RES-2020-093 RESOLUTION NO. 2020- 093
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ANAHEIM RATIFYING AND APPROVING THE ACTIONS OF
THE ANAHEIM DIRECTOR OF PUBLIC WORKS, OR
DESIGNEE, IN SUBMITTING A GRANT APPLICATION ON
BEHALF OF THE CITY OF ANAHEIM TO THE STATE
WATER RESOURCES CONTROL BOARD DIVISION OF
FINANCIAL ASSISTANCE FOR THE PROPOSITION 1
STORM WATER GRANT PROGRAM FOR THE STATE
COLLEGE BOULEVARD STORMWATER CAPTURE
PROJECT AND IF AWARDED, AUTHORIZING THE
ACCEPTANCE OF SUCH GRANT ON BEHALF OF THE CITY
AND AMENDING THE BUDGET ACCORDINGLY AND
DETERMINING THAT THESE ACTIONS ARE EXEMPT
FROM THE CALIFORNIA ENVIRONMENTAL QUALITY
ACT (CEQA) PURSUANT TO GUIDELINE SECTIONS 15301
AND 15302.
WHEREAS, the City of Anaheim has prepared an application to apply for
funding from the State Water Resources Control Board's Division of Financial Assistance
("Grantor"); and
WHEREAS, the funding opportunity is provided by State Water Resources
Control Board through their Grant Program for the Storm Water Grant Program's
Proposition 1 Round 2 Implementation Grant solicitation("Grant"); and
WHEREAS, on July 2, 2020, the Public Works Director, through his
designee, and on behalf of the City of Anaheim, submitted an application to Grantor for
said Grant; and
WHEREAS, the City received approval for funding by the Grantor for the State
College Boulevard Stormwater Capture Project("Project"); and
WHEREAS, the City of Anaheim ("City"), will negotiate and enter into
an agreement with Grantor to carry out the Project; and
WHEREAS,the City is familiar with the terms, conditions, and limitations of any
such Grant; and
WHEREAS, the City desires to accept any such Grant which may be awarded to
the City.
1
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of Anaheim as follows:
1. Approves and ratifies the actions of the Director of Public Works or
designee in filing of an application for the implementation of the State College Boulevard
Stormwater Capture Project.
2. Certifies that the City understands the City will work with Grantor to meet
established deadlines for entering into a grant or cooperative agreement.
3. Certifies that the City is capable of providing the amount of funding specified
in the application.
4. Certifies that the City understands the assurances and certifications in the
application.
5. Certifies that the City will have sufficient Funds to operate and maintain the
Project consistent with the land tenure requirements; or will secure the resources to do so.
6. Certifies that it will comply with all provisions of Section 1771.5 of the
California Labor Code.
7. If applicable, certifies that the Project will comply with any laws and
regulations, legal requirements for building codes, health and safety codes, disabled access
laws, and, that prior to commencement of construction, all applicable permits will have been
obtained.
8. The actions of the Director of Public Works, or his/her designee in submitting
the Grant application for and on behalf of the City of Anaheim, a public entity established
under the laws of the State of California, is hereby ratified and approved and the Anaheim
Director of Public Works, or his/her designee is authorized to take any actions necessary for
the purpose of obtaining financial assistance provided by the Grantor.
9. The City Council of the City of Anaheim hereby agrees to, and by this
resolution, does accept any such Grant so awarded to the City of Anaheim without further
action of the City Council being required.
10. The City of Anaheim hereby affirms its compliance and agreement to comply
with each and all of the terms, conditions and limitations imposed by the Granter upon said
Grant, and the City Council hereby ratifies actions taken by and approves actions to be taken
on behalf of the City by Anaheim Director of Public Works or his/her designee, including but
not limited to, execution of any agreements, assurances, or other documents as may be
necessary in connection with completion of the Project(s) and the acceptance of said Grant as
may be required by the Grantor, if such Grant is awarded to the City.
2
11. The Director of Public Works, or his/her designee, is designated to provide the
assurances, certifications, and commitments required for the financial assistance application,
including executing a financial assistance agreement from the State Water Resources Control
Board and any amendments or changes thereto.
12. The Director of Public Works, or his/her designee,is designated to represent the
City of Anaheim in carrying out the City of Anaheim's responsibilities under the assistance
agreement, including certifying disbursement requests on behalf of the City of Anaheim and
compliance with applicable requirements; and
13. Contingent upon the award of said Grant, the annual budget of the City of
Anaheim is hereby amended by increasing revenue and expenditures in an amount equal to
the amount of the Grant Funds awarded; and
14. Pursuant to and in accordance with the provisions of the California
Environmental Quality Act(Public Resources Code Section 21000 et seq.; herein referred to
as "CEQA"), the State of California Guidelines for Implementation of the California
Environmental Quality Act(Title 14 of the California Code of Regulations; herein referred to
as the "CEQA Guidelines"), and the City's Local CEQA Procedure Manual, the City is the
"lead agency" for the preparation and consideration of environmental documents for the
Proposed Project; and
15. The City Council finds and determines that the effects of the Proposed Project
are typical of those generated within that class of projects (i.e., Class 1 - Existing Facilities)
which consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor
alteration of existing public or private structures, facilities, mechanical equipment, or
topographical features, involving negligible or no expansion of use beyond that existing at
the time of this determination, and (i.e., Class 2, Replacement or Reconstruction) which
consists of replacement or reconstruction of existing structures and facilities where the new
structure will be located on the same site as the structure replaced and will have substantially
the same purpose and capacity as the structure replaced, and that, therefore, pursuant to
Sections 15301 and 15302 of Title 14 of the California Code of Regulations, the Proposed
Project will not cause a significant effect on the environment and is, therefore, categorically
exempt from the provisions of CEQA.
3
THE FOREGOING RESOLUTION is approved and adopted by the City Council
of the City of Anaheim this 28th day of July, 2020, by the following roll-call vote:
AYE:Mayor Sidhu and Council Members Faessel, Barnes, Brandman ,
Moreno, Kring, and O'Neil
NOES:None
ABSENT: None
ABSTAIN:None
CITY IF ANAHEIM
iAAA1 l 1 ,. 1
A O ' OF TH: e T •F ANAHEIM
ATTEST:
CITY CLERK OF THE CITY OF ANAHEIM
138271
4
7,47** CITY OF ANAHEIM
\ taw.- ;
a NOTICE OF EXEMPTION
\OQDiD
To: ® Orange County Clerk-Recorder ® Office of Planning and Research
County Administration South 1400 Tenth Street,Room 121
601 N Ross Street Sacramento,CA 95814
Santa Ana,CA 92702
From: City of Anaheim
Public Works Department
200 S.Anaheim Blvd,MS 276
Anaheim,CA 92805
PROJECT TITLE&FILE NUMBER: State College Boulevard Stormwater Capture Project
July 28,2020 City Council Agenda
PROJECT LOCATION-Specific: State College Boulevard from Orangewood Avenue to Wagner Avenue.
PROJECT LOCATION—City/County: City of Anaheim,Orange County,California
PROJECT DESCRIPTION: This project will reactivate approximately 10,000 feet of large diameter abandoned reinforced
concrete conveying wastewater pipe(36"—42")for retention/detention of surface runoff wastewater.The project will also divert
wastewater away from other adjacent wastewater facilities to help reduce the risk of local flooding in the area.
PUBLIC AGENCY APPROVING PROJECT: City of Anaheim
PROJECT APPLICANT: City of Anaheim PHONE NUMBER: (714)765-5176
Department of Public Works
Keith Linker,Principal Civil Engineer
ADDRESS: 200 South Anaheim Blvd. ZIP CODE: 92805
Anaheim,CA
EXEMPT STATUS: 0 Ministerial(Section 21080(b)(1); 15268)
❑ Declared Emergency(Section 21080(b)(3))
❑ Emergency Project(Section 21080(b)(2))
EL Categorical Exemption. Class 1,Section 15301,Existing Facilities,and Class 2,Section 15302,
Replacement or Reconstruction
❑ Statutory Exemption. State code number:
❑ Other:Section15060(c)(2).
REASONS WHY PROJECT IS EXEMPT: The effects of the proposed project are typical of those generated within the Class 1
(Existing Facilities)and Class 2(Replacement or Reconstruction)Categorical Exemptions. Class 1 consists of the operation,repair,
maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical
equipment,or topographical features,involving negligible or no expansion of existing or former use. The Project will reactivate an
existing wastewater pipe for retention/detention of surface runoff wastewater. Class 2 consists of replacement or reconstruction of
existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have
substantially the same purpose and capacity as the structure replaced,including but not limited to the replacement or reconstruction
of existing utility systems and/or facilities involving negligible or no expansion of capacity. Pursuant to Section 15300.02 (c)and
15301 and 15302 of Title 14 of the California Code of Regulations, there are no unusual circumstances in respect to the proposed
project for which staff would anticipate a significant effect on the environment and, therefore, the proposed project is categorically
exempt from the provisions of CEQA.
STAFF CONTACT PERSON Keith Linker,Principal Civil Engineer PHONE NUMBER:714-765-5176
City Engineer
Authorized Signature—Carlos Castellanos Title Date
Public Works Department
Signed by Lead Agency 0 Signed by Applicant
CLERK'S CERTIFICATE
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, THERESA BASS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the
original Resolution No. 2020-093 adopted at a regular meeting provided by law, of the Anaheim
City Council held on the 28th day of July, 2020 by the following vote of the members thereof:
AYES: Mayor Sidhu and Council Members Faessel, Barnes, Brandman, Moreno,
Kring, and O'Neil
NOES: None
ABSENT: None
ABSTAIN: None
IN WITNESS WHEREOF, I have hereunto set my hand this 29th day of July, 2020.
CITY CLER OF THE CITY OF ANAHEIM
(SEAL)