RES-2020-033 RESOLUTION NO: 2 0 2 0—0 3 3
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF ANAHEIM ADOPTING THE FY 2020-21
PROJECT LIST FOR THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi-modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of our City are aware of the projects proposed for funding in our community and which
projects have been completed each fiscal year; and
WHEREAS,the City must adopt a list of all projects proposed to receive funding from the
Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget,
which must include a description and the location of each project, a proposed schedule for the
project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $6,484,839.00 in RMRA funding in FY
2020-21 from SB 1; and
WHEREAS, this is the fourth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects for the public;
and
WHEREAS, the City has obtained and considered public input into the City's project list;
. and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that also
meet the City's' priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate nine
neighborhoods and three arterial streets throughout the City in FY 2020-21; and
WHEREAS,the SB 1 project list and overall investment in City's local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete street
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive benefits citywide
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Anaheim
does hereby resolve as follows:
1. The foregoing recitals are true and correct.
2. The City of Anaheim is adopting the list of projects attached hereto as Exhibit"A"planned
to be funded in Fiscal Year 2020-21 with Road Maintenance and Rehabilitation
Accountability Act revenues, as well as the list of projects previously adopted in FY 2019-
20.
3. The City of Anaheim hereby adopts the Fiscal Year 2020-21 project list in Exhibit"A."
THE FOREGOING RESOLUTION is approved and adopted by the City Council of the
City of Anaheim this 7tn day of April , 2020, by the following roll-call vote:
AYES: Mayor Sidhu and Council Members Faessel, Barnes,
Brandman, Moreno, Kring, and O ' Neil
NOES: None
ABSENT: None
ABSTAIN: None
CITY OF ANAHEIM
BY: A A ., i i 4 g
M o ' • ' ; i I Y � ANAHEIM
AT
CITY CLERK SF THE CITY OF ANAHEIM
137098
EXHIBIT "A"
City of Anaheim
FISCAL YEAR 2020-21 PROJECT LIST FOR THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
unir Project Estimated Completion Date Estimated
No. Tracker icy PROJECT TITLE (Mo-Yr) Useful Life Project Description Project Location
Pre-construction Construction
PROJECTS ADOPTED IN FY 2018-19 AND SCHEDULED TO BE COMPLETED IN FY 2020-21
The project improvements include removing and reconstructing the pavement in the roadway, (District 5)-Acacia Neighborhood bordered by La
L243 3055 Acacia Neighborhood Rehabilitation(Phase-2) Jan-20 Aug 20 7-20 years applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Palma Avenue to the north,State College Boulevard
ramps),replacing signs,pavement striping and pavement markings- to the east,Lincoln Avenue to the south,and East
Street to the west
The project will address poor drainage areas throughout the community by constructing new (District 3)-Sabina Neighborhood(Project-C)-
Northeast Anaheim Colony(Sabina)Neighborhood Rehabilitation concrete curb and gutter.The project improvements will also include cold planing and bordered by La Palma Avenue to the north,East Street
L229 2351 fun-20 Feb-21 7-20 years resurfacing the road with an asphalt concrete overlay,the replacement and construction of new to the east,Sycamore Street to the south,and Pauline
(Phase-2)
ADA access ramps,and the replacement of uneven and broken sidewalks. Street to the west
1167, The road rehabilitation work consists of cold planing,resurfacing the road with an asphalt (District 4)-Orangewood Avenue from Harbor
L177 1399 Orangewood Avenue Rehabilitation Jun-20 Aug-20 10-15 years concrete overlay,and the replacement of traffic striping,traffic signal loops,and pavement Boulevard to Lewis Street
markings.
The road rehabilitation work consists of cold planing and resurfacing the road with an asphalt (District 6)-Weir Canyon Road from Serrano Avenue
L201 2031 Weir Canyon Road Rehabilitation Apr-20 Jul-20 10-15 years concrete overlay,AC berms,and replacement of traffic striping,traffic signal loops,and to Parkglen Place
pavement markings.
PROJECTS ADOPTED IN FY 2019-20 AND SCHEDULED TO BE COMPLETED IN FY 2020-21
The project improvements include removing and reconstructing the pavement in the roadway, (District 1)-Lindacita Neighborhood bordered by
1246 1926 Lindacita Neighborhood Rehabilitation Jul-19 Ott-20 7-20 years applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Lincoln Avenue to the north,Beach Boulevard to the
ramps),replacing signs,pavement striping and pavement markings. east,Orange Avenue to the south,and Knott Avenue
to the west
The project improvements include removing and reconstructing the pavement in the roadway, (District 1)-Valdina Neighborhood bordered by La
1247 1772 Valdina Neighborhood Rehabilitation Aug-19 Oct-20 7-20 years applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Palma Avenue to the north,Brookhurst Street to the
ramps),replacing signs,pavement striping and pavement markings. east,Crescent Avenue to the south,and Gilbert Street
to the west
The project improvements include removing and reconstructing the pavement in the roadway, (District 2)-Crescent Neighborhood bordered by
1248 1777 Crescent Neighborhood Rehabilitation Sep-19 Oct-20 7-20 years applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Catalpa Avenue to the north,Euclid Street to the east,
ramps),replacing signs,pavement striping and pavement markings. I-5 Freeway to the south,and Chippewa Avenue to
the west
The road rehabilitation work consists of cold planing and resurfacing the road with an asphalt (Districts 3&4)-Ball Road from West Place to
concrete overlay,the removal and reconstruction of ADA access ramps,curb and gutter, Claremont Street
1164 1396 Ball Road Rehabilitation May-20 Aug-20 10-15 years commercial driveway approaches,concrete sidewalk,and replacement of traffic striping,traffic •
signal loops,and pavement markings.Project Partnering with APU-Water to cost share on the
road rehabilitation of the impacted road segments due to water line improvements.
PROPOSED PROJECT UST FOR FY 2020-21
The project improvements include removing and reconstructing the pavement in the roadway, (District 5)-Torry Neighborhood bordered by South
applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Street to the north,SR-57 Freeway to the east,Ball
1253 3681 Torry Neighborhood Rehabilitation Oct-20 Jun-21 7-20 years ramps),replacing signs,pavement striping and pavement markings. Road/Carl Street End of Cul-De-Sac to the south,and
State College Boulevard/Sunkist Street to the west
The project improvements include removing and reconstructing the pavement in the roadway, (District 6)-Avenida Bernardo Neighborhood
applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access bordered by Santa Ma Canyon Road to the north,
1254 1648 Avenida Bernardo Neighborhood Rehabilitation Oct-20 Jun-21 7-20 years ramps),replacing signs,pavement striping and pavement markings. Imperial Highway to the east,Nantucket
Lane/Tisbury Court to the south,and Andover
Drive/Fairlee Court to the west
The project improvements include removing and reconstructing the pavement in the roadway, (District 6)-Riverdale Neighborhood bordered by
•
1255 1860 Riverdale Neighborhood Rehabilitation Oct-20 Jun-21 7-20 years applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Alderdale Avenue to the north,Lakeview Avenue to
ramps),replacing signs,pavement striping and pavement markings. the east,Santa Ana Canyon Road to the south,and SR
91 Freeway to the west.
The project improvements include removing and reconstructing the pavement in the roadway, (District 2)-Lotus Neighborhood bordered by
1256 3683 Lotus Neighborhood Rehabilitation Oct-20 Jun-21 7-20 years applying slurry seal,replacing damaged areas of concrete(sidewalk,curb and gutter,and access Coronet Avenue to the north,Holly Street to the east,
ramps),replacing signs,pavement striping and pavement markings. La Palma Avenue to the south,and Brookhurst Street
to the west
3/17/2020 1 of 1
CLERK'S CERTIFICATE
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM
I, THERESA BASS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the
original Resolution No. 2020-033 adopted at a regular meeting provided by law, of the Anaheim
City Council held on the 7th day of April, 2020 by the following vote of the members thereof:
AYES: Mayor Sidhu and Council Members Faessel, Barnes, Brandman, Moreno,
Kring and O'Neil
NOES: None
ABSENT: None
ABSTAIN: None
IN WITNESS WHEREOF, I have hereunto set my hand this 7th day of April, 2020.