Loading...
87-351RESOLUTION NO. 87R-351 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM FINALLY ACCEPTING THE COMPLETION OF A CERTAIN PUBLIC WORK. (HARBOR BOULEVARD, BROADWAY, CLEMENTINE AND CHESTNUT STREET) WHEREAS, the City Council of the City of Anaheim did cause to be published in the Anaheim Bulletin on the Publication Dates set forth in Exhibit A, a notice which: invited sealed proposals for the public work (Project) as described in Exhibit A in accordance with the designs, plans, profiles and specifications prepared by the Public Works Department; declared that said proposals would be received up until 2:00 o'clock P.M. on the Bid Opening Date set forth in Exhibit A; stated that, pursuant to the provisions of Section 1770 of the Labor Code, the City Council of the City of Anaheim had ascertained the prevailing rate of wages for each type of labor needed to execute said Project; and stated that the prevailing hourly wage scale so ascertained was on file in the Office of the City Clerk; and WHEREAS, on the Bid Opening Date at the hour of 2:00 o'clock P.M., the City Clerk and the City Engineer of the City of Anaheim did open said sealed proposals received up to that time for the furnishing of all plant, labor, services, materials and equipment, and all utilities and transportation, including power, fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, the Project hereinabove more particularly described and set forth, in public, in the City Council Chamber in the City Hall, Anaheim, California, and the City Engineer did tabulate the result of said sealed proposals and did make a report to the City Council at a meeting held no later than thirty (30) days after the bids were opened; and WHEREAS, the City Council of the City of Anaheim did consider the sealed proposals submitted for furnishing the materials and performing the work hereinabove more particularly described and set forth, and did thereupon find and determine that the sealed proposal submitted by the Lowest and Best Responsible Bidder set forth in Exhibit A for the construction, installation and completion of said Project hereinabove mentioned and described, was the lowest and best responsible proposal submitted therefor, and thereupon accepted said bid and did award a contract to said contractor for furnishing all plant, labor, services, materials and equipment and all utilities and transportation, including power, fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings, the said Project as specified in said notice inviting sealed proposals, and did authorize the Mayor and the City Clerk of the City of Anaheim to execute a contract for and on behalf of the City of Anaheim with said contractor; and WHEREAS, the said contractor has furnished all plant, labor, services, materials and equipment and all utilities and transportation, and performed all work necessary for the construction and completion, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings of said ProJect as specified in the notice inviting sealed proposals and in the detailed designs, plans, drawings and specifications prepared by the Public Works Department, and the contract made and entered into with said contractor by the City of Anaheim; and WHEREAS, the City Engineer has duly certified to the construction and completion of said Project hereinabove mentioned and described, in accordance with the plans arid specifications and the contract documents duly made and entered into with said contractor; and WttEREAS, tile City Council finds that said contractor has completed said Project hereinabove more particularly described in accordance with the provisions of the contract and the contract documents, and that notice of completion should be filed and payment of the balance due said contractor authorized in accordance with the contract documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that all plant, labor, services, materials and equipment and all utilities and transportation, and the performance of all work necessary to construct, install and complete in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, together with the appurtenances thereto, said Project hereinabove more particularly described and set forth, in the City of Anaheim, by said contractor, be, and the same are hereby, accepted subject, nevertheless, to ali the terms, conditions and provisions of the contract documents, and that the balance due said contractor for said work be paid to said contractor thirty-five (55) days from and after final acceptance of said work as evidenced by the adoption of this resolution, but not sooner than thirty (50) days after the date of the filing of notice of completion, excepting only such sum or sums as may lawfully be withheld in accordance with the provisions of said contract and contract documents. That acceptance by the contractor of said payments made in accordance with said final estimate shall operate and shall be a release to the City of Anaheim, its officers, agents and employees from all claims and liabilities due the contractor for anything done or furnished or withheld or for anything relating to the work or any act or neglect of the City, its officers, agents and employees, excepting only claims against the City for amounts withheld by the City at the time of such payment. BE IT FORTHER RESOLVED that the Mayor be, and he is hereby, authorized to execute completion of said work as required by la~. -2- BE I2 FURTHER RESOLVED that the City Clerk be, and she is hereby', directed to cause said Notice of Completion to be recorded in the Office of the County Recorder within ten (10) days of the date of this Resolution. THE FOREGOING RESOLO~'ION is approved and adopted by the City Council of the City of Anaheim this 18th day of August, 1987. MAYOR OF THE ANAHEIM ATTEST: /jb 6406M 080487 CLERK STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ANAHEIM ) I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 87R-351 was introduced and adopted at a regular meeting provided 'by law, of the City Council of the City of Anaheim held on the 18th day of August, 1987, by the following vote of the members thereof: AYES: COUNCIL MEMBERS: Hunter, Pickler, Kaywood and Bay NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Ehrle AND I FURTHER certify that the Mayor of the City of Anaheim signed said Resolution No. 87R-351 on the 18th day of August, 1987. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 18th day of August, 1987. CITY CLERK OF THE CITY OF ANAHEIM (SEAL) i, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original of Resolution No. 87R-351 duly passed and adopted by the Anaheim City Council on August 18, 1987. CITY CLFA(K OF' T~-E CITY OF ANAHEIM EXHIBIT A PROJECT: Harbor Boulevard, Broadway, Clementine Street and Chestnut Street, street, storm drain, sewer, water, street light, traffic signal, electrical and landscape improvements in the City of Anaheim consisting of clearing and grubbing; excavation; construction of base material; construction of asphalt concrete; construction of P.C.C. pavement, curb, gutter, sidewalk, driveway, crosswalk, colored crosswalk, and planter wall; interlocking concrete pavers; adjustment of manholes, water valve covers, and vaults to grade; installation of survey monuments; installation of tree well grates; installation of lighted and unlighted concrete bollards; sheeting shoring and/or bracing; construction of R.C.P. storm drain facility and catch basins; construction of water improvements; plug and or capping of existing water mains; abandonment of valves; removal of existing meter boxes and fire hydrants; construction of landscaping and irrigation improvements; construction of pattern concrete; construction of underground electrical facilities; construction of street lighting facilities; relocation of traffic signal; construction of redwood header; pavement reinforcing fabric and ali appurtenant work as shown on the plans and delineated in the specifications on file in the office of the City Engineer. Account No. 46-792-6525-E2250. LOWEST AND BEST RESPONSIBLE BIDDER: SILVERI & LE BOUEF, JV 1404C So. Ritchey Street Santa Ana, California 92705 PUBLICATION DATES: March 18 and April 4, 1986 BID OPENING DATE: April 17, 1986 PREVAILING WAGE RATE RESOLUTION NO: 86R-47 AWARD DATE: May 6, 1986 AWARD RESOLUTION NO: 86R-176 CONTRACT PRICE: CONTRACT COMPLETION DAYS: ONE MILLION EIGHT HUNDRED SIXTY-ONE THOUSAND EIGHT AND 52/100 DOLLARS ($1,861,008.52) One Hundred Twenty (120) LIQUIDATED DAMAGES: $1,500.00 per calendar day