Loading...
RES-2020-093 RESOLUTION NO. 2020- 093 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM RATIFYING AND APPROVING THE ACTIONS OF THE ANAHEIM DIRECTOR OF PUBLIC WORKS, OR DESIGNEE, IN SUBMITTING A GRANT APPLICATION ON BEHALF OF THE CITY OF ANAHEIM TO THE STATE WATER RESOURCES CONTROL BOARD DIVISION OF FINANCIAL ASSISTANCE FOR THE PROPOSITION 1 STORM WATER GRANT PROGRAM FOR THE STATE COLLEGE BOULEVARD STORMWATER CAPTURE PROJECT AND IF AWARDED, AUTHORIZING THE ACCEPTANCE OF SUCH GRANT ON BEHALF OF THE CITY AND AMENDING THE BUDGET ACCORDINGLY AND DETERMINING THAT THESE ACTIONS ARE EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO GUIDELINE SECTIONS 15301 AND 15302. WHEREAS, the City of Anaheim has prepared an application to apply for funding from the State Water Resources Control Board's Division of Financial Assistance ("Grantor"); and WHEREAS, the funding opportunity is provided by State Water Resources Control Board through their Grant Program for the Storm Water Grant Program's Proposition 1 Round 2 Implementation Grant solicitation("Grant"); and WHEREAS, on July 2, 2020, the Public Works Director, through his designee, and on behalf of the City of Anaheim, submitted an application to Grantor for said Grant; and WHEREAS, the City received approval for funding by the Grantor for the State College Boulevard Stormwater Capture Project("Project"); and WHEREAS, the City of Anaheim ("City"), will negotiate and enter into an agreement with Grantor to carry out the Project; and WHEREAS,the City is familiar with the terms, conditions, and limitations of any such Grant; and WHEREAS, the City desires to accept any such Grant which may be awarded to the City. 1 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Anaheim as follows: 1. Approves and ratifies the actions of the Director of Public Works or designee in filing of an application for the implementation of the State College Boulevard Stormwater Capture Project. 2. Certifies that the City understands the City will work with Grantor to meet established deadlines for entering into a grant or cooperative agreement. 3. Certifies that the City is capable of providing the amount of funding specified in the application. 4. Certifies that the City understands the assurances and certifications in the application. 5. Certifies that the City will have sufficient Funds to operate and maintain the Project consistent with the land tenure requirements; or will secure the resources to do so. 6. Certifies that it will comply with all provisions of Section 1771.5 of the California Labor Code. 7. If applicable, certifies that the Project will comply with any laws and regulations, legal requirements for building codes, health and safety codes, disabled access laws, and, that prior to commencement of construction, all applicable permits will have been obtained. 8. The actions of the Director of Public Works, or his/her designee in submitting the Grant application for and on behalf of the City of Anaheim, a public entity established under the laws of the State of California, is hereby ratified and approved and the Anaheim Director of Public Works, or his/her designee is authorized to take any actions necessary for the purpose of obtaining financial assistance provided by the Grantor. 9. The City Council of the City of Anaheim hereby agrees to, and by this resolution, does accept any such Grant so awarded to the City of Anaheim without further action of the City Council being required. 10. The City of Anaheim hereby affirms its compliance and agreement to comply with each and all of the terms, conditions and limitations imposed by the Granter upon said Grant, and the City Council hereby ratifies actions taken by and approves actions to be taken on behalf of the City by Anaheim Director of Public Works or his/her designee, including but not limited to, execution of any agreements, assurances, or other documents as may be necessary in connection with completion of the Project(s) and the acceptance of said Grant as may be required by the Grantor, if such Grant is awarded to the City. 2 11. The Director of Public Works, or his/her designee, is designated to provide the assurances, certifications, and commitments required for the financial assistance application, including executing a financial assistance agreement from the State Water Resources Control Board and any amendments or changes thereto. 12. The Director of Public Works, or his/her designee,is designated to represent the City of Anaheim in carrying out the City of Anaheim's responsibilities under the assistance agreement, including certifying disbursement requests on behalf of the City of Anaheim and compliance with applicable requirements; and 13. Contingent upon the award of said Grant, the annual budget of the City of Anaheim is hereby amended by increasing revenue and expenditures in an amount equal to the amount of the Grant Funds awarded; and 14. Pursuant to and in accordance with the provisions of the California Environmental Quality Act(Public Resources Code Section 21000 et seq.; herein referred to as "CEQA"), the State of California Guidelines for Implementation of the California Environmental Quality Act(Title 14 of the California Code of Regulations; herein referred to as the "CEQA Guidelines"), and the City's Local CEQA Procedure Manual, the City is the "lead agency" for the preparation and consideration of environmental documents for the Proposed Project; and 15. The City Council finds and determines that the effects of the Proposed Project are typical of those generated within that class of projects (i.e., Class 1 - Existing Facilities) which consist of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of this determination, and (i.e., Class 2, Replacement or Reconstruction) which consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced, and that, therefore, pursuant to Sections 15301 and 15302 of Title 14 of the California Code of Regulations, the Proposed Project will not cause a significant effect on the environment and is, therefore, categorically exempt from the provisions of CEQA. 3 THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this 28th day of July, 2020, by the following roll-call vote: AYE:Mayor Sidhu and Council Members Faessel, Barnes, Brandman , Moreno, Kring, and O'Neil NOES:None ABSENT: None ABSTAIN:None CITY IF ANAHEIM iAAA1 l 1 ,. 1 A O ' OF TH: e T •F ANAHEIM ATTEST: CITY CLERK OF THE CITY OF ANAHEIM 138271 4 7,47** CITY OF ANAHEIM \ taw.- ; a NOTICE OF EXEMPTION \OQDiD To: ® Orange County Clerk-Recorder ® Office of Planning and Research County Administration South 1400 Tenth Street,Room 121 601 N Ross Street Sacramento,CA 95814 Santa Ana,CA 92702 From: City of Anaheim Public Works Department 200 S.Anaheim Blvd,MS 276 Anaheim,CA 92805 PROJECT TITLE&FILE NUMBER: State College Boulevard Stormwater Capture Project July 28,2020 City Council Agenda PROJECT LOCATION-Specific: State College Boulevard from Orangewood Avenue to Wagner Avenue. PROJECT LOCATION—City/County: City of Anaheim,Orange County,California PROJECT DESCRIPTION: This project will reactivate approximately 10,000 feet of large diameter abandoned reinforced concrete conveying wastewater pipe(36"—42")for retention/detention of surface runoff wastewater.The project will also divert wastewater away from other adjacent wastewater facilities to help reduce the risk of local flooding in the area. PUBLIC AGENCY APPROVING PROJECT: City of Anaheim PROJECT APPLICANT: City of Anaheim PHONE NUMBER: (714)765-5176 Department of Public Works Keith Linker,Principal Civil Engineer ADDRESS: 200 South Anaheim Blvd. ZIP CODE: 92805 Anaheim,CA EXEMPT STATUS: 0 Ministerial(Section 21080(b)(1); 15268) ❑ Declared Emergency(Section 21080(b)(3)) ❑ Emergency Project(Section 21080(b)(2)) EL Categorical Exemption. Class 1,Section 15301,Existing Facilities,and Class 2,Section 15302, Replacement or Reconstruction ❑ Statutory Exemption. State code number: ❑ Other:Section15060(c)(2). REASONS WHY PROJECT IS EXEMPT: The effects of the proposed project are typical of those generated within the Class 1 (Existing Facilities)and Class 2(Replacement or Reconstruction)Categorical Exemptions. Class 1 consists of the operation,repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment,or topographical features,involving negligible or no expansion of existing or former use. The Project will reactivate an existing wastewater pipe for retention/detention of surface runoff wastewater. Class 2 consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced,including but not limited to the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. Pursuant to Section 15300.02 (c)and 15301 and 15302 of Title 14 of the California Code of Regulations, there are no unusual circumstances in respect to the proposed project for which staff would anticipate a significant effect on the environment and, therefore, the proposed project is categorically exempt from the provisions of CEQA. STAFF CONTACT PERSON Keith Linker,Principal Civil Engineer PHONE NUMBER:714-765-5176 City Engineer Authorized Signature—Carlos Castellanos Title Date Public Works Department Signed by Lead Agency 0 Signed by Applicant CLERK'S CERTIFICATE STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ANAHEIM ) I, THERESA BASS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original Resolution No. 2020-093 adopted at a regular meeting provided by law, of the Anaheim City Council held on the 28th day of July, 2020 by the following vote of the members thereof: AYES: Mayor Sidhu and Council Members Faessel, Barnes, Brandman, Moreno, Kring, and O'Neil NOES: None ABSENT: None ABSTAIN: None IN WITNESS WHEREOF, I have hereunto set my hand this 29th day of July, 2020. CITY CLER OF THE CITY OF ANAHEIM (SEAL)