Do not occU(:il£ this building until the final ins1.:iections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
heAn sinnArl·
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mee. & Fire)
Insulation (Sound/Energy)
Do not tape o.r plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
inn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
I Inn nnt h,,,-1,fill unlAsS c,;nnon nff\
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lie. (714) 765-5194 {Allow 10 business days)
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
' /
Mechanical Inspections
Plumbing Inspections
Electrical Inspections