of office paper for recycling.
• Collection of polystyrene (foam) cups for recycling.
• Collection of glass, plastics, kitchen grease, laser printer toner
cartridges, oil, batteries, and scrap metal for recycling or recovery.
62
Prior to Issuance of
The property owner /developer shall submit plans showing that each
Building
Each Building
structure will comply with the State Energy Efficiency Standards for
Permit; to be
Nonresidential Buildings (Title 24, Part 6, Article 2, California Code of
Resource Efficiency
Implemented Prior
Regulations); and, will consult with the City of Anaheim Utilities
to Each Final
Department, Resource Efficiency Division in order to review above Title
Building and Zoning
24 measures to incorporate into the project design including energy
Inspection
efficient designs.
63
Prior to Final
The property owner /developer shall implement energy- saving practices
Building
Building and Zoning
in compliance with Title 24, which may include the following:
Inspection
Use of high- efficiency air conditioning systems controlled by a
Resource Efficiency
computerized management system including features such as a
variable air volume system, a 100 - percent outdoor air economizer
cycle, sequential operation of air conditioning equipment in
accordance with building demands, isolation of air conditioning to
any selected floor or floors.
• Use of electric motors designed to conserve energy.
• Use of special lighting fixtures such as motion sensing light switch
devices and compact fluorescent fixtures in place of incandescent
lights.
• Use of TB lamps and electronic ballasts. Metal halide or high -
pressure sodium for outdoor lighting and parking lots.
64
Prior to Issuance of
The property owner /developer shall install an underground electrical
Electrical
Each Building
service from the Public Utilities Distribution System. The Underground
Engineering
Permit for Any
Service will be installed in accordance with the Electric Rules, Rates,
Building Requiring a
Regulations and Electrical Specifications for Underground Systems.
Change in Electrical
Electrical Service Fees and other applicable fees will be assessed in
Service
accordance with the Electric Rules, Rates, Regulations and Electrical
Specifications for Underground Systems.
65
Prior to Each Final
The Southern California Gas Company has developed several
Building
Building and Zoning
programs which are intended to assist in the selection of the most
Inspection
energy- efficient water heaters and furnaces. The property
owner /developer shall implement a program, as required, to reduce the
19
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
demand on natural gas supplies.
66
Prior to Issuance of
The property owner /developer shall demonstrate on plans that fuel
Building
each building permit
efficient models of gas - powered building equipment have been
incorporated into the project, to the extent feasible.
67
Prior to Each Final
A study of area television reception shall be undertaken by the property
Development
Building and Zoning
owner /developer and submitted to the City Engineer for review and
Services
Inspection
approval. If the City of Anaheim determines that the proposed project
creates a significant impact on broadcast television reception at local
residences and other existing hotels /restaurants or other businesses, a
signal booster or relay system shall be installed by the property
owner /developer immediately on the roof of the tallest project building
to restore television reception to its original condition. In no event shall
heights set forth in Section 18.04.035 of the Anaheim Municipal Code
entitled, "Structural Height Limitations - Anaheim Commercial
Recreation Area' be exceeded.
20
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Number
Timing
Measure
Responsible for
Monitoring
Completion
68
Prior to approval of
The property owner /developer shall participate in the City's Master
Development
a final subdivision
Plan of Storm Drains and related Infrastructure Improvement (Fee)
Services
map, or issuance of
Program to assist in mitigating existing and future storm drainage
a grading or
system deficiencies as follows.
building permit,
whichever occurs
The property owner /developer shall submit a report for review and
first
approval by the City Engineer to assist with determining the following:
• If the specific development/redevelopment does not increase or
redirect current or historic storm water quantities /flows, then the
property owner's/ developer's responsibility shall be limited to
participation in the Infrastructure Improvement (Fee) Program to
provide storm drainage facilities in 10- and 25 -year storm
frequencies and to protect properties /structures for a 100 -year
storm frequency.
• If the specific development/redevelopment increases or redirects
the current or historic storm water quantity /flow, then the property
owner /developer shall be required to guarantee mitigation to the
satisfaction of the City Engineer and City Attorney's Office of the
impact prior to approval of a final subdivision map or issuance of a
grading or building permit, whichever occurs first, pursuant to the
improvements identified in the Master Plan of Drainage for the
South Central Area. The property owner /developer shall be
required to install the storm drainage facilities as recommended by
the Master Plan of Drainage for the South Central Area to provide
storm drainage facilities for 10- and 25 -year storm frequencies and
to protect properties /structures for a 100 -year storm frequency prior
to acceptance for maintenance of public improvements by the City
or final building and zoning inspection for the building /structure,
whichever occurs first. Additionally, the property owner /developer
shall participate in the Infrastructure Improvement (Fee) Program
as determined by the City Engineer which could include fees,
credits, reimbursements, or a combination thereof. As part of
guaranteeing the mitigation of impacts on the storm drainage
system, a storm drainage system improvement phasing plan for the
project shall be submitted by the property owner /developer to the
City Engineer for review and approval and shall contain, at a
minimum, (1) a layout of the complete system; (2) all facility sizes,
21
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
including support calculations; (3) construction phasing; and,
(4) construction estimates.
(Note: The City has adopted the Storm Drain Impact and Improvement
Fee Program for the South Central City Area. Compliance with this
Fee Program by the property owner /developer (per Ordinance No.
5491 and Resolution No. 95R -61 dated April 18, 1995) shall satisfy the
requirements of this mitigation measure).
69
Prior to Issuance of
The property owner /developer shall submit plans showing that each
Building
Each Building
structure will comply with the State Energy Efficiency Standards for
Permit; to be
Nonresidential Buildings (Title 24, Part 6, Article 2, California Code of
Implemented Prior
Regulations); and, will consult with the City of Anaheim Utilities
to Each Final
Department, Resource Efficiency Division in order to review above Title
Building and Zoning
24 measures to incorporate into the project design including energy
Inspection
efficient designs.
70
Prior to Final
The property owner /developer shall implement energy- saving practices
Building
Building and Zoning
in compliance with Title 24, which may include the following:
Inspection
Use of high- efficiency air conditioning systems controlled by a
computerized management system including features such as a
variable air volume system, a 100 - percent outdoor air economizer
cycle, sequential operation of air conditioning equipment in
accordance with building demands, isolation of air conditioning to
any selected floor or floors.
• Use of electric motors designed to conserve energy.
• Use of special lighting fixtures such as motion sensing lightswitch
devices and compact fluorescent fixtures in place of incandescent
lights.
• Use of T8 lamps and electronic ballasts. Metal hallide or high -
pressure sodium for outdoor lighting and parking lots.
71
Prior to Issuance of
The property owner /developer shall install an underground electrical
Electrical
Each Building
service from the Public Utilities Distribution System. The Underground
Engineering
Permit for Any
Service will be installed in accordance with the Electric Rules, Rates,
Building Requiring a
Regulations and Electrical Specifications for Underground Systems.
Change in Electrical
Electrical Service Fees and other applicable fees will be assessed in
Service
accordance with the Electric Rules, Rates, Regulations and Electrical
Specifications for Underground Systems.
72
Prior to Installation I
The property owner /developer shall submit evidence that the
Electrical
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
of Any
transformers are PCB free.
Engineering
Transformers
73
Prior to Each Final
The Southern California Gas Company has developed several
Resource Efficiency
Building and Zoning
programs which are intended to assist in the selection of the most
Inspection
energy- efficient water heaters and furnaces. The property
owner /developer shall implement a program, as required, to reduce the
demand on natural gas supplies.
74
Prior to Approval of
The property owner /developer shall submit a letter identifying the
Development
Each Grading Plan.
certified archaeologist that has been hired to ensure that the following
Services
actions are implemented:
The archaeologist must be present at the pre - grading conference in
order to establish procedures for temporarily halting or redirecting work
to permit the sampling, identification, and evaluation of artifacts if
potentially significant artifacts are uncovered. If artifacts are uncovered
and determined to be significant, the archaeological observer shall
determine appropriate actions in cooperation with the property
owner /developer for exploration and /or salvage.
Specimens that are collected prior to or during the grading process will
be donated to an appropriate educational or research institution.
Any archaeological work at the site shall be conducted under the
direction of the certified archaeologist. If any artifacts are discovered
during grading operations when the archaeological monitor is not
present, grading shall be diverted around the area until the monitor can
survey the area.
A final report detailing the findings and disposition of the specimens
shall be submitted to the City Engineer. Upon completion of the
grading, the archaeologist shall notify the City as to when the final
report will be submitted.
75
Prior to Approval of
The property owner /developer shall submit a letter identifying the
Department
Each Grading Plan.
certified paleontologist that has been hired to ensure that the following
Services
actions are implemented:
The paleontologist must be present at the pre - grading conference in
order to establish procedures to temporarily halt or redirect work to
permit the sampling, identification, and evaluation of fossils if
23
MITIGATION MONITORING PROGRAM NO. 156A
Mitigation
Measure
Responsible for
Number
Timing
Measure
Monitoring
Completion
potentially significant paleontological resources are uncovered. If
artifacts are uncovered and found to be significant, the paleontological
observer shall determine appropriate actions in cooperation with the
property owner /developer for exploration and /or salvage.
L
Specimens that are collected prior to or during the grading process will
.L
be donated to an appropriate educational or research institution.
24
TABLE AQ -7
ATTORNEY GENERAL'S RECOMMENDED PROJECT -LEVEL MEASURES
ID
Suggested Mitigation Measures
This project
Energy Efficiency
GCC -1 -1
Design buildings to be energy efficient. Site buildings to take advantage
YES, Building floor plan is oriented having the long direction running
of shade, prevailing winds, landscaping and sun screens to reduce
east/west. The majority of glass is on the north side. South- and west - facing
energy use.
glass will be heat - reducing, Low -E type, with shading coefficients responding
to orientation. West- facing glass is limited to a narrow building end exposure.
GCC -1 -2
Install efficient lighting and lighting control systems. Use daylight as an
YES, Guest rooms will employ an occupancy -based lighting control system.
integral part of lighting systems in buildings.
Guest rooms also have significant access to daylight. Primary meeting and
entertainment spaces are located on the top floor of the hotel allowing day
lighting with skylights into pre- function and gathering areas. Other public
spaces and corridors will employ high efficiency fluorescent lighting.
GCC -1 -3
Install light colored "cool" roofs, cool pavements, and strategically placed
YES, Hotel roofs will be comprised of "cool roof' materials with SRI meeting
shade trees
LEED criteria.
GCC -1 -4
Provide information on energy management services for large energy
N/A
users.
GCC -1 -5
Install energy efficient heating and cooling systems, appliances and
YES, Mechanical heating and cooling systems will be central plant based
equipment, and control systems.
high efficiency systems. Guest rooms will be provided with automatic set-
back controls to reduce energy use in unoccupied rooms.
GCC -1 -6
Install light emitting diodes (LEDs) for traffic, street and other outdoor
NOT PROPOSED BY APPLICANT
lighting.
GCC -1 -7
Limit the hours of operation of outdoor lighting.
NO
GCC -1 -8
Use solar heating, automatic covers, and efficient pumps and motors for
YES, The pool will use solar- assisted heating with efficient pumps and filter
pools and spas.
equipment.
GCC -1 -9
Provide education on energy efficiency.
YES, Hotel website and literature will feature energy conservation strategies
as part of the Guest information and education program.
Renewable Energy
GCC -1 -10
Install solar and wind power systems, solar and tankless hot water
heaters, and energy - efficient heating ventilation and air conditioning.
NOT PROPOSED BY APPLICANT
Educate consumers about existing incentives.
GCC -1 -11
Install solar panels on carports and over parking areas.
N/A
GCC -1 -12
Use combined heat and power in appropriate applications.
N/A
Water Conservation and Efficiency
GCC -1 -13
Create water - efficient landscapes.
YES, Landscape areas are very limited and include water efficient plantings
and irrigation systems. Turf areas are minimal.
-25-
ID
Suggested Mitigation Measures
This project
GCC -1 -14
Install water - efficient irrigation systems and devices, such as soil
YES, Irrigation systems will employ weather data integrated controls and
moisture -based irrigation controls.
efficient irrigation delivery systems including drip.
GCC -1 -15
Use reclaimed water for landscape irrigation in new developments and on
The property owner /developer shall install piping onsite with project water
public property. Install the infrastructure to deliver and use reclaimed
mains so that reclaimed water may be used for landscape irrigation, if and
water.
when is becomes available from the County Sanitation District of Orange
County.
GCC -1 -16
Design buildings to be water - efficient. Install water - efficient fixtures and
NOT PROPOSED BY APPLICANT
appliances.
GCC -1 -17
Use graywater. ( Graywater is untreated household waste water from
bathtubs, showers, bathroom wash basins, and water from clothes
YES
washing machines.) For example, install dual plumbing in all new
development allowing graywater to be used for landscape irrigation.
GCC -1 -18
Restrict watering methods (e.g., prohibit systems that apply water to non-
YES, Irrigation systems will be high efficiency with minimum spray type
vegetated surfaces) and control runoff.
delivery carefully planned and adjusted to apply water only to vegetated
areas and to limit over - spray.
GCC -1 -19
Restrict the use of water for cleaning outdoor surfaces and vehicles.
NO
GCC -1 -20
Implement low- impact development practices that maintain the existing
N/A The site is currently fully developed with extensive areas of surface
hydrologic character of the site to manage storm water and protect the
parking. The new development will maintain the current drainage patterns
environment. (Retaining storm water runoff on -site can drastically reduce
and storm water quantities.
the need for energy- intensive imported water at the site.)
GCC -1 -21
Devise a comprehensive water conservation strategy appropriate for the
project and location. The strategy may include many of the specific items
NOT PROPOSED BY APPLICANT
listed above, plus other innovative measures that are appropriate to the
specific project.
GCC -1 -22
Provide education about water conservation and available programs and
YES, Hotel website and literature will feature water conservation strategies as
incentives.
part of the Guest information and education program.
Solid Waste Measures
GCC -1 -23
Reuse and recycle construction and demolition waste (including, but not
YES, The project will institute a demolition and construction waste diversion
limited to, soil, vegetation, concrete, lumber, metal, and cardboard).
program, coordinated with the local waste management company, to achieve
a goal of 50% diversion /recycle of demolition and construction waste.
GCC -1 -24
Provide interior and exterior storage areas for recyclables and green
YES, The project includes waste collection areas suitable for sorting and
waste and adequate recycling containers located in public areas.
storing recyclable materials. A recycling program will be coordinated with the
local waste management company to recycle glass, metals, plastic,
cardboard, and green waste.
GCC -1 -25
Recover by- product methane to generate electricity.
N/A
GCC -1 -26
Provide education and publicity about reducing waste and available
YES, Hotel website and literature will feature operational waste recycling
recycling services.
strategies as part of the Guest information and education program.
-26-
ID
I Suggested Mitigation Measures
This project
Land Use Measures
GCC -1 -27
Include mixed -use, infill, and higher density in development projects to
YES, The project includes mixed -use retail on the street level. This retail will
support the reduction of vehicle trips, promote alternatives to individual
serve the daily needs of hotel Guests as well as the public. The hotel is a
vehicle travel, and promote efficient delivery of services and goods.
dense developmental use of the site, with easy pedestrian access to the
major local tourist attractions (Disneyland Resort and Anaheim Convention
Center). Additional entertainment and food/beverage locations are within
easy walking distance. The hotel also has accommodated tour bus and
shuttle stops on site.
GCC -1 -28
Educate the public about the benefits of well- designed, higher density
N/A
development.
GCC -1 -29
Incorporate public transit into project design.
YES, The project accommodates tour busses, a local tourist shuttle, and is
easily accessed from existing public transit (bus) stops. The site is located
along the route for the proposed monorail extension planned by Anaheim.
GCC -1 -30
Preserve and create open space and parks. Preserve existing trees, and
N/A
plant replacement trees at a set ratio.
GCC -1 -31
Develop "brownfields" and other underused or defunct properties near
YES, The site is not a "brownfield" site, but it is definitely under -used for a
existing public transportation and jobs.
major intersection in the heart of the Anaheim resort district. By bringing a
greater number of hotel rooms close to the prime attractions in the area, the
development increases the use and number of jobs that have easy access of
public transportation.
GCC -1 -32
Include pedestrian and bicycle -only streets and plazas within
developments. Create travel routes that ensure that destinations may be
N/A
reached conveniently by public transportation, bicycling or walking.
Transportation and Motor Vehicles
GCC -1 -33
Limit idling time for commercial vehicles, including delivery and
YES, Idling time for deliveries will be controlled by hotel operational
construction vehicles.
requirements. Construction vehicle idling time can be restricted through
specification requirements.
GCC -1 -34
Use low or zero - emission vehicles, including construction vehicles.
NO
GCC -1 -35
Promote ride sharing programs e.g., by designating a certain percentage
of parking spaces for ride sharing vehicles, designating adequate
YES, Ride sharing will be encouraged using programs targeted at hotel
passenger loading and unloading and waiting areas for ride sharing
employees, providing preferred parking or a cost offset for ride sharing and
vehicles, and providing a web site or message board for coordinating
car pooling.
rides.
GCC -1 -36
Create car sharing programs. Accommodations for such programs
include providing parking spaces for the car share vehicles at convenient
NOT PROPOSED BY APPLICANT
locations accessible by public transportation.
GCC -1 -37
Create local "light vehicle" networks, such as neighborhood electric
NO
vehicle (NEV) systems.
27-
ID
Suggested Mitigation Measures
This project
GCC -1 -38
Provide the necessary facilities and infrastructure to encourage the use of
low or zero - emission vehicles (e.g., electric vehicle charging facilities and
NOT PROPOSED BY APPLICANT
conveniently located alternative fueling stations).
GCC -1 -39
Increase the cost of driving and parking private vehicles by, e.g., imposing
YES, Fees will be charged for on -site parking.
tolls and parking fees.
GCC -1 -40
Build or fund a transportation center where various public transportation
NO
modes intersect.
GCC -1 -41
Provide shuttle service to public transit.
YES, The project will provide a stop and load /unload area for the shuttle that
currently serves the resort district.
GCC -1 -42
Provide public transit incentives such as free or low -cost monthly transit
YES, The use of public transit will be encouraged by implementing a reduced
passes.
cost transit pass program for hotel employees.
GCC -1 -43
Promote 'least polluting' ways to connect people and goods to their
NOT PROPOSED BY APPLICANT
destinations.
GCC -1 -44
Incorporate
bicycle lanes and routes into street systems, new
N/A
subdivisions,
and large developments.
GCC -1 -45
Incorporate bicycle - friendly intersections into street design.
N/A
GCC -1 -46
For commercial projects, provide adequate bicycle parking near building
entrances to promote cyclist safety, security, and convenience. For large
YES, Secure bicycle storage for employees will be provided in the basement
employers, provide facilities that encourage bicycle commuting, including,
adjacent to the primary staff entry and Back -of -House areas.
e.g., locked bicycle storage or covered or indoor bicycle parking.
GCC -1 -47
Create bicycle lanes and walking paths directed to the location of schools,
N/A
parks and other destination points.
GCC -1 -48
Work with the school district to restore or expand school bus services.
N/A
GCC -1 -49
Institute a telecommute work program. Provide information, training, and
incentives to encourage participation. Provide incentives for equipment
N/A
purchases to allow high - quality teleconferences.
GCC -1 -50
Provide information on all options for individuals and businesses to
reduce transportation - related emissions. Provide education and
NOT PROPOSED BY APPLICANT
information about public transportation.
SRI — Solar Reflective Index
Source: DOJ 2008.
-28-