Resolution-PC 2020-040WHEREAS, the Planning Commission of the City of Anaheim (the "Planning 06010, residential , in the City of attached currently developed with a single family residence. The Land Use
Element of the Anaheim General Plan Residential land uses. The Property is currently located unit, is a request to permit new lots to front onto a private driveway easement (direct
access to a public or private street or alley is proposed in , which is a request to rezone or reclassify the 00308, Conditional 146 WHEREAS, on March 4, 2020, Governor Newsom proclaimed
a State of Emergency in 19. On March 17, 2020, Governor Newsom issued 20 issued on March 12, 2020), which allows a local legislative body to hold public meetings via teleconferencing
and to make public meetings accessible telephonically or otherwise ublic seeking to observe and to address the local legislative 20 the Planning Commission did hold a notice of said
public hearing having been duly given as required by law and in accordance with the provisions of Chapter 18.60 (Procedures) of the Anaheim Municipal Code (the "Code"), to hear to investigate
and make findings
herein
-
040
ed provisions of Executive Order N
--
,
-
1720
06010
is a request for a 3
(
on September 28, 2020 at 5:00 p.m.,
-
020
46
Permit No. 2019
Zone
05122 and Tentative Parcel Map No. 2
and is
small lot
1
Exhibit A
PC
-
-
AND MAKING CERTAIN FINDINGS IN CONNECTION THEREWITH
7
all
CONDITIONAL USE PERMIT NO. 2019
201
Residential
A RESOLUTION OF THE PLANNING COMMISSION OF THE
lot subdivision
1679 West Cerritos Avenue
.
WHEREAS, the Property is approximately 0.51 acres in size
NO
-
lot
Anaheim, County of Orange, State of California, as generally depicted on
. Reclassification No. 2017
MAP
-
Conditional Use
3
a
Family
06010
for
and
and
PARCEL
)
-
46
AVENUE");
05122
is a request for a 3;
040
and
-
-
the “Proposed Project”
1
Permit No. 2019
-
Single
y
-
7
hereto and incorporated herein by this reference (the "Propert
2020
relat
201r evidence for and against the Proposed Project
-
TENTATIVE
Variance No. 2019
)
No.
69
-
Commission") did receive a verified petition to approve "
-
29
WEST CERRITOS
(superseding the Brown Act
RESOLUTION NO. PC
000
4
-teleconferencing public hearing in the City of Anaheim
-
located at
Map
RS
WHEREAS, pursuant to Executive Order N
-
and
08
-
7
-
)
"
1
(DEV201"
06010, Variance No. 2019
3
and recommendations in connection therewith;
8
the
Parcel
00
-
46
Conditional Use
30
-
AND
-
to
California as a result of the threat of COVID
1
00
7
-
CITY OF ANAHEIM APPROVING property
201
7
-
Low Density shall be referred to herein collectively as
Tentative
201
7
Zone
4 zone;
201
Reclassification No.
,
05122Map No.
electronically to all members of the p
"Reclassification No.
79
"T" Transition
for that certain real
6
-
1
-
05122 and
(lot subdivision in the RS
VARIANCE NO. 2019
WHEREAS,
designates the Property for
in the “T” Transition Zone.
Parcel
20
-
-
29
Use Permit No. 2019
entative
-
-
Property from the
Variance No. 2019
Executive Order N
conjunction with
referred to as
subdivision
and conside
T
required);
body; and
-
small
-
25
the Proposed New Construction or Conversion of Small posed are adequate to ensure quality design that is compatible with the
“CEQA”), the State of California Guidelines for Implementation of the California Environmental Quality Act (herein referred to as the "CEQA Guidelines"), and the City's Local CEQA Procedure
Structures) which consist of construction and location of limited numbers of new, small facilities as that conditions rically exempt Family Residential Zone is 4 Zone) of Chapter 18.04
f the Anaheim Municipal Code (the "Code"), which provides WHEREAS, the Planning Commission, after due inspection, investigation and f, and after due consideration of all evidence and
reports subdivision, does find and determine pursuant to Subsection .060 of Section 18.04.160 4 Zone) of the Code, the following facts with respect to Conditional Use The uses within
the Proposed Project are compatible with surrounding land living facility and other New buildings or structures related to the Proposed Project are compatible with the scale, mass,
bulk, and orientation of existing buildings in the surrounding area. The lot adjacent residential neighborhood and is not anticipated to adversely affect development of the ions imposed,
the size and shape of the site is adequate to allow the full development of the Proposed Project in a manner not detrimental to the particular area or to the health, safety and general
welfare designed to provide vehicular access to all three residences via a common driveway minimizing based on the size of the lots, adequate private yard areas, varied architectural
features, and a private
ursuant to and in accordance with the provisions of the California sideration of environmental The Planning family residential re adequate. The Proposed Project is t the proposed development
incorporates these guidelines into the project
-
; herein referred to as
040
The Proposed Project is consistent with the City’s "Guidelines for Small
; and
-
area. With the modifications of certain standards described herein and under the condit
20
s", as that term is defined in Section 15378 of the CEQA Guidelines
,
20
determines that the Property is located within an "urbanized area"
aforementioned
PC
WHEREAS, the Planning Commission finds and determines that
that all such development is subject to the approval of a conditional use permit; and
.
and will not cause a significant effect on the environment and is, therefore, catego
family residences in urbanized areas
-
lot single
et seq.
the assisted
-
meets the
subject to the provisions of Section 18.04.160 (Development in the RS
-
4" Single
Environmental Quality Act (Public Resources Code Section 21000 -
Manual, the City is the "lead agency" for the preparation and con
offered at said hearing with respect to the request to permit a 3
The single family residential use will be compatible with
-
Guidelines and
WHEREAS, all development within the "RS
Vehicular and pedestrian access a
driveway easement for vehicular and pedestrian access.
–
, Class 3
-
2
-
CEQA
-
i.e.
or structures, including up to three single
is within that class of projects (
Section 15387 of the
study made by itself and in its behal
Family Residential Zones) o
from the provisions of CEQA; and
single family homes in the area.
WHEREAS, p
access points on Broadway.
-
06010:
Lot Development" in tha
the RS
Commission finds and
project
sizes and widths pro
term is defined in
-
1.2.3.4.
(Development in
9
"
documents for
Permit No. 201
of the public.
-
Project
(Single
uses.
Family Residential Zone; thus, the size and shape of the site proposed for the use is , does find and residential
of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area in that the Proposed Project, with the
modifications of certain standards described herein below and under conditions imposed, will not adversely affect the adjoining land uses, or the growth and development of the area
in which it is proposed to be located because the lot sizes and widths the adjacent residential traffic generated by the Proposed Project will not impose an undue burden upon the streets
and highways designed and improved to The impact upon the surrounding area has been mitigated to the maximum at site development standards proposed for the Proposed Project are Family
Residential Zone and the eral Plan and Subdivision Map dwelling units per gross lot subdivision is compatible with uses that surround the 4” itional use permit under the conditions
imposed, if WHEREAS, the Planning Commission, after due inspection, investigation and its behalf, and after due consideration of all evidence and reports ts to front onto a private
driveway easement where direct access to a public or private street or alley is There are special circumstances applicable to the Property, including size, Family Any subdivision designed
with residential units at the rear of the property requiring public or private street standards would That, because of the special circumstances identified above, strict oning Code
would deprive the property of privileges enjoyed by other property oped with vehicular would be
dings, which do not apply to other property under identical
-
040
The Proposed Project has been designed to accommodate the required on
; and
-
Project is consistent with the site development standards of the “RS-
determine that the required findings for approval of a variance to permit newly subdivided lo
20
neighborhood and therefore it is not anticipated to adversely affect development of the area.
-
20
” Single
any, will not be detrimental to the health and safety of the citizens of the City of Anaheim
subdivision
PC
In particular, there are other
22
4
-
051
within the “RS
subdivisions, including the abutting property to the east, that have been devel
he design of the
-
9
proposed are adequate to ensure quality design that is compatible with
offered at said hearing with respect to the request for Variance No. 201
6.5
Act in that the City’s General Plan Land Use designation allows up to
.
The Proposed Project complies with the Gen
adequate to allow the full development of the Proposed Project.
-
feet deep
site parking, vehicular circulation, and trash collection and the
4" Single
.
will be
significantly reduce the usable lot area for residential purposes
and pedestrian access from a private driveway easement. T
under identical zoning classification in the vicinity.
-
7
he Property
consistent with the development standards of the "RS
feet wide and 20
Residential General Plan designation.
-
3
The granting of the cond
-
The size and shape
-
T
family small
zoning classification in the vicinity.
shape, topography, location or surroun
7
10
on a lot that is
can be made because:
study made by itself and in
-
.project site. The Proposed
acre. The detached, single
carry the traffic in the area
extent practicable in th
application of the Z
Residential Zone
5.6.7.8.9..2.
1
Low Density
,
required
-
Single
the
at of the adjacent subdivision which provides vehicular and pedestrian access to WHEREAS, the Planning Commission, after due inspection, investigation and study made by itself and in
its behalf, and after due consideration of all evidence and reports lot and with designation zoning and and is of is not likely to cause substantial environmental damage or substantially
and avoidably injure fish or wildlife or in that no The design of the subdivision or the type of improvements is not likely to cause serious public health problems, since any new structures
and associated site improvements er related will be subject to all City code requirements for demolition and of improvements will not conflict with easements, acquired by the public
at large, for access through or use of property within the in that the parcel map is conditioned to be submitted for review and approval d the Orange County Surveyor and then shall
be recorded in the Office WHEREAS, the Planning Commission determines that the evidence in the record o support the actions taken and the findings made in this Resolution, that the
facts stated in this Resolution are supported by substantial evidence in the t from the findings made in this Resolution. The Planning Commission expressly these findings after due
family future development of There is no substantial evidence, nor are there other facts,
residential
-
4040
record, including testimony received at the public hearing, the staff presentations, the staff repor
Single
-
-accordance with the RS
-
3
establish a
20
-
"
20
as part of the future development of single
The proposed subdivision, including its design and improvements,
4
the conditions imposed and oth
The site is physically suitable for the type and size of the proposed
PC
-
sitive environmental habitat has been identified on the site
family dwelling
Density Residential land use
proposed
"RS
,
in the Anaheim General Plan and the development standards contained in the
, does find and determine the following facts:
to
with the conditions imposed
146
in that the proposed lots are consistent with the
in that the future demolition, removal of structures, and
; and
-
2017
arcels that can be developed in
-
single
declares that it considered all evidence presented and reached
of the Orange County Recorder prior to issuance of building permits
Tentative Parcel Map No.
a
The design of the subdivision or the type
in that this flat lot is currently developed with
will be constructed on the property in compliance with
Low
; and
is consistent with the
,
The design of the subdivision
ement
-
4
-
consideration of all evidence presented to it.
multiple units from a common driveway eas
nticipated
respect to
p
and all materials in the project files.
three
residential subdivision
constitutes substantial evidence t
.
on
.
adequate size to subdivide into
designati
roperty
environmental impacts are a
herein
offered at said hearing with
.
zone development standards
ecause no sen
to the City of Anaheim an
s
Zone
residence
P
the conditions imposed
on this
land use
proposed subdivision
Family Residential
Code requirements
with th
1.2.3.4.5.
s
single family
residential use
single family
General Plan
their habitat b
construction.
subdivision
negate
consistent
that
040
-
20
20
PC
-
7
-
Building Department,
RESPONSIBLE
Planning Services
Services DivisionServices DivisionServices DivisionServices DivisionServices Division
DEPARTMENT
Public Works Public Works Public Works Public Works Public Works
Development Development Development Development Development
Planning and
Department,Department,Department,Department,Department,
040
-
20
20
PC
ivate access easement. The width back and to the Orange County Surveyor
Tentative Parcel Map No. 146 and the conceptual Site Plan reviewed by the Planning foot wide planter along the (20 ft. driveway and 2 ft. eim The legal property owner shall irrevocably
offer to dedicate to the City of The developer shall submit the final map to the City of Anaheim, Public The owner shall apply for and obtain vacation of the existing easements on The
developer shall post a Monumentation bond in an amount specified in writing by a Licensed Land Surveyor and approved by the City Engineer and 146 shall be approved in substantial conformance
with
-
of
-
purposes, the right
to the planter per City of Anah
06010
foot
46
-
1
-
-
24
7
CONDITIONAL USE PERMIT NO. 2019
permanent structures.
t long parking stalls and
201
05122
NO.
AL
)
-
MAP
69
9
Anaheim, for road, public utilities and other public
EXHIBIT “B”
CONDITIONS OF APPROV
VARIANCE NO. 201
0 of the access easement shall be increased to 22 feet
Prior to the issuance of the first building permit,
00
Planning Commission resolution for this project.
-
-
Commission shall be modified to depict a two
for technical correctness review and approval.
PARCEL
7
-
8
201
-
east property line for the length of the pr
Attorney.
DEV
site that are in conflict with the proposed
Works Development Services Division
45 ft. in width on Cerritos Avenue
ooparking stalls
TENTATIVE
(
f
-
.
way easements described below:
both 18
Engineering Standard Detail 470
PRIOR TO FINAL MAP APPROVAL
in a form approved by the City
planter) while providing
distance from the
-
Parcel Map 2017
-
2017
up
•
NO.
123456
Building Department,
RESPONSIBLE
Building Division
ivision
Services DivisionServices DivisionServices DivisionServices DivisionServices Division
DEPARTMENT
Public Works Public Works Public Works Public Works Public Works Public Works
pment Development Development Development Development Development
Planning and
Department,Department,Department,Department,Department,Department,
040
Services D
Develo
-
20
20
PC
Reciprocal Easement Agreement for the benefit of all parcels for access, ingress and egress, utility, and drainage purposes. The agreement shall be requirements established in the Water
Quality Management Plan (WQMP) The developer shall comply with all applicable requirements of the Anaheim The developer shall pay all applicable development impact fees required retaining
walls, erosion control, slope easements and other pertinent e
lieu payment based on the project engineer’s cost estimate, in an amount determined by the City Engineer to be sufficient to pay for future The legal property owner shall submit to the
City for review and approval a recorded prior to the approval of the Final Map. The Final Map shall The developer shall execute a maintenance covenant with the City of Anaheim in a
form that is approved by the City Engineer and the City attorney for the private improvements including but not limited to private utilities, private drive, drainage devices, parkway
landscaping and irrigation, action system etc. in addition to maintenance as applicable to the project. The covenant shall be recorded concurrently with The new lots shall be assigned
a new street address by the Building submit a final grading plan showing building footprints, finished floor and pad elevations, finished grades, drainage routes,
street widening along Cerritos Avenue, shall be paid to the City of Anaheim.
information in accordance with Anaheim Municipal Code and th
reference the recordation information of this agreement.
AL
CONDITIONS OF APPROV
-
9
PRIOR TO ISSUANCE OF GRADING PERMITS
-
California Building Code, latest edition.
Municipal Code.
paseos, private lights, gas extr
under the Anaheim
Municipal Code.
the Final Map.
Prepare and
-
Division.
in
-
cash
A
NO.
78910111213
RESPONSIBLE
Services DivisionServices Division
DEPARTMENT
Public Works Public Works
Development velopment
Department,Department,
040
-
20
20
De
PC
The final Water Quality Management Plan (WQMP) shall be submitted Development/ Significant Redevelopment projects, identify potential tenance and use of the proposed project that could
affect the quality of the stormwater Treatment Control (if applicable) best management practices (BMPs) to development storm contained within an approved drainage device and preserve
the existing flows and manner drainage is conveyed downstream. Any inlets in sump condition shall be
for review and approval to Public Works Development Services Division and comply with the most current requirements of the Orange County be consistent with the requirements of Section
7 and Exhibit 7.II of the Orange County Drainage Area Management Plan (DAMP) for New runoff from the project site; define Source Control, Site Design, and charge of pollutants into
the surface water term Prepare and submit a final drainage study, including supporting Q10, Q25, and Q100 hydraulic and hydrological data to the City of Anaheim for off shall be blocked
during and after struction. The Final Drainage off for each watershed and that the proposed structures and basement(s), if any, shall be flood protected. Finish year, 24 hour event
water surface elevation. The Study shall be based upon and reference the rology Manual and the applicable City of Anaheim Master Plan of Drainage for the project area. All drainage
area boundaries per the Master Plan for Drainage shall be maintained. off shall not be diverted and any proposed improvements shall downstream properties from becoming flooded. The
Final site improvements and potential impacts to the existing drainage system. Also, designed to capture Q25 and a secondary emergency outlet for the sump ft. freeboard between the
maximum water surface elevation and minimum finish floor elevation. The emergency outlet must direct overflows to either an adequate
-
off shall be less than or equal to the overall site existing pre
Drainage Area Management Plan (DAMP). The WQMP shall
-
-
Drainage report shall address the drainage velocity on the new on
runoff; and provide a monitoring program to address the long
implementation of and compliance with the defined BMPs.
going main
the plans shall show that all concentrated flow shall be
-
AL
-
Report shall demonstrate that the overall site post
ft. minimum above the 100
CONDITIONS OF APPROV
downstream street or natural conveyance system.
-
rovide a minimum of 1
-
-
term on
10
grading operations or perimeter wall con
-
latest edition of the Orange County Hyd
-
-
sources of pollutants during the long
review and approval. No offsite run
-
control or eliminate the dis
development storm event run
-
floor elevations shall be 1
condition is required to p
-
event run
prevent
building
-
-
Run
sub
NO.
1415
Water Engineering
Divisionces Division
Services DivisionServices DivisionServices DivisionServices DivisionServices Division
Public Works Public Works Public Works Public Works Public Works Public Works Public Works
Development Development Development Development Development Development Development
Public Utilities
Department,Department,Department,Department,Department,Department,Department,
040
-
Services
20
Servi
20
PC
Development Services Division for review and approval. The report shall General Permit for Stormwater Discharges associated with Construction notification of the issuance of a Waste
Discharge Identification (WDID) demolished. The developer shall obtain a demolition permit from the way construction permit, and post a security (Performance and Labor & Materials Bonds)
in an amount approved by the City Engineer and in a Attorney for all the work that will be performed within the City street right of way of Cerritos Avenue during construction Engineer.
The offsite improvement plans shall include all traffic related improvements adjacent to the project site including all driveways, utility
Submit a Preliminary Geotechnical Report to the Public Works All required plans and studies shall be prepared by a Registered The property owner shall obtain the required coverage under
California’s Activity by providing a copy of the Notice of Intent (NOI) submitted to nd a copy of the subsequent The property owner shall have prepared a Stormwater Pollution SWPPP
shall be kept at the project site and be available for Public Works Development Services Division review be That the developer/owner shall submit a set of improvement plans for Public
Utilities Water Engineering review and approval in determining the 146 pursuant to the Subdivision Map Act and in accordance with City Code. Provide a conformance copy of the The developer
shall submit offsite improvement plans, obtain a right of of the project. Improvements shall conform to City of Anaheim Public installations, signing and striping, and all other offsite
work, if any. If there
Works requirements, City Standards, and as approved by the City
All existing structures in conflict with the future property lines shall
conditions necessary for providing water service to the project.
address any proposed infiltration features of the WQMP.
Building Division prior to any demolition work.
-
11
the State Water Resources Control Board a
ISSUANCE OF BUILDING PERMITS
recorded map to the City Engineer's office.
-
Prevention Plan (SWPPP). The
-
Record Parcel Map No. 2017
form approved by the City
Professional Engineer.
upon request.
number.
PRIOR TO
1617181920212223
Water EngineeringWater Engineering
Services DivisionServices DivisionServices DivisionServices DivisionServices Division
Public Utilities Public Utilities
Public Works Public Works Public Works Public Works Public Works
Development Development Development Development Development
Department,Department,Department,Department,Department,
040
-
20
20
PC
centerline/median. Limits to be determined by the City Engineer and necessary for the widening to its ultimate location, shall be paid to the City Provide a Pad Certification from a
Registered Civil Engineer, certifying that the finished grading has been completed in accordance with the City All Landscape plans shall comply with the City of Anaheim adopted use
is necessary or abandoned if the existing service is no longer needed. The owner/developer shall be responsible for the costs to upgrade or to
utility cuts, then the entire street shall be resurfaced via 2” grind and cap from edge of gutter to edge of gutter or to lieu payment based on the project engineer’s cost estimate,
in an amount determined by the City Engineer to be sufficient to pay for future street widening along Cerritos Avenue, including but not limited to, ty relocations, concrete driveway,
street trees, landscape irrigation, relocation of utility poles, required offsite BMPs, etc. Way Construction Permit shall be obtained from the Landscape Water Efficiency Guidelines.
This ordinance is in compliance with the State of California Model Water Efficient Landscape Ordinance The developer shall pay all applicable development impact fees required lines,
as well as any modifications, relocations, or abandonments of existing water services, backflow equipment, and fire lines, shall be coordinated and permitted through Water Engineering
Division of the Anaheim Public That all existing water services and fire services shall conform to current Water Services Standards Specifications. Any water service and/or fire d
-
Development Services Division for all work performed in the public right
line that does not meet current standards shall be upgraded if continue
That all requests for new water services, backflow equipment, or fire
-
12
-
abandon any water service or fire line.
under the Anaheim Municipal Code.
Public Works Inspector.
curb and gutter, utili
approved grading plan.
will be multiple street
Utilities Department.
of Anaheim.A Right of
(AV1881).
-
in
way.
-
A cash
-
of
24252627282930
Building Department,Building Department,
Planning Services
Code Enforcement
Water Engineering
Public Utilities, Public Utilities, Public Utilities,
Services DivisionServices DivisionServices DivisionServices Division
Public Utilities
Public Works Public Works Public Works Public Works
t Development Development Development
Planning and Planning and
nt,
Department,Department,Department,
EngineeringEngineeringEngineering
Electrical Electrical Electrical Developmen
Division
040
Departme
-
20
20
PC
owner/developer shall coordinate with Electrical Engineering to establish the City of Anaheim a Public Utilities easement with dimensions as shown between site Water Quality Management
Plan, sewer, storm drain, and public right of way improvements shall be completed, operational, and Set all Monuments in accordance with the final map and submit all monuments damaged
as a result of construction shall be reset to the All public improvements shall be constructed by the developer, inspected
and/or fire line connections will be required for each parcel or residential, commercial, industrial unit per Rule 18 of Prior to approval of permits for improvement plans, the property
electrical service requirements and submit electric system plans, electrical ans, and related technical drawings Prior to connection of electrical service, the legal owner shall provide
to Prior to connection of electrical service, the legal owner shall submit construction activities should be limited to the hours between 7:00 a.m. property line All remaining fees/deposits
required by Public Works department must be centerline ties (if required) to the Public Works Department. Any and accepted by Construction Services prior to final building and zoning
are subject to review and approval by the Construction Services Inspector.
planter
payment to the City of Anaheim for service connection fees.
the City of Anaheim’s Water Rates, Rules and Regulations.
and 7:00 p.m. in compliance with AMC Section 6.70.0110.
foot wide
and eastern
PRIOR TO FINAL BUILDING AND ZONING INSPECTIONS
-
two
-
13
easement
andscaping shall be provided within the
-
panel drawings, site plans, elevation pl
approved utility service plan.
driveway
satisfaction of the City Engineer.
That individual water service
common access
and specifications.
-
All required on
paid in full.
wall/fence.
inspection.
on the
All
the
L
31323334353637383940
Building Department,
Public Works Dept.
Public Works Dept. Public Works Dept.
Planning Services
Traffic EngineeringTraffic EngineeringTraffic Engineering
Water Engineering
Water EngineeringWater EngineeringWater Engineering
Services Division
Public Utilities Public Utilities Public Utilities
Public Works
Development
Public Utilities
Planning and
Department,
Division
040
-
20
20
PC
That curbs adjacent to the drive aisles shall be painted red to prohibit parallel parking in the drive aisles. Red curb locations shall be clearly roads as the site design does not
allow any such gates to conform to City back Should gates be desired in the future, gates shall comply with the current No public water main or public water facilities shall be installed
in private inch and smaller shall be metered with a UL listed Conditions of approval related to each of the timing milestones above shall be prominently displayed on plans submitted
for permits. For example,
Builts shall be submitted for review and approval Only the parcel which fronts Cerritos Avenue is eligible to purchase parking permits for District All other parcels that do not front
Cerritos Avenue are not eligible to be installed across the project driveways or access uest access, and minimum width for ingress/egress as required by the Fire Department. version
of City of Anaheim Engineering Standard Detail 475 and are The following minimum horizontal clearances shall be maintained between proposed water facilities (water mains, laterals,
meters, fire outside wall) from feet minimum separation from all other utilities, including storm parking stalls or parking conditions of approval that are required to be complied with
prior to the ll be provided on plans submitted for
meter, Hersey Residential Fire Meter with Translator Register, no equals.
footings, and trees.
tail 475 pertaining to gate set
to the Department of Public Works, Development Services Division.
distance, turnaround area, guest phone, separate lane for g
-
to
Cerritos Avenue is within Permit Parking District 8.
-
(outside wall
feet minimum separation from structures,
No public water mains or laterals allowed under
feet minimum separation from curb face
-
14
City Engineer.
-
purchase parking permits for District 8.
sanitary sewer mains and laterals
of Anaheim Engineering Standard De
feet minimum separation
issuance of building permits sha
drains, gas, and electric
hydrants) and other facilities:
subject to approval by the
labeled on building plans.
-
Record Drawing and As
Vehicle gates shall not
alleys or paseo areas.
-
All fire services 2
-
10--
-
56
10
•••
lots.
8.
GENERAL
•
43
4142
444546474849
epartment,
Building Department,Building Department,Building Department,
Planning Services Planning Services Planning Services Services
Planning and Planning and Planning and Planning and
DivisionDivisionDivisionDivision
040
Planning
-
Building D
20
20
PC
building plan check. This requirement applies to grading permits, final maps, street improvement plans, water and electrical plans, landscape All new landscaping shall be installed
in conformance with Chapter 18.46 The Applicant shall defend, indemnify, and hold harmless the City and its aside, void, or annul the decision of the Indemnitees concerning this permit
indemnification is intended to include, but not be limited to, damages, fees s awarded against or incurred by Indemnitees and costs of suit, costs, liabilities and expenses incurred
by Indemnitees in connection with The property shall be developed substantially in accordance with plans and specifications submitted to the City of Anaheim by the applicant and
safety “Landscape and Screening” of the Anaheim Municipal Code and shall be maintained in perpetuity. Landscaping shall be replaced in a timely officials, officers, employees and agents
(collectively referred to ”) from any and all claims, brought against Indemnitees to attack, review, set determinations taken, done, or made prior to the decision, or to determine the
reasonableness, legality or The Applicant’s claim or litigation, including without limitation attorneys’ fees and other The applicant is responsible for paying all charges related to
the processing of this discretionary case application within 30 days of the issuance of the for this project, shall result in delays in the issuance of required permits or may result
in the revocation of the
ed, diseased and/or dead.
irrigation plans, security plans, parks and trail plans, and fire and life
final invoice or prior to the issuance of building permits
which plans are on file with the Planning Department.
validity of any condition attached thereto.
charges
Indemnitees
-
manner in the event that it is removed, damag
15
Failure to pay all
-
or any of the proceedings, acts or
collectively as “
approval of this application.
whichever occurs first.
actions or proceedings
individually and
such proceeding.
and/or cost
plans, etc.
50515253