1770 S HARBOR BLVD 138 (2)City of Anaheim
Building Division
-
�p..@M C-1
�� �/� o� �o
::.., ii ' -p 1s1�'1)t
-\.'\. ....l- -�- y
'\� ,c,.o "'"'
(JNoED''I,
Do not ocCUl!Jl this building until the final insl!ections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items hpv� been signe4-7 .,,..
Plumbing (Ground/Underfloor Drain Waste) rzJ;/;t/ I��
Electrical Ground Electrode/Ufer I/ (
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned·
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out) �
Rough Duct (Mechanical) )•:Y1-l� iH_ JIM�
Rough Mechanical l 1 �1/lt P( 'IJ
Rough Electrical I 1c.(l 1e;, �· 1� A -
Rough COA/Mitagation Measures .
Framing (Only after Plbg., Ele., Mee. & Fire) �,t,s p.()p -...... .-----
Insulation (Sound/Energy) '
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Cnndruction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
Inn nnt h:ackfill ,miP.SS c;nnon off\
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are rele�sed
Final Gas Test ()/6/15 w JJJ -;;;:--
Electrical Final ;:;7,Jt; • l'lf�.
Plumbing Final ll1f� d '\.:)V
Mechanical Final 2,:r,,115 .Y
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
J -.,,,
Plumbing Inspections
Electrical Inspections
11/24/2015