Loading...
Resolution-PC 2001-161~ RESOLUTION NO. PC2001-161 • A RESOLUTION OF THE ANAHEIM CITY PLANNING COMMISSION RECOMMENDING ADOPTION OF AMENDMENT NO. 5 TO THE DISNEYLAND RESORT SPECIFIC PLAN NO. 92-1 (INCLUDING AMENDMENTS TO THE LAND USE PLAN, DESIGN PLAN, ZONING AND DEVELOPMENT STANDARDS, AND CONDITIONS OF APPROVAL) WHEREAS, on April 29, 1986, City Council of the City of Anaheim adopted Ordinance No. 4709 to establish uniform procedures for the adoption and implementation of Specific Plans for the coordination of future development within the City, and "Zoning and Development Standards" when the Specific Plan includes zoning regulations and development standards to be substituted for existing zoning under the Zoning Code, which "Zoning and Development Standards" shall be adopted by ordinance independent of the rest of the Specific Plan; and WHEREAS, pursuant to the procedures set forth in Chapter 18.93 of the Anaheim Municipal Code, on June 29, 1993, the City Council of the City of Anaheim adopted Ordinance No. 5377 amending the zoning map to reclassify certain real property described therein into The Disneyland Resort Specific Plan No. 92-1 Zone subject to certain conditions as specified therein, and Ordinance No. 5378 relating to tF~e establishment of Zoning and Development Standards for The Disneyland Resort Specific Plan No. 92-1 by the addition of Chapter 18.78 to said Code; and WHEREAS, on April 42, 1-994, ~he City Co~ncil adop~ed Ordi~ance No. 5420 a~ending Ordinances Nos. 5377 and 5378 relating to The Disneyland Resort Specific Plan No. 92-1, Amendment No. 1, which amendment established "District A," redesignated a portion (approximately 9 acres) of the Eas# P~rk~ng Area to District A; and established "Zoning and Development Standards" for District A; and WHEREAS, on June 20, 1995, the City Council adopted Ordinance No. 5503 amending Ordinance Nos. 5377 and 5378, as previously amended, relating to The Disneyland Resort Specific Plan No. 92-1, Amendment No. 2, which amendment redesignated a portion (approximately 10 acres) of the East Parking Area to District A; and WHEREAS, on October 22, 1996, the City Council adopted Ordinance No. 5580 amending Ordinance Nos. 5377 and 5378, as previously amended, relating to The Disneyland Resort Specific Plan No. 92-1, Amendment No. 3, which amendment encompassed modifications to The Disneyland Resort Project including a Revised Phasing Plan and modifications to the Specific Plan Guidelines and Public Facilities Plan to implement the Revised Phasing Plan; and incorporation of text and graphic modifications to the document; and WHEREAS, on July 13, 1999, the City Council adopted Ordinance No. 5689 amending Ordinance Nos. 5377 and 5378, as previously amended, relating to The Disneyland Resort Specific Plan No. 92-1, Amendment No. 4, which amendment pertained to the Pointe Anaheim Lifestyle Retail and Entertainment Complex (the "Pointe Anaheim ProjecY') on approximately 29.1 acres; and which amendment established "Zoning and Development Standards" for the Pointe Anaheim Overlay, modified the Land Use Plan, the Public Facilities Plan, the Design Plan and the Conditions of Approval, and incorporated text and graphic modifications to implement the Pointe Anaheim Project, and redesignated a portion of District A(18.9 acres) and Parking District (East Parking Area)/C-R Overlay (10.2 acres) to the Pointe Anaheim Overlay; and Tracking No. SPN2001-00092 CR5243PK.doc -1- PC2001-161 • • WHEREAS, pursuant to Chapter 18.93 of the Anaheim Municipal Code, Robert H. Shelton, Anaheim Center for Entertainment, LLC, as authorized agent for Excel Pointe Anaheim, LLC, submitted a request dated March 12, 2001, that the Planning Commission initiate General Plan Amendment No. 2001-00393, Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1, Amendment to Conditional Use Permit No. 4078 and other related actions pertaining to the Pointe Anaheim project, as proposed to be modified including development in up to five phase, on property within the Specific Plan not owned by Excel Pointe Anaheim, LLC; and WHEREAS, the Planning Commission, by its Resolution No. PC2001-41, duly initiated General Plan Amendment No. 2001-00393, Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1, Amendment to Conditional Use Permit No. 4078 and other related actions at its regularly scheduled meeting on April 9, 2001; and WHEREAS, pursuant to Chapter 18.93 of the Anaheim Municipal Code, Robert H. Shelton, Anaheim Center for Entertainment, LLC, as authorized agent for Excel Pointe Anaheim, LLC, submitted requests on October 29, 2001 for General Plan Amendment No. 2001-00393, Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1, Amendment to Conditional Use Permit No. 4078, a request for the City of Anaheim to enter into the First Amended and Restated Development Agreement No. 99-1 with Excel Pointe Anaheim, LLC, and Amendment No. 3 to The Anaheim Resort Public Realm Landscape Program, which "Proposed Project Actions" address the Pointe Anaheim project as it is proposed to be modified, including development in up to five phases; and WHEREAS, the Pointe Anaheim Project area consists of approximately 29.1 acres located between Harbor Boulevard and Clementine Street, and Disney Way and Katella Avenue; having appFOxiFrtate ~rontages of 1,500 ~ee~ or+ ~he so~~h side o€ aisney Way b€~nreen Ha~bor-Boulevard and Clementine Street, 1,185 feet on the west side of Clementine Street between Disney Way and Katella Avenue (excluding Fire Station No. 3 at 1713-1717 South Clementine Street), 728 feet on the north side of Katella Avenue befinreen Clementine Street and a point 771 feet west of the centerline of Clementine Street, and 585 feet on the east side of Harbor Boulevard between Disney Way and a point 615 feet south of the centerline of Disney Way; and that the project area includes buildings at the following addresses: 400 West Disney Way, 1737 South Clementine Street, 1755 South Clementine Street, 1700 South Harbor Boulevard, 301 West Katella Avenue, and 401-409 West Katella Avenue; and WHEREAS, proposed Amendment No. 5 to The Disneyland Resort Specific Plan No. 92- 1 encompasses text and exhibit changes throughout the Specific Plan document to reflect the Pointe Anaheim Project, as proposed to be modified including development in up to five phases over time, including amendments to the Land Use Plan, Public Facilities Plan, Design Plan, Zoning and Development Standards, and Conditions of Approval; and WHEREAS, the Pointe Anaheim Project, as proposed to be modified, consists of 634,700 gross square feet of retail/dining/entertainment uses, which includes a 94,000 square foot aquarium; up to four hotels comprising a maximum of 1,662 hotel rooms/suites (of which up to 200 units may be Vacation Ownership Resort units) with approximately 322,071 gross square feet of related accessory uses of which up to 178,120 gross square feet on top of the parking structure may be used for a hotel conference center (the hotel rooms/suites and accessory uses would encompass a maximum of 1,370,714 gross square feet); and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces (the minimum number of striped parking spaces would be 3,752) and 15 bus spaces with a 10,200 square foot bus terminaf/facility for airport transport and to/from sightseeing venues; and that the proposed development of Pointe Anaheim would take place in up to five phases over a period of time. WHEREAS, the City Planning Commission did hold a public hearing at the Anaheim Civic Center, Councif Chamber, 200 South Anaheim Boulevard, in the City of Anaheim on November 19, 2001, at 1:30 p.m., notice of said public hearing having been duly given as required by law and in accordance with the provisions of the Anaheim Municipal Code, Chapter 18.03, to hear and consider evidence for and against the Proposed Project Actions and to investigate and make findings and recommendations in connection therewith; and CR5243PK.doc -2- PC2001-161 • • WHEREAS, after due consideration, inspection, investigation and study made by itself and in its behalf, and after due consideration of the information provided in the Specific Plan document and other information and evidence received during the public hearing process, and after incorporating staff's corrections and certain other revisions made during the public hearing on November 19, 2001, the Planning Commission DOES HEREBY FIND: 1. That the Pointe Anaheim Overlay, which is the subject of Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1, is uniquely sited adjacent to a Resort SmartStreet (Katella Avenue), finro major arterial highways (Harbor Boulevard and Disney Way) and one secondary arterial highway (Clementine Street) in the Anaheim ResortTM' and encompasses ten parcels totaling 29.1 acres which would be enhanced by the consolidation of the parcels to develop the Pointe Anaheim project in accordance with the land use and site development standards of the Pointe Anaheim Overlay, as proposed to be amended. 2. That as demonstrated in the General Plan Consistency submitted by the petitioner and described in Attachment B to the Staff Report to the Planning Commission dated November 19, 2001 (Amendment No. 5 to The Disneyland Resort Specific Plan," Section 6.0 "General Plan Consistency), Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1 is consistent with the goals and policies of the General Plan, as proposed for amendment pursuant to General Plan Amendment No. 2001-00393, and with the purposes, standards and land use guidelines therein. 3. That Amendment No. 5 to The Disneyland Resort Specific Pfan No. 92-1 results in development of desirable character inasmuch as the Pointe Anaheim Overlay, as proposed to be amended, provides for the same types of land uses currently permitted or conditionally permitted by The DisFleyland Fteso~t SpeEi~E Plan No. 92-'~ foK tk~e project site; that-th~ Pointe Anaheim- project includes the consolidation of several smaller parcels which is encouraged by the Specific Pfan; that the Pointe Anaheim project will provide another venue for visitors to the area, which could result in longer stays for visitors to the Anaheim ResortTM'; and that the Pointe Anaheim project will provide for the development of up to 634,700 gross square feet of retail/dining/entertainment uses, up to four hotels with 1,662 hotel roomslsuites (of which up to 200 units may be vacation ownership resort units) with approximately 322,071 gross square feet of related accessory uses (of which up to 178,120 gross square feet on top of the parking structure may be used for a hotel conference center), with the hotel rooms/suites and accessory uses encompassing a maximum of 1,370,711 gross square feet; and with parking facilities for up to 4,800 vehicles, which will be compatible with existing, approved and proposed visitor-serving uses in the surrounding Anaheim ResortTM' area. 4. That Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1 respects the environmental and aesthetic resources consistent with economic realities by providing for visual enhancement of the Pointe Anaheim Overlay and the Anaheim ResortT"" with the implementation of the Pointe Anaheim project and by fulfilling the goals and objectives of The Disneyland Resort Specific Plan by efficiently utilizing the project site to develop an integrated Lifestyle Retail and Entertainment Complex which will provide another venue for area visitors. The Addendum to the Pointe Anaheim Initial Study and Mitigated Negative Declaration and Modified Mitigation Monitoring Plan No. 004 also address project- related environmental impacts and provide for the feasible mitigation of said impacts. 5. That, in conjunction with the initial adoption of The Disneyland Resort Specific Pian on June 19, 1993, City Council adopted Resolution No. 93R-146 which included a detailed description of the Specific Plan's consistency with each of the above-noted findings; and that staff has reviewed and determined that Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1 is consistent with the above-noted findings. WHEREAS, Amendment No. 5 to the Disneyland Resort Specific Plan text and exhibits, incorporating the changes recommended for approval by the Planning Commission, are identified in Attachment A to this Resolution and incorporated herein; and CR5243PK.doc -3- PC2001-161 • • WHEREAS, the Pianning Commission has reviewed the proposal to amend The Disneyland Resort Specific Plan No. 92-1 and by its Resolution No. PC2001-159 has found and recommends that the Anaheim City Council determine that the Addendum to the Pointe Anaheim Initial Study and Mitigated Negative Declaration dated October 29, 2001, and the Modified Mitigated Monitoring Plan No. 004 are adequate to serve as the required environmental documentation for the proposed amendment; and further finding on the basis of the Addendum and the evidence presented that there is no substantial evidence that, with the imposition of the mitigation measures identified in Modified Mitigation Monitoring Plan No. 004, that the amendment will have a significant effect on the environment. NOW, THEREFORE, BE IT RESOLVED, that pursuant to the above findings, the Anaheim City Planning Commission does hereby recommend that the City Council, by ordinance, adopt Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1 (including the Land Use Plan, Design Plan, Zoning and Development Standards, and Conditions of Approval); and that the Specific Plan text and exhibits are identified in Attachment A to this Resolution and incorporated herein; and BE IT FURTHER RESOLVED that the Anaheim City Planning Commission does hereby find and determine that adoption of this Resolution is expressly predicated upon applicant's compliance with each and all of the conditions of approval set forth in Attachment A and incorporated herein. Should any such condition, or any part thereof, be declared invalid or unenforceable by the final judgment of any court of competent jurisdiction, then this Resolution, and any approvals herein contained, shall be deemed null and void. THE FOREGOING RESOLUTION was adopted at the Planning Commission meeting of November 19, 2001. _ _ ~ne-~c~ CHAIRP~F~SON, ANAHEIW~CJITY PLANNING COMMISSION ATf EST: ~~~-a~~ SECRETARY, ANAHEIM CITY PLANNING COMMISSION STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ANAHEIM ) I, Eleanor Fernandes, Secretary of the Anaheim City Planning Commission, do hereby certify that the foregoing resolution was passed and adopted at a meeting of the Anaheim City Planning Commission held on November 19, 2001, by the following vote of the members thereof: AYES: COMMISSIONERS: ARNOLD, BOSTWICK, BOYDSTUN, BRISTOL, EASTMAN, KOOS, VANDERBILT NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE IN WITNESS WHEREOF, I have hereunto set my hand this ~ ~ T~ day of , 2002. ~ ~ SECRETARY, ANAHEIM CITY PLANNING COMMISSION CR5243PK.doc -4- PC2001-161 PC2001 -16 Note: To illustrate the amendments to The Disneyland Resort Specific Plan (SP 92 -1) to reflect the Pointe Anaheim project, as it is proposed to be modified, the text proposed to be deleted is sh-ack and the added text is handwritten or labeled "Insert." The Disneyland Resort Specific Plan (SP92 -1) City of Anaheim Adopted June 29. 1993 Amended April 12, 1994 Amended June 20, 1995 Amended October 22, 1996 Adjustment September 16, 1997 Amended July 13, 1999 Prepared for: THE CITY OF ANAHEIM Civic Center P.O. Box 3222 Anaheim, California 92803 Contact: Tom Wood (714) 765 -5254 WALT DISNEY IMAGINEERING 500 South Buena Vista Burbank, California 91521-6400 Contact: John Graves (714) 781 -0231 Prepared by: THE SWA GROUP 580 Broadway, Suite 200 Laguna Beach, California 92651 Contact: Bob Jacob (949) 497 -5471 The Disneyland Resort Specific Plan V Section 1.0 Executive Summary 1.1 Purpose of the The purpose of The Disneyland Resort Specific Plan Is to Specific Plan provide for the development of an international multi -day vacation destination resort on 489.7 acres in the City of Anaheim's Anaheim Resort. The overall goal is to change the existing Disneyland theme park area From a day- orient- ed attraction to a multi -day destination resort by integrat- ing the Specific Plan's existing and proposed theme parks, hotels, and visitor- serving facilities into an exciting, appeal- ing. unified resort environment. To achieve this, the Plan contains a land use plan, a public facilities plan, a design plan, and zoning and development standards which de- scribe how the Plan's goal will be realized. It creates five new planning districts —a Theme Park District, a Hotel District. a Parking District, a Future Expansion District and District A —and a C -R Overlay and a Pointe`Anaheim Overlay which provide the regulations and guidelines to assure that the planning area will become the high quality destination re- sort envisioned. The Plan will permit development of a new theme park, additional hotels and entertainment areas, new parking facilities, and an internal transportation sys- tem. The Pointe•Anaheim Overlay also provides for the de- velopment of a Lifestyle Retail and Entertainment Complex �"',l subject to the approval of Conditional Use Permit No. 407f. W40A w In addition, the Plan permits the existing Disneyland theme park to continue to be modified with new attractions and other improvements. 1.2 Organization of the The Specific Plan is divided into ten sections. Section 1.0, Specific Plan the Executive Summary. is a brief overview of the proposed Document plan. Section 2.0, the Planning Context, discusses the pur- pose of the Specific Plan. the City planning policies that af- fect development of the Specific Plan area. the authority and scope of the Specific Plan. and its relationship to other City planning documents. Section 3.0 contains the Land Use Plan and describes existing land uses and conditions within the Specific Plan area, and describes each of the proposed Land Use Districts. Section 4.0 contains the Public Facili- ties Plan. In Section 5.0, the Design Plan establishes the de- sign criteria for the Specific Plan area. Section 6.0, General Plan Consistency, describes how the Specific Plan is consis- tent with the City's adopted General Plan. Section 7.0 con- tains the detailed Zoning and Development Standards that will control development within the Specific Plan area. Sec- tion 8.0 compares the development standards contained in Page 1 -1 The Disneyland Resort Specific Plan *++* Section 1.0: Executive Summary • To enhance The Disneyland Resort Specific Plan area by providing a wider range of attractions, hotel accommoda- tions, restaurants, shopping opportunities, and public parking; • To develop public /private cooperation and partnership which utilizes the private sector to fund vitally needed im- provements to benefit the public; • To accommodate existing and anticipated traffic through implementation of an innovative transportation and park- ing plan, including convenient access to parking facilities from freeways, use of conveyance systems to shuttle visitors from parking facilities and hotels to area attractions, and provision of pedestrian walkways throughout The Disney- land Resort: • To lay a foundation for future economic expansion; and, • To minimize environmental impacts through comprehen- sive site development guidelines. 1.6 Summary of Districts The Disneyland Resort Specific Plan establishes five land use districts: the Theme Park District, the Hotel District, the Parking District, the Future Expansion District and Dis- trict A. In addition, the Specific Plan establishes a C -R Overlay, which allows certain parcels to become part of the overall Resort development or to be developed with the uses set forth in Chapter 18.48 (Anaheim Resort Specific Plan No. 92 -2) of the Anaheim Municipal Code as it currently ex- ists or may be amended in the future. The Specific Plan ad- ditionally establishes the Pointe'Anaheim Overlay which encompasses District A and the portion of the Parking bis- trict (East Parking Area) /C -R Overlay south of Freedman Way (renamed Disney Way) and provides for the develop- ment of the Pointe'Anaheim Lifestyle Retail and Entertain- ment complex subject to the approval of Conditional Use Permit No. 407 Exhibit 1.6.6b shows the District bound- aries. A91� n lied. The five land use Districts will be linked together by a net- work of pedestrian promenades and plazas, as well as a park -like area that serves as a transition between the theme parks and resort hotels. The Plan,provides for extensive transportation system improvements, including improved access to and from Interstate 5, and new peripheral public parking facilities. Once visitors have left their cars, a trans- portation system and a network of pedestrian walkways will Page 1 -4 The Disneyland Resort Specific Plan V* Section 1.0: Executive Summary style Retail and Entertainment Complex subject to the ap proval of Conditional Use Permit No. 4078 The 4111eAdtoa Insert . � Poiint � e *Anaheim project includes the following •��65-,0~ A �A- ELitCC-11Qt219 - L _ Y L Po inte*Anaheim project will be an inte- grated Page 1 -8 1.6.5 C -R Overlay The C -R Overlay is a special provision of the Specific Plan that allows certain parcels the ability to be developed with the uses permitted by the base District or to be developed with the uses permitted or conditionally permitted by the Anaheim Resort Specific Plan No. 92 -2, Zoning and Devel- opment Standards (Chapter 18.48 of the Anaheim Munici- pal Code). Additional description of the C -R Overlay is located in Section 3.3.5, 'C -R Overlay.' 1.6.5.5. Pointe*Anaheim Overlay C -R overlay The Pointe *Anaheim Overlay encompasses District A and the portion of the Parking District (East Parking Area) /C -R Overlay south of Disney Way (approximately 29.1 acres). This Overlay is a special provision of the Specific Plan that provides for the development of the Pointe *Anaheim Life- style Retail and Entertainment Complex subject to the ap proval of Conditional Use Permit No. 4078 The 4111eAdtoa Insert . � Poiint � e *Anaheim project includes the following •��65-,0~ A �A- ELitCC-11Qt219 - L _ Y L Po inte*Anaheim project will be an inte- grated Page 1 -8 Insert A (page 1 -8, 3 -23, 7 -30, 10 -7) (page 6 -41, 6 -42). 634,600 gross square feet of retail /dining /entertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot bus terminal /facility for airport transport and to /from sightseeing venues. Depending on the availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project and the number of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with Specific Plan Amendment No /5, an Addendum to the Initial Study /Mitigated Negative Declaration was prepared,in compliance with the requirements of CEQA. The Addendum demonstrated that tl 6 changes to the Mitigated Negative Declaration which were included in Amendment No. 5 would not result in any new or substantially worse environmental impacts and that no supplemental or subsequent environmental review was required. Insert C (page 3 -27) Up to 200 of the 1,662 hotel units. Up to an additional 15( the proposed project if the Resort units due to the larg Resort unit. 7 Insert D (page 3 -27) orriis may be developed as Vacation Ownership Resort ) j square feet of hotel gross square feet could be built in jeloper elects to develop all 200 Vacation Ownership square footage associated with a Vacation Ownership One of the hotels planned to incorporate a theater /night club area of approximately 17,000 gross sq are feet. This area has been incorporated into the total hotel square footage. / Up to 133 30 gross square feet of area on the top of the parking structure is planned for develop en as a hotel conference center. Associated with the hotel conference center is a 6 00 gross square foot outdoor terrace area, which will accommodate outdoor even Depending on availability of funding at the time of construction, the conference cen r may be reduced in size or eliminated from the project. The Disneyland Resort Specific Plan + �� Section 1 .0: Executive Summary 1.6.6 Development Plan The map and accompanying table on these pages is The Disneyland Resort Specific Plan Development Plan. It shows the location of each of the five Districts within the Specific Plan area and the Anaheim Resort. It is accompa- nied by a table that summarizes the proposed development. Development Area Summary Development Area Name Land Use Area Existing & lacteal Proposed Development Theme Park District • Existing Disneyland 136 2.600.000 sf (Development Area 1) • Planned Disneyland and Back- of-hou -e Uses 900.000 sf • Administration Building 9 475.000 sf • Mriumstration Building Parking 2.300 spaces • New Theme Park & Back- of-house Uses 147 3.350.000 sf (2 & 3) • Hotel Rooms (2) rooms • Parking for Hotels & Theme Park Uses (2) spaces • Theme Park Parking 5.000 spaces (4) Hotel District • Hotel Rooms (inc. 1.000 evsnng rooms) 97 5.600 rooms 12) (Development Area 2) •Retail /Restaurant 300.000 sf(l) • Parking Spaces (Inc. 570 existing spaces) 9.930 spaces (2 & 31 • Meeting Room /Convention Space 200.000 d(1) Parking District • East Parking Area 30.1 (5) 17.600 spaces (3 & 4) (Development Area 3) • west Parking Area 27 16.700 spaces (3) Future Expansion District • Theme Park 24.7 O sf (6) (Development Nita 4) • Parking Spaces 5.100 spaces t31 District A ' Commercial Recreation Uses 18.9 (7) rooms (Development Area 51 Combined total. existing and proposed 7.825.000 sf 5.600 rooms 489.7 51,630 spaces C -R Overlay (5) within Theme Park District 19.5 within Hotel District 0.5 within Parking Distrct East Parking Area 30.1 Whin Future Expansion District 1.1 Subtotal 51.2 Pointe Overlay (8) Whin Parking Distinct East Parking Area /C -R Overlay 10.2 within District A 18.9 Subtotal 29.1 Notes: (1) Includes existing and anticipated new development to service existing & new hotels (2) Up to 1.000 rooms with their accompanying parking may be constructed within the Theme Park District and up to 350.000 square feet of a retail entertainment center may be constructed in the Theme Park and /or Hotel District(-) (3) Number of spaces will be deterrNned by the provisions of Section 7.0. 'Zoning and Development Standards (4) Up to 5.000 of the guest parking spaces identified for the East Puking Area may be located In the Theme Park District (5) The C -R Overlay may be developed with hotel rooms or visitor- sewing uses and /or parking facilities: see Section 3.3.5'C -R Overay' ` (6) Zoning and Development Standards permit theme park uses In the Future Expansion District (7) Up to 75 hotel rooms per gross acre are pemutted in District A 181 The Polnte'Anahelm Overlay ay be developed with the Patnte•Anuheim project subject to the approval of Conditional Use Permit No. 407 or. with uses set forth in Distinct A or the Parking District (East Parking Area) /C- ROverla 464mc.rf eA Exhibit 7. 6,60 Disneyland Resort Development Area Summary Tabulation (refe +b F-xhiWt Page 1 -9 The Disneyland Resort Specific Plan * *,* Section 1.0: Executive Summary N Orangewood Avenue The Disneyland Resort Specific Plan Anaheim California Legend Pointe *Anaheim Overlay 0 1000 2000 Feet VJ North L _ =-I Anaheim Resort Boundary -j Disneyland Resort Speciric Plan Boundary Designated for Future Extension in Existing General Plan Circulation Element Pointe'Anaheim Overlay Exhibit 1.6.6d— Pointe Anaheim Overlay Page 1 -12 BaflRood � _; .......: \� . — r —1::: I _ �I .......... .. ............ .. :{ .......... ..............� ... .................{ west ..............� {. . . .Parking. . . . . . . . . . . . . . . . •Area { . . . . . . . . . . . . . . . . Existing : • I . . . . . . . . . . . . . . Disneyland { I \ .. Theme Park . { . Cerritos Avenue . ... . ... . . . ... . . . . . . . . . . . .. . . . . . O � . .. ° o L .............. ............ I 1 ......... ...................i 1 5 �1.......... .. m m {. ...................... i • . Hotel . . 1. . . . . . : I' = i East Parking \ • �:. y ... . District . . . . . . . . . .. Area . . . o i� ....... ..... ................: one.... > Way. i 1. . . . r Theme Pork. . ... . . . . rt _� . a.. . { m� l:::::: . : :::::...... c H: 1 . � . C cl l............ 3. ..:............. N 3 1 . . . .. : { v Katelto Avenue I Future Expansion L —.. District South Parking I { ...J Anaheim Convention (- l Center • I Pacifica Convention Way _ y I ' 3 L N Orangewood Avenue The Disneyland Resort Specific Plan Anaheim California Legend Pointe *Anaheim Overlay 0 1000 2000 Feet VJ North L _ =-I Anaheim Resort Boundary -j Disneyland Resort Speciric Plan Boundary Designated for Future Extension in Existing General Plan Circulation Element Pointe'Anaheim Overlay Exhibit 1.6.6d— Pointe Anaheim Overlay Page 1 -12 The Disneyland Resort Specific Plan V Section 2.0: Planning Context Plan's policies, design guidelines, regulations and develop- ment standards will apply. 2.4.3 CEQA Requirements An Environmental Impact Report (EIR) for the Specific Plan was prepared in compliance with the California Environ- mental Quality Act (CEQA). Pursuant to local and State CEQA Guidelines, the City of Anaheim prepared an Initial Study which determined that certain potentially significant environmental impacts might be associated with develop- ment under the Specific Plan. The City prepared EIR No. 311 (under separate cover) which identifies impacts which may result from the development of the project and includes recommended mitigation measures to lessen these impacts. As described in the EIR, further environmental review will be required before a theme park or associated uses in the Future Expansion District can be developed. The Final EIR for The Disneyland Resort project was certi- fied on June 22. 1993. No additional CEQA documentation was required for Specific Plan Amendments No. 1 and No. 2, since the changes proposed as part of those Amendments were within the scope of the project analyzed in the EIR. In conjunction with Specific Plan Amendment No. 3. an Ad- dendum to the EIR was prepared in compliance with the re- quirements of CEQA. The Addendum demonstrated that the changes to the Specific Plan which were included in Amendment No. 3 would not result in any new or substan- tially worse environmental impacts and that no supplemen- tal or subsequent environmental review was required. In conjunction with Specific Plan Amendment No. 4, a Mit- igated Negative Declaration was prepared in compliance with the requirements of CEQA. The Mitigated Negative Declaration demonstrated that the changes to the Specific Plan which were included in Amendment No. 4 would not result in any new or substantially worse environmental im- pacts and that, after incorporation of the recommended mitigation measures identified in Mitigation Monitoring Plan No. 004, potentially significant environmental impacts would be eliminated or reduced to a level considered less navel 8 than significant. Page 2 -7 Insert A (page 1 -8, 3 -23, 7-30,10-7) 634,600 gross square feet of retail /dining /entertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot bus terminal /facility for airport transport and to /from sightseeing venues. Depending on the availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project and the number of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with Specific Plan Amendment No. 5, an Addendum to the Initial Study /Mitigated Negative Declaration was prepared in compliance with the requirements of CEQA. The Addendum demonstrated that the changes to the Mitigated Negative Declaration which were included in Amendment No. 5 would not result in any new or substantially worse environmental impacts and that no supplemental or subsequent environmental review was required. Insert C (page 3 -27) Up to 200 of the 1,662 hotel rooms may be developed as Vacation Ownership Resort units. Up to an additional 150,000 square feet of hotel gross square feet could be built in the proposed project if the developer elects to develop all 200 Vacation Ownership Resort units due to the larger square footage associated with a Vacation Ownership Resort unit. Insert D (page 3 -27) One of the hotels is planned to incorporate a theater /night club area of approximately 17,000 gross square feet. This area has been incorporated into the total hotel square footage. Up to 133,630 gross square feet of area on the top of the parking structure is planned for development as a hotel conference center. Associated with the hotel conference center is a 62,500 gross square foot outdoor terrace area, which will accommodate outdoor events. Depending on availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project. t .. The Disneyland Resod Specific Plan V Section 3.0: Land Use Plan Development Area Summary Development Area Name Land Use Area (acres) Exlsting & Proposed Development rooms (2) Theme Park District • Existing Disneyland 136 2.600.000 sf (Development Area 1) • Planned Disneyland and Back -of -house Uses 900.000 sf spaces (2 & 3) • Administration Building 9 475.000 sf sf (11 • Administration Building Parking • East Puking Area 2.300 spaces spaces (3 & 4) • New Theme Park & Back -of -house Uses 147 3.350.000 sf (2 & 3) spaces (3) • Hotel Rooms 24.7 (2) rooms (Development Area 4) • Parking for Hotels & Theme Park Uses (2) spaces District A • Theme Park Parking 18.9 5.000 spaces (4) Hotel District • Hotel Rooms (inc. 1,000 existing rooms) 97 5.600 rooms (2) (Development Area 2) • Retail /Restaurant 300.000 sf (1) • Parking Spaces (inc. 570 existing spaces) 9.930 spaces (2 & 3) • Meeting Room /Convention Space 200.000 sf (11 Parking District • East Puking Area 30.1 (5) 17.600 spaces (3 & 4) (Development Area 3) • west Parking Area 27 16.700 spaces (3) Future Expansion District • Theme Park 24.7 0 sf (6) (Development Area 4) • Parking Spaces 5.100 spaces (3) District A • Commercial Recreation Uses 18.9 (7) rooms (Development Area 5) ^ Combined total. e:dsting and proposed 7,825.000 sf 5.600 rooms 489.7 51.630 spaces C -R Overlay (5) within Theme Park District 19.5 within Hotel District 0.5 within Parking District East Parking Area 30.1 within Future Expansion District 1.1 _ _Subtotal 5L2 _ Pointe-Anaheim Overlay (e) within Parking District East Parking Area /C -R Overlay 10.2 within District A 18.9 Subtotal 29.1 Notes: (1) Includes ctdsting and anticipated new development to service existing & new hotels (2) Up to 1.000 rooms with their accompanying parking may be constructed within the Theme Park District and up to 350.000 square feet of a retail entertainment center may be constructed in the Theme Park and /or Hotel District(s) (3) Number of spaces will be determined by the provisions of Section 7.0. - Zoning and Development Standards' (4) Up to 5.000 of the guest parkmg spaces Identified for the East Parking Area may be located in the Theme Park District (5) The C -R overlay may be developed with hotel rooms or visitor- serving uses and /or parking facilities: see Section 3.3.5'C -R Overlay' } (6) Zoning and Development Standards permit theme park uses In the Future Expansion District (7) Up to 75 hotel rooms per gross acre are permitted in District A (8) The Pomte•Anahehn Overlay y be developed with the Pofnte•Anaheirn Project subject to (tie approval of Conditional Use Permit No. 407 or, with uses set forth irl District A or the Puking District (East Parking Area) /C -R Overlay gyAmea ea- Exhibit 3.3o —Lt�nd Use Plan Development Summary Tabulation CYefe►' is Exhibito a4.4p6) Page 3 -7 The Disneyland Resort Specific Plan V Section 3.0 Land Use Plan The half of an acre with the C -R Overlay designation in the Hotel District will be permitted a density of up to 50 hotel rooms per gross acre, which is consistent with the density of the surrounding Hotel District use. The 30.1 acres in the East Parking Area are entirely within the C -R Overlay. A density of up to 75 hotel rooms per gross acre will be permitted by the C -R Overlay. The parking fa- cility will cover a portion of the District with the remaining acres to be developed under the C -R Overlay. In the Future Expansion District, the C -R Overlay permits a density of up to 75 units per gross acre. 3.3.6 Pointe *Anaheim Overlay The 29.1 -acre Pointe *Anaheim Overlay encompasses Dis- trict A (approximately 18.9 acres) and the portion of the Parking District (East Parking Area) /C -R Overlay south of Disney Way (approximately 10.2 acres) as shown in Exhibit 3.3.6a. This Overlay is a special provision of the Specific Plan that provides for the development of the Pointe *Ana - heim Lifestyle Retail and Entertainment Complex subject to the approval of Conditional Use Permit No. 407� Asdmen"eA The Pointe *Anaheim project is a fully - integrated, mixed -use development which will have an integrated management, a festive theme orientation and plaza /pedestrian- oriented IrtSerb amenities, and consist of the following: t; to 6gFi 898 g£esa- A ... - .:: Page 3 -23 Insert A (page 1 -8, 3 -23, 7 -30, 10 -7) (page 6 -41, 6 -42) 634,600 gross square feet of retail /dining /entertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot bus terminal /facility for airport transport and to /from sightseeing venues. Depending on the availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project and the number of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with Specific Plan Amendment No. Study /Mitigated Negative Declaration was pre/nhoa of CEQA. The Addendum demonstrated th Declaration which were included in Amendm substantially worse environmental impacts a environmental review was required. Insert C (page 3 -27) A an Addendum to the Initial compliance with the requirements ranges to the Mitigated Negative 5 would not result in any new or no supplemental or subsequent Up to 200 of the 1,662 hotel rooms rpay be developed as Vacation Ownership Resort units. Up to an additional 150,000 s are feet of hotel gross square feet could be built in the proposed project if the devel er elects to develop all 200 Vacation Ownership Resort units due to the larger sure footage associated with a Vacation Ownership Resort unit. Insert D (page 3 -27) One of the hotels is /plane to incorporate a theater /night club area of approximately 17,000 gross square his area has been incorporated into the total hotel square footage. Up to 133,630 gro square feet of area on the top of the parking structure is planned for development as hotel conference center. Associated with the hotel conference center is a 62,500 gro s square foot outdoor terrace area, which will accommodate outdoor events. Depe ding on availability of funding at the time of construction, the conference center may bfi reduced in size or eliminated from the project. The Disneyland Resort Specific Plan .;. Section 3.0: Land Use PIan Pacifica Convention Way + •Avenue •— zii i Orangewood Avenue The Disneyland Resort Specific Plan Anaheim California Legend Pointe�Anaheim Overlay � 0 1000 2000 Feet q) North Exhibit 3.3.6a— Pointe'Anoheim Overlay L-- J Anaheim Resort Boundary L_ _ J Disneyland Resort Specific Plan Boundary Designated for Future Extension in Existing General Plan Circulation Element Pointe'Anaheim Overlay Page 3 -24 Ball Road _ (....west ...::..: V •Parking : : : : ::::: ::: \ . . . . . 'Area I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Existing . . . . . . . �. •\ • I . . . . . . Disneyland . . . . . . . I. ..\ .. ... . . . . . Theme Park . . . . . . . G ('Cerritos Avenue ;;;;;;;;;;;;;;;;; .. � .. ..... .....................I L. .................................I. a mss . .........................I. ..... a \ m I,I:: ; I. 'Hotel District : :::::::.::: : :::: : Eas 9. x I .\ 1 E �1 . . : ::...... :::.................. . . . . . . . . . . . . . . . . . : - Area . .._ I.......... 0 :::.::: :....... _. way ' .I. . . . . . r `? . .Z Theme Park . . . . . . . I.. .... I Nor o .. a . . .. .. ...... . .. m \ �,I......1°° f:h .............. I > _Z y . ;I ........ ........... 3Q ............... a :I ......:::::::::.: :....... :: U Katella Avenue_ - - I Future Expansion L — ;�' (• District South Parking . . -I., Anaheim F Area - Convention _ r , Center Pacifica Convention Way + •Avenue •— zii i Orangewood Avenue The Disneyland Resort Specific Plan Anaheim California Legend Pointe�Anaheim Overlay � 0 1000 2000 Feet q) North Exhibit 3.3.6a— Pointe'Anoheim Overlay L-- J Anaheim Resort Boundary L_ _ J Disneyland Resort Specific Plan Boundary Designated for Future Extension in Existing General Plan Circulation Element Pointe'Anaheim Overlay Page 3 -24 The Disneyland Resort Specific Plan •;• Section 3.0: Land Use Plan Program Summary for Pointe *Anaheim Overlay Land Use Maximum Area (Square footage) Number of Hotel Rooms /Maximu/ NParkin umber of Seats/: Spa HOTEL AND THEATER Hotel (2 to 3) Hotel Rooms Restaurant/ Lounges Banquet Meeting Rooms Retail 836.815 18.185 68.000 800 1,050 roo Subtotal Hotels 923800a LIVE THEATER Theater A 2.350 seats Theater B 1.500 seats Theater C 7 750 seats Subtotal Theaters 85,000 4,600 seats RETAIL /DINING /ENTERTAINMENT (RDE) Specialty Retail 335.000 NA Dining 140.000 5.600 seats ENTERTAINMENT Night Club 40.000 1.600 Games /Video Arcade 25.000 NA Museum 25, NA Subtotal Entertainment goobo 1.600 seats Subtotal RIDE 5 .000 7,200 seats PARKING Parking Structure 1.600,000 4.800 automobile spaces and 25 bus spaces` Parking and /or Hotel Amenities Top Floor of Parking Structure 141.200 NA Bus Terminal /Facility Area Inside Parking Structure 21.600 a. Approximate square foota e. The analysis presented in the document is based on number of hotel rooms d 56.985 square feet of accessory uses. b. The actual square /ange ge of the live theater may vary, based on lobby. stage, and backstage area. Thlysis presented in this document is based on the number of seats: therefore, a in the square footage would not change the results of the /provis'n s present with the exception of electrical use. With a larger theater, a test for al elec cal usage would be required to determine if a significant impact to al cap ity would occur. If so, additional mitigation would be required. As an tive, a theater uses could consist of a 24- screen movie theater (including m ely 4,757 seats). , c. s' n to park an additional 400 parking spaces which would br ing the total of vehicles that can be accommodated in the garage to 5.200 cars. d. and /or Hotel amenities including tennis courts, a swimming pool, root garden. 's playground or similar uses serving only guests and patrons of the Anaheim hotels. - Exhibit 3.3.6b— Pointe 'Anaheim Overlay Development Program S <-I n5er+- Table 1 Page 3 -25 Table 1 Insert (page 3 -25) Pointe Anaheim as Proposed Land Use Gross s . Ft. unless noted HOTELS Number 3 or 4 hotels Rooms' 1,662 rooms Hotel Room Area' 1,048,700 Restaurant/Lounges 58,245 Banquet/Meeting Room Space 204,620 Retail 2,400 Health Club 16,806 Sub - total, Hotels 1,330,771 Indoor & Outdoor Hotel Amenity Area 102,500 RETAIL/DINING /ENTERTAINMENT (RDE) AND OTHER COMMERCIAL USES Retail 389,850 - Specialty Dining 3,634 seats /90,850 Entertainment Night Club 400 seats /10,000 Games/Video Arcade 20,000 Museum 30,000 Sub- total, Entertainment 60,000 Sub- total, RDE 540,700 Other Commercial Uses 94,000 Total, RIDE and Other Uses 634,700 PARKING Structured /Covered Parking 1,949,800 4,800 auto spaces 15 buss aces Bus Terminal 10,200 a Up to 200 of the total number of hotel units shown in the proposed project may, at the developer's discretion, be developed as fractional interest (i.e., Vacation Ownership Resort) units. b Up to an additional 150,000 square feet of hotel area could be built in the proposed project if the developer elects to make all 200 of the designated portion of the total proposed hotel rooms into Vacation Ownership Resort units. Depending on availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project. c Proposed project includes a shared conference center primarily for hotel guests on top of the parking structure. Depending on market conditions, the conference center may be reduced in size and a recreational amenity of up to the same number of square feet as the reduction in such conference center size may be developed on top of the parking structure and /or elsewhere within the project. d Not accounted for separately in the approved project. e Approved project included a live theater complex with 4,600 seats. Proposed project deletes these theaters and includes another commercial attraction use(s), presently anticipated to be an aquarium. f The approved project includes an additional 400 spaces via tandem parking and valet, for a total of 5,200. The proposed project assumes that all parking needs are served with striped self -park spaces, and includes a surplus of up to 1,048 extra spaces that may be built at the developer's discretion compared with the estimated parking need of 3,752 total spaces. Depending on availability of funding at the time of construction, the number of auto spaces may be reduced to 3,752 spaces. Sq. footage area shown includes vehicular circulation and loading docks. The Disneyland Resort Specific Plan .,. Section 3.0: Land Use Plan seeiugueaeeetThe Pointe *Anaheim project density is set forth in more detail in Exhibit 3.3.6a. The retail /dining /entertainment square footage would in- clude the following: banking facilities: children's, men's and women's apparel, shoes, jewelry and accessories; en- tertainment facilities (amusement arcades, skating rinks, outdoor recreational playground areas, etc.): shopping ser- vices: specialty merchandise, gifts and toys; transporta- tion /travel services including an automobile rental agency office (with no on -site storage of cars): radio and television studio to enable live and /or taped broadcast facilities at the site: baby - sitting services; fast - food /food court -type and walk -up /specialty restaurants; enclosed and semi -en- closed full - service and theme -type restaurants /clubs with on -site sale and consumption of beer, wine and alcoholic beverages and associated entertainment uses (billiards, dancing, live and recorded performances, etc.) and art gal- leries /museum uses. AS61rYt"eA The Pointe *Anaheim Overlay wod also permit, as part of Conditional Use Penn lVo. 407 a it n indoor amphitheater �1­1-e-s a he cterefeete outdoor events uses held within the confines of Pointe *Anaheim, out of view of the public right -of -way and not directed toward the public right -of -way including open -air festival events oriented to- ward tourists and guests (i.e.. for public gatherings, speech- es, concerts, presentations or shows): outdoor booths. kiosks, and stands: and outdoor special lighting. QS S M As previously noted, the majority of the project would be EXh %lPit3 5.8.3.pr.1 concentrated on three levels of developmen The Si'Y o fihrough 5.8.3 level is at street level at the outer perimeter and descends to approxim ely ee feet below grade at the center of the project. The t Level would consist primarily of hotel ground floors and parking, and accessory and service uses supporting the restaurant and retail stores, including truck loading areas. Levelalso starts at street grade at the outer erimet�r of the project, beginning at the same point as the w eed Level. Level;r is built on an ascending incline over t ti^GC Level. At the center of the project, the floor of the tYCC Level is at three feet below str et grade. Level 9 X is 12 feet above street grade. LevelsX an*would include the various retail uses listed above and hotel Page 3 -26 The Disneyland Resort Specific Plan V Section 3.0: Land Use Plan rooms. Remaining hotel rooms would be on higher floors. More detailed descriptions of the various land uses are pro- vided below. Hotel Uses dour The plan depicts up to three hotels on site. Hotel uses are proposed generally along the perimeter of the project site �CtAsn eG fronting on Disney Wayland Katella Avenue. The hotels would feature convention, specialty and family suites -ori- ented facilities including, but not limited to, banquet and meeting spaces, exercise facilities, restaurants, and retail facilities. }the COYn Cf 5cuth- eLlStoYn A The first hotel is located in the aekr eeftErai portion of the pFG(Cn12Y1tirIG site on EheseaEl� s' The second hotel is S e�: nE ellil cLAue' • planned at the southwest corner of Disne Wa and YQtC!(CLIlVC�C� Y Y ey third hotel is planned on the north side of ((CMEAHnC an d KatellaAvenuel aE��" total SyCet D15ne,yW&y- number of hotel rooms will be V.95 . The hotels would be Mid%Nlotk high -rise construction. As cu ently� esigned. the hotels befyaCen would range in height from 6 [o feet. The ultimate height of the structures will be determined by the hotel companies who develop within the project site: however, the hotels will comply with the height requirements of The Dis- neyland Resort Specific Plan, and if shade /shadow impacts exceed those addressed in this document, additional envi- ronmental review will be conducted. AS nC ----- final design and ultimate number of hotels will be based on the hotel developer(s) and will be shown on Final Site Plans to be reviewed and approved by the Planning lns�Y} D Commission prior to issuance of building permits. As r b Ai f �laclaw mm;ng � �9R� -�SeSt Retail /Dining /Entertainment (RDE) Retail, dining, and entertainment (RDE) uses are located primarily on Levels 1 and 2 of the project. Restaurants in- clude fast -food and food court-type service, semi - enclosed, walk -up /specialty, enclosed full service establishments, and theme -type restaurants. Page 3 -27 Insert A (page 1 -8, 3 -23, 7-30,10-7) 634,600 gross square feet of retail /dining /entertainment ses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 2 units can be developed as Vacation Ownership Resort units) with approximate] 282,071 gross square feet of related accessory uses (the hotel rooms /accessory es would encompass a maximum of 1,330,771 gross square feet) and, of that tota i approximate 133,630 gross square foot area on the top floor of the parking struc re to be used for a hotel conference center; and a 1,949,800 gross square foot rking structure with up to 4,800 striped parking spaces and 15 bus park/spa s with a 10,200 gross square foot bus terminal /facility for airport transport m sightseeing venues. Depending on the availability of funding at the time of n, the conference center may be reduced in size or eliminated from the projenumber of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with SpeVic Plan Amendment No. 5, an Addendum to the Initial Study /Mitigated Negative eclaration was prepared in compliance with the requirements of CEQA. The Addendum demonstrated that the changes to the Mitigated Negative Declaration which were included in Amendment No. 5 would not result in any new or substantially worse ; environmental impacts and that no supplemental or subsequent environmental revidw was required. Insert C (page 3 -27) Up to 200 of the 1,662 hotel rooms may be developed as Vacation Ownership Resort units. Up to an additional 150,000 square feet of hotel gross square feet could be built in the proposed project if the developer elects to develop all 200 Vacation Ownership Resort units due to the larger square footage associated with a Vacation Ownership Resort unit. Insert D (page 3 -27) One of the hotels is planned to incorporate a theater /night club area of approximately 17,000 gross square feet. This area has been incorporated into the total hotel square footage. Up to 133,630 gross square feet of area on the top of the parking structure is planned for development as a hotel conference center. Associated with the hotel conference center is a 62,500 gross square foot outdoor terrace area, which will accommodate outdoor events. Depending on availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project. The Disneyland Resort Specific Plan V* Section 3.0: Land Use Plan As currently designed, the project would include up to thre live theaters with a total of 4.600 seats (situated in a ox- imately 85,000 square feet of space). However, 3aKendent on market demand, the theater complex m alternatively be developed as a 24- screen movie the r (4.757 seats). The Final Site Plan will identify th eater use to be devel- oped and number of seats an will be reviewed and ap- proved by the Planning mmission prior to approval of grading or subdivis' plans or issuance of building per- mits. The thea s would be located immediately west of Freedm ay, south of the existing fire station The height of th eater structure would vary, but would not exceed 7 feet in height. Bus Terminal /Facility in the Parking Structure A bus terminal /facility is planned in conjunction with the project to provide bus transport to and from regional air- ports for visitors to the Anaheim Resort area. In addition, the facility may be used as a terminal for sightseeing bus An trips to accommodate hotel visitors. loading area of apt Chl'I%CA On vill be utilize he' jeVel inihGeenter e t d, 0 fiY1G ez r Bus ingress and ��EmentineSt+ egress is planned to be viaiFr-ee4maw Fey-end- HeA96r -Bet*- {evarftThe facility is not planned to serve as a - park and ride facility for local residents. A high fee will be charged for overnight parking (other than for hotel guests) as a deter - rent to use the facility as a park and ride facility or for other overnight parking needs. Landscaping The perimeter of the project site will be landscaped in accor- dance with the requirements of The Disneyland Resort Spe- cific Plan. The following fully - landscaped setback areas will be provided: a minimum 26 -foot wide setback adjacent to Harbor Boulevard; a minimum 11 -foot wide setback area adjacent to Katella Avenue: a minimuA? 20 -foot wide set- back area adjacent to Disney Way and � one ex- cept adjacent to e hotel lot et tli southwest comer of �'Ternen nne S a tr�{ Disney Way an where the building height exceeds 75 feet, where the minimum setback will then be 30 feet wide: and. a minimum 10 -foot wide setback adjacent to interior property lines. ` Page 3 -28 The Disneyland Resort Specific Plan V Section 3.0: Land Use PIan Signs A coordinated signage program will be developed for Pointe•Anaheim All per -ff 4tteeksignage will be reviewed and approved by the Plan- ning Department as being in conformance with the Specific or proae6l -c - an, as amended, prior to the issuance of sign permits. With waiver orJaranc Signs which require the approval of a Conditional Use Per- mit will be processed concurrently with the Final Site Plan. Conceptual Site Plan Exhibits The Conceptual Site Plan exhibits ar e provide n Section 5.0. Design Plan in Exhibits $ ' ' I to 5.9.3• fo. 3.4 Phasing Plan The anticipated opening date for the new theme park is in 2001. Development of The Disneyland Resort is planned to take place in several phases: the first completed in 1996: the second concluding in 2001; the third (buildout) com- pleting in 2010. Phasing for development within District A and the C -R Overlay is not known at this time. lt1gcrt E T�i ♦ dtrola�L -i i - 3 • •Y i i • Page 3 -29 The Disneyland Resort Specific Plan * *,* Section 3.0: Land Use Plan Exhibit 3.4a shows the location of phasing components. The primary objective of the Phasing Plan is to minimize the effect of construction on the local street thoroughfares and adjacent residential neighborhoods, and to ensure the pro- vision of adequate infrastructure as well as to ensure smooth operation of the existing Disneyland theme park and Disneyland Hotel. Anaheim Convention Center, and other area businesses during construction. Specific im- provements associated with each phase are indicated in the following descriptions of each phase and in Section 4.0, 'Public Facilities Plan,' which contains information on the phasing of public facilities. 3.4.1 Phase I (1996) The first phase of development has been completed and en- tailed the construction of the first part of the Disneyland Administration Building and associated parking. This de- velopment was on a nine -acre site in the northeast section of the Theme Park District along the 1 -5 corridor. Approxi- mately 330,000 square feet (of the permitted 475.000 square feet) of the Administration Building has been com- pleted. Also, approximately 1,800 parking spaces (of the permitted 2,300 parking spaces) have been built. Page 3 -30 Phase I (1996) E (page 3 -29) The Pointe Anaheim Overlay project will be an integrated development which will be phased over time. Construction activity of project buildout will progress over five areas of the project, with two alternatives for Area A and Area B. The first phase is projected to open in mid -2004 and is planned to include those portions of Area A that, depending on market conditions and other circumstances, can realistically be commenced in mid- to late -2002. The Initial Phase would likely include approximately 120,000 square feet of RDE and other commercial uses in Area A -1, or approximately 300,000 square feet of RDE in Area A -2 if the aquarium lease is consummated prior to issuance of building permits. Given the present market conditions, it is likely that development of hotel rooms will be deferred. However, the portion of the Project Site where the hotel in Area A is planned will be improved in the Initial Phase so that hotel rooms can be added as soon as market conditions permit. The intent is to begin on the next phase of construction within approximately one year of the opening of the previous phase of development; however, the timing of the phasing will depend primarily on market demand at the time and the availability of project financing. Insert F (page 6 -45) Additional proposed uses requiring Code amendments include the proposed aquarium and Vacation Ownership Resort units. Code amendments would also be required to conditionally permit murals and directional signs for the project and to delete the landscaping along the interior boundaries of the project site. Insert G (page 6 -59) The Addendum to the Initial Study /Mitigated Negative Declaration determined that the modified project would demand less water than the previously approved project, even with the proposed aquarium. Insert H (page 8 -20) 8.7.5 Amendment No. 5 Amendment No. 5 to The Disneyland Resort Specific Plan No. 92 -1 related to the Pointe Anaheim Overlay allows the development of the Pointe Anaheim Lifestyle Retail and Entertainment Complex as an integrated development to be constructed in up to five phases over a period of time. Insert I (page 7 -42) (3) For the Pointe Anaheim Overlay, off -site and on -site directional signage may be included as part of the overall Coordinated Sign Program if considered and approved as a part of the Final Site Plan or as amended. The Disneyland Resort Specific Plan V Section 3.0: Land Use Plan Ball KatelloAvenue Orangewood Avenue C Anaheim V7 Convention = Center • Distric Pacifica East . . . !Avenue E Parking: r — — — — — - — Area. . . . z KatelloAvenue Orangewood Avenue C Anaheim V7 Convention = Center • Distric Pacifica Convention Way !Avenue E r — — — — — - — KatelloAvenue Orangewood Avenue C Anaheim bistric Convention Center Pacifica Convention Way !Avenue r — — — — — - — z 2 The Disneyland Resort Specific Plan Anaheim, California Legend Phasing Plan F= Anaheim Resort Boundary : Disneyland Resort Specific Plan Boundary Designated for Future Extension in Existing General Plan Circulation Element 0 1000 2000 Feet North On-Going Theme Park Operations Phase l:1996 Phase 11: 2001 Areas to be Developed in Phase 11 and Phase III Exhibit 3.4a— Phasing Plan Phasina Undetermined Page 3-31 The Disneyland Resort Specific Plan + Section 4.0: Public-Facilities Plan Clementine Streetrwill serve two lanes of travel in each direction and will be widened to accommo- date a new landscaped median and left and right tum lanes. The right -of -way is 105 feet just south of the Disney Way / °-� CIS- M&Iti'n-e. $ ___Y intersection. t he Gverieq- pmjee South of the City Fire Sta- tion, a northbound left -turn pocket and median break is provided for left tyrns into the P�oi *Anaheim project. North of the Katella Avenue ay intersection, the right -of -way decreases to 102.5 feet. Freedman Way improvements will be completed in Phase III. However, improvements associated with the develop- ment of the Pointe *Anaheim Overlay project (as required by the Pointe *Anaheim Mitigation Monitoring Plan will be completed in conjunction with project development. 3 travel 2 travel lanes lanes Median/ Sidewalk left -turn Sidewalk and Planting lane and Planting area area Y 12 ft VAR VAR VAR 13 It 93.5' Right -of -way: 118.5 It Exhibit 4.3.2p (1) Freedman Way Cross Section n/o Fire Station Page 4 -22 The Disneyland Resort Specific Plan •;• Section 5.0: Design Plan 5.6.9 Interior Setbacks Interior setbacks are those setbacks not adjacent to a pub- lic street. The following is a description of the proposed landscape treatment for the four typical conditions within the Specific Plan area. Also see Section 7.0, 'Zoning and De- velopment Standards,' (Code Section 18.78.050). 5.6.9.1 Interior Setbacks between Adjacent Properties Within the Some District Between two properties located in the same District, the setback may be zero feet from the property line, provided the setback between adjacent buildings is a minimum of ten feet. 5.6.9.2 Interior Setbacks for Adjacent Properties in Different Districts Between two properties located in different Districts, but within The Disneyland Resort Specific Plan area, the min- imum setback may be zero feet from the property line, provided the setback between adjacent buildings is a min- imum of ten feet except in District A and in the East Park- ing Area adjacent to District A where the minimum setback shall be ten feet. 5.6.9.3 Interior Setbacks Adjacent to Anaheim Resort Uses The minimum setback adjacent to properties zoned Ana- heim Resort Specific Plan No. 92 -2 shall be ten feet. The Pvs An0.heifnov w'thin exla IAY setback area will be landscaped with trees and other plant PrrnteRtn material ccording to the layered landscape concept de- scribed in Section 5.3.1.5. 5.6.9.4 Future Expansion District Interior Setbacks adjacent to Residential Uses The minimum building setback adjacent to a residential zone will be fifty feet, including a minimum landscape set- back of twenty feet. The landscape area will be planted with closely spaced, evergreen, vertical trees (maximum ten feet on center) in order to help screen the view of buildings from adjacent residential uses. In addition, no windows which allow views of adjacent residential uses will be permitted within one hundred fifty feet of the prop- erty line. The following cross section illustrates this con- dition. Page 5 -71 The Disneyland Resort Specific Plan V Section 5.0: Design Plan Therefore, the regulation allows for variation in the size and number of trees. 5.6.10.2 Tree Density to Vary According to Adjacent Use The regulation also recognizes that the density of trees ad- jacent to some types of uses should be'different than the density adjacent to others. The densest tree planting will be required adjacent to public parking facilities or resi- dential uses. Dense planting will also be required adja- cent to other parking structures, back -of -house uses in the Theme Park District service areas, or adjacent to oth- er uses in the Anaheim Reso . The least dense planting �OiV1tb!°U'lah� will be required adjacent to Disneyland Resort hotels, overlay theme park entries, to other features where visibility to the public is important. 5.6.10.3 The Tree Density Factor To differentiate one tree density from another, all final landscape plans submitted to the City for approval will be required to show the Tree Density Factor for each land- scape area. To establish the Tree Density Factor, all trees planted in the Setback Realm will have a point value based upon their size at installation. The point value var- ies depending on the size of the tree: large trees have a higher point value than small trees (the actual values are defined below). The Tree Density Factor for any landscape area is defined as the sum of the point values for all trees installed divided by the total area required to be land- scaped. The Specific Plan establishes three levels of tree density, defined as follows: Very Dense: ? .8 Dense: ? .5 < .8 Moderately Dense: <.5 Exhibit 5.6.10.3a, 'Tree Density Factor Plan.' shows the location of each density of tree planting required by the plan. All trees are also subject to a minimum size at the time of installation. Exhibit 5.8.4a, "free Selection Ma- trix.' defines the minimum permitted tree size to be used. The tree point values are defined in the following table: Page 5-73 The Disneyland Resort Specific Plan V* Section 5.0: Design Plan Boll Rood West : E Parking �t Area :I .. ............. ; ' Disneyland ' ' ' ' • Theme Park • • • • Orangewood Avenue The Disneyland Resort Specific Plan Anahe California Tree Density Plan "MMM06MMMPMMMMM� //µ 0 1000 2000 Feet V/ -t North Exhibit 5.6.10.30 —Tree Density Factor Plan I� 0 a m a 00 Ared ! p f 1– ��j�E� dman Way / y District A . '' C Parkingp E: x Distr.cf� gi U Future / � , y� I .: Expansion yuyryi �. i . Q^. nw e District —. . . . I r Pacifico Avenue y H N a x M Ilc. T G == . as amended per GPA 331 Note: Existing i � ' ' ' Disneyland V/. ✓ . , ' ' ' ' ' ' -• • -� Hotel setbacks ,�. . . . . . . . _ . General Plan Circulation Element to remain as is / / . . • . . . . Theme Park • District WFAZM ,1 • //iiiiii Moderately Dense (Tree Density Factor <.5) %........... -I -/ . . I:: . Hotel . . . ' . . . . District :: ........... . ./ . . . ............. _/ ./. . • r �. a . . N010 I %.� .Theme . Prk .. . a . . . . . Katella Avenue Anaheim Convention Center Orangewood Avenue The Disneyland Resort Specific Plan Anahe California Tree Density Plan "MMM06MMMPMMMMM� //µ 0 1000 2000 Feet V/ -t North Exhibit 5.6.10.30 —Tree Density Factor Plan I� 0 a m a 00 Ared ! p f 1– ��j�E� dman Way / y District A . '' C Parkingp E: x Distr.cf� gi U Future / � , y� I .: Expansion yuyryi �. i . Q^. nw e District —. . . . I r Pacifico Avenue y H N a x M Ilc. T G == Anaheim Resort Boundary as amended per GPA 331 L'— .J Disneyland Resort Specific Plan Boundary -• • -� Designated for Future Extension in Existing General Plan Circulation Element Very Dense (Tree Density Factor 2!.8) WFAZM Dense (Tree Density Factor 2!.5 <.8) //iiiiii Moderately Dense (Tree Density Factor <.5) Page 5-74 The Disneyland Resort Specific Plan •;• Section 5.0: Design Plan Icon kgrwge by Buddirij envelope conditKKgl use Layered landscape in setback Permit when v ble to co Cover chat treat Shfut.)5, ground cover prw Iurt Wbrx: rgnt of way Double row of Date Double row of Dale Pokrtwenty -four feel Pplmx twenrydour feet (2111%. center (24) on center Special light fixture Grouna cover troy I and banner pole in inclutle turf. ground parkwoy and cover. or shrubs r Macon. typical Private ( Setback Realm Realm Pubfc Realm o' 3 S Icon Height Shall not exceed 30 feet c Per Maximum Structural Height Exhibit Amended per Ordinance No. 5613 Beading envelope 2:1 sky exposure prone trouts building height Maximum building height at selbcck: 75 feel / Lrntlscaoe in Setback Realm by IOndowner 2 Landscaped parkway in Public Realm / Sidewalk Landscaped Cenfe"im parkwoY rnd capetl en an Bn ee me —_ R 1 1 1 Width to centedine: 82 to 83 R I Poina*Anahaim Overlay I Ultimate Koalla Avenue rlghbcf-way: 164 to 166 ft Nde: Rgru -- O cRmeN Cx— Wcal OM may vary nom thge NOwn. %NIBOt to me aCgO U me day Engineer 3d Katella Avenue: Setback Adjacent to Pointe`Anaheim Overlay (ultimate condition) Exhibit 5.8.2e (2) —Half Street Cross Section 3d Katella Avenue Page 5 -142 The Disneyland Resort Specific Plan V Section 5 .0 : Design Plan Icon Slgnoge by conditional use permit when visible to public right of way layered landscape in setback to consist of trees. sh ubs. vines. ground cover and /or lurt Parkway Wanting to consist of alternating vertical trees and small or medium canopy trees Planting on ground may Include ground cover and /or turf thing to consist of V trees. shrubs J cover and /or Icon Height shall not exceed BO feet Icon Signage by conditional use permit when visible to public right of way j Wang envelope / by n Setback Future nn n pede transpo system Ream Realm by landowner to coect t witweb Future nsi District (approximate building envelope) ) . Sidewalk Landscaped 20 it lab 8n Mm burs" Landscaped median Parking District I C S right - -w ay: 87 ft } — Note: night of -way omensbrs as typk l and rrwy vary Born those mown s olect to rcre aoao d or t" city Enpneer Cleme�`' 27a Reeelmen Wa y Setback Adjacent to Pointe'Anaheim Overlay Exhibit 5.8.2ok (1) —Half Street Cross Section 27a Freedman Way Poge 5-175 Private Setback Realm I Realm Public Realm 3 a a, E The Disneyland Resort Specific Plan V *� Section 5.0 Design Plan Parking facility, if located south Minimum setback: 10 ft, as of Freedman Way, could be shown in Cross Section 28. served by a second level ramp, Section 5.8.2 V which crosses over Freedman 1 m Way from westbound • tl �!— —� Freedman Way Minimum setback: 10 ft, as Minimum setback: 1Oft. as I T . < ,� \ shown in Cross Section 18a. shown in Cross Section 28, � is Section 5,8.2 Section 5.8.2 E ' • . . • • • I a 0 ft. between setback and m . V . I Southern California Edison / 1 Corridor as shown in Cron Section �lb`etCarrON� s Free man Way Minimum setback: 20 ft, cis shown in Cross Section 15. I i Section 5.8.2 District A � Minimum setback: 20 ft. as H Shown in Cross Section 17, m� Section 5.8.2 i c cn r I E Minimum setback: 10 ft. as �� I • �I J U' shown In Cross Section 28. • . • Addity exit parking xit Section 5.8.2 ' facilit y t • ::: �� I 'fE+ --— Minimum setback: 20 ft, as shown in Cross Section 27, L' t Section 5.8.2 Katella Aven Minimum setback: 11 ft. as shown in Cross Sections 4o and 4b, Section 5.8.2 The Disneyland Resort Specific Plan Anaheim, California Legend Parking District Concept Plan East Parking Area 0 300 600 Feet North Exhibit 5.8.3c Parking District Concept Plan: East Parking Area 19 1 - Buildable area Location of full vehicle access point ® Southern California Edison Corridor: 220 kV line to be located above ground Page 5-782 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay The following discussion addresses the consistency of the proposed General Plan Amendment and Specific Plan Amendment for the Pointe Anaheim project with the General Plan Commercial Recreation land use designation goals and policies and The Disneyland Resort Specific Plan goals and policies. GENERAL PLAN CONSISTENCY California Government Code §65450 - §65453 permit the adoption and administration of Specific Plans as an implementation tool for elements contained within the local General Plan. Specific Plans must demonstrate consistency in regulations, guidelines and programs with the goals, objectives, policies, programs and uses that are set forth in the General Plan. The Anaheim General Plan contains Land Use, Redevelopment, Circulation, Scenic Highways, Environmental Resource and Management (including Conservation; Open Space; Parks, Recreation and Community Services; and Safety and Seismic Safety), Housing, Noise and Growth Management Elements. The Specific Plan amendments for the Pointe Anaheim project have been prepared in conformance with the applicable goals and policies of the General Plan. Sections 1 through 9, which follow, include a discussion of the Pointe Anaheim project's consistency with the relevant goals and policies of each of the applicable elements of the General Plan. 1. General Community Objectives and Policies This section describes the general community objectives and policies from the General Plan. 1.2 General Community Objective 2 Maintain and enhance Anaheim as a regional, cultural and employment center by diversifying and enhancing the economic base of the community. 1.2.1 Project Implementation The primary planning concept for The Disneyland Resort Specific Plan was to create an urban destination resort that features several theme park attractions, resort hotels, restaurants, and shopping opportunities. The City realized that by creating a destination resort with more attractions, lodging and dining facilities, visitors will be encouraged to stay for several days, or more, and to enjoy the variety of recreation and entertainment opportunities available in Anaheim. r — I nsert A Anaheim project will help fulfill this wi wxwpt `L_ Poo '%'t- development wilt be pwxs o4cr h'ma wtts�in (rive arcas of -me prcjech, The Pointa Anaheim project will directly add nawjobs as a result of its construction and operation, it will also induce newjobs as a result of income spent by workers filling these direct jobs. In addition, it may result in indirect employment, to the extent that direct employment leads to local purchases of materials and services, Page 6-41 Insert A (page 1 -8, 3 -23, 7 -30, 10 -7) (page 6 -41, 6 -42) 634,600 gross square feet of retail /dining /entertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot bus terminal /facility for airport transport and to /from sightseeing venues. Depending on the availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project and the number of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with Specific Plan Amendment No. 5, an Addendum to the Initial Study /Mitigated Negative Declaration was prepared in compliance with the requirements of CEQA. The Addendum demonstrated that the changes to the Mitigated Negative Declaration which were included in Amendment No. 5 would not result in any new or substantially worse environmental impacts and that no supplemental or subsequent environmental review was required. Insert C (page 3 -27) Up to 200 of the 1,662 hotel rooms may be developed as Vacation Ownership Resort units. Up to an additional 150,000 square feet of hotel gross square feet could be built in the proposed project if the developer elects to develop all 200 Vacation Ownership Resort units due to the larger square footage associated with a Vacation Ownership Resort unit. Insert D (page 3 -27) One of the hotels is planned to incorporate a theater /night club area of approximately 17,000 gross square feet. This area has been incorporated into the total hotel square footage. Up to 133,630 gross square feet of area on the top of the parking structure is planned for development as a hotel conference center. Associated with the hotel conference center is a 62,500 gross square foot outdoor terrace area, which will accommodate outdoor events. Depending on availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project. The Disneyland Resort Specific Plan Section IM General Plan Consistency Pointe Anaheim Overlay 1,3 General Community Objective 3 Maintain and encourage Anaheim's position as a nationally recognized tourist, convention and recreation center. 1.3.1 Project implementation The purpose of The Disneyland Resort Specific Plan is to create a destination resort with gated attractions, more hotel accommodations and increased opportunities for shopping, dining and other recreational uses. t�-- Irlsert A The Pdjnte Anaheim project will create a synergy with other Resort Area attractions. It will "agrated.pcoject•tha located within walking distance of both the Anaheim Convention Center and the Disney tI eme parks. This close proximity of the project to these other major attractions will provide a wide range of visitor- serving facilities, and will help fulfill many Specific Plan objectives including, among others: (i1G Fo1nte. AvvAhG'Po4 (cam 4S • The creation of a fully integrated resort that will attract millions of visitors annually, increasing employment opportunities and full -time equivalent jobs. • The transformation of the Resort Area from a primarily day -use theme park into an urban resort destination incorporating multiple complementary visitor - serving facilities, thereby increasing the length of stay for Southern California residents, as well as visitors to Anaheim from around the world. - The enhancement of the Anaheim Resort by providing a wider range of attractions, hotel accommodations, restaurants and shopping opportunities. • The assemblage of under - utilized properties to create a fully - integrated project that is consistent with the landscaped setbacks and public improvements (parkway and walkways) of the Resort Area that will help to create a unified identity that will serve as the impetus for further growth and diversity in and around Anaheim. 1.4 General Community Objective 4 Provide all working, living and recreation areas with a full range of community facilities and services. 1.4.1 Project Implementation In conjunction with adding attractions and lodging facilities, another important Disneyland Resort Specific Plan objective is to improve public facilities and infrastructure to accommodate the growth and development that will occur in the Specific Plan area. The main public facility components that will be improved as a result of the Pointe Anaheim Overlay include enhancements to the transportation infrastructure at a total of 16 intersections throughout the Anaheim Resort area. The system of traffic loop detectors that will be installed as a project mitigation measure, known as the SCOOT System, will be connected to traffic signal controllers; Use of this system is projected to improve traffic circulation as far north of the project site as the intersection of Harbor Boulevard and Ball Road, and as far east as the intersection of Katella Avenue and Lewis Street. Page 6-42 Insert A (page 1 -8, 3 -23, 7-30,10-7) (page 6 -41, 6-42) 634,600 gross square feet of retail /dining /entertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot bus terminal /facility for airport transport and to /from sightseeing venues. Depending on the availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project and the number of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with Specific Plan Amendment No. 5, an Addendum to the Initial Study /Mitigated Negative Declaration was prepared in compliance with the requirements of CEQA. The Addendum demonstrated that the changes to the Mitigated Negative Declaration which were included in Amendment No. 5 would not result in any new or substantially worse environmental impacts and that no supplemental or subsequent environmental review was required. Insert C (page 3 -27) Up to 200 of the 1,662 hotel rooms may be developed as Vacation Ownership Resort units. Up to an additional 150,000 square feet of hotel gross square feet could be built in the proposed project if the developer elects to develop all 200 Vacation Ownership Resort units due to the larger square footage associated with a Vacation Ownership Resort unit. Insert D (page 3 -27) One of the hotels is planned to incorporate a theater /night club area of approximately 17,000 gross square feet. This area has been incorporated into the total hotel square footage. Up to 133,630 gross square feet of area on the top of the parking structure is planned for development as a hotel conference center. Associated with the hotel conference center is a 62,500 gross square foot outdoor terrace area, which will accommodate outdoor events. Depending on availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project. The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay Other enhancements to the tr nsportation infrastructure that will result from the Pointe Anaheim.project Include a new aisneyrWeytand, right to my pockets provided at all entries along Disney Way,�Ffee*nem Stra--t Way and at the main Kate a Avenue entry. 1qe -turn -only rote- ei&,tfon on CtamenKnt..Btrcctgpprwfmately midway 2. Land Use Element bar'' y u ^ °r B °utavard aut Cttmenh'nGStrCmt; a. mul an break on P ronw7e a to po,ntrA$atAhaim��Q�6mP�th'ne Strett tb This section describes the portions of the Land Use Element of the General Plan which apply to the Specific Plan. 2.1 Commercial Areas Goals and Policies • To meet the continuing needs and demands of the community for commercial goods and services at well designed, safe and convenient locations within the community; • To increase Sales Tax yields and further enhance the economic base of the community, thereby lessening the tax burden on real property; • To maintain and enhance the position of the community as a nationally recognized tourist center. 2.1.1 Policy Encourage and provide for the development of a broad range of quality commercial facilities at appropriate locations throughout the Community. 2.1.2 Project Implementation The Pointe Anaheim project will provide for the development of quality visitor - serving commercial facilities including: to y} too tAUranTS • Retail - struction of up to23E,;�89 square feet of specialty retail storesYY'P!� , Ancl. i ) co Pinin9/Fnte✓tainment GnteMlArreot Jenues; - Resiawar♦t -G tip to 140,000 s9waFe4aato4esWuraPAsL ylv) orltu✓ • Hotels - 1,05anew hotel room intwo-orthreCotels;= iY%6WAIn9A 133,�3g {�trG}DOtCon��rtn�c /SUittS GeArer; and. U toy} Boo Parking Facilities - a parking garage accommodating A cars ithf spaces wittP¢rcw{sio and parking forXtour busesr W ith Ll. 10,2 15 gYOSh 5ci}utrG f b;s 2.1.3 Policy "t'Wrw Ail7 ty. Encourage the grouping of complementary commercial uses adjacent to arterial highways; and, the total citywide inventory will reasonably relate to the size and character of the population to be served. page 6-43 The Disneyland Resort Specific Plan Section 6.0: General Plant Consistency Pointe Anaheim Overlay 2.1.4 Project implementation The Pointe Anaheim project implements this policy by grouping visitor- serving commercial uses and new hotels adjacent to arterial highways, including Harbor Boulevard, Kateila Avenue and Disney Way. 2.1.5 Policy Encourage the development of well- designed commercial areas through the application of site development standards which provide for: • The compatible integration of commercial uses when they are adjacent to other commercial recreation uses and industrial areas: and, • Adequate off - street parking, loading areas, landscaping and other appropriate site improvements. 2.1.6 - Project Implementation Construction of the Pointe Anaheim project will result in removing several non - conforming industrial uses and redeveloping these properties as commercial areas. Extensive on -site improvements will also be provided as part of the project, including installation of landscaping and construction of a parking garage, vehicular drop -off areas and fully - screened truck loading areas. At (•utl bu�ldot.rt' The six -level parking garal e will be fully integrated into the project allowing the occupants of tour buses and cars to w4k directly into the project from internal entrances. Extensive on -site landscaping along all four sides of the project adjacent to the public rights -of -way will be consistent with the gardel district feeling of the Specific Plan and will enhance the Anaheim Resort area. The project villi provide adequate on -site parki g in a structure accessible from all four surrounding streets{: Harbor Boulevard, Disney Way, Ree&Ran Way, and Katella Avenue. Loading areas a e located on the first floor of the parking structure for accessibility to all of the on -site uses. Once inside the structure, visitors A MI have easy pedestrian access to the project, as well as to other attractions within walking c istance of the project. 2.1.7 Policy CIc mfentine.Stveat' Provide all commercial developments with adequate and safe access to transportation facilities, fire and police protection, public utilities and other necessary community services. 2.1.8 Project Implementation Implementation of the Pointe Anaheim project will enhance existing transportation facilities and provide for construction of new ones. Vehicular access will be enhanced by improvements to collector and arterial roadways and well designed parking facilities with convenient access from all four surrounding arterials, that minimizes traffic on existing streets. � , t r'A'A b III h s'hu The Specific Plan, in conjunction with the mitigation measures set forth in then itigated Negative Declaration, also provides for adequate fire and police protection with the Anaheim Fire and Police Departments providing protection to the facilities. The Fire and Police Departments will review building plans and Final Site Plans for the project toe sure defensible space concepts have been incorporated in the design. In addition, the project will make permanent space available on -site for an Anaheim Police Depa tment ubstation at no cost to the City. yACVZ°IOpCt{ Wt n Are F I Page 6-44 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 2.1.9 Policy Encourage the development of quality facilities which complement conventions, family entertainment and recreation within appropriate areas of the community. 2.1.10 Project Implementation The Pointe Anaheim project is designed to directly implement this policy by creating a lifestyle retail entertainment center that will provide substantial visitor facilities to meet the long -term demand for entertainment, lodging, dining and retail uses, and will extensively expand the amount of hotel rooms and retail, dining and entertainment facilities available In the Anaheim Resort Area. The Specific Plan provides detailed design objectives and implementation mechanisms to ensure consistent high quality of all facilities and improvements, such as extensive urban design and landscaping plans and detailed development regulations. The Pointe Anaheim Overlay provides additional details concerning the nature and approximate location of all uses within the project, and Illustrative Plans for the project provide an indication of the high quality nature that is intended for these improvements. The City will have several opportunities, including through the Final Site Plan review and Conditional Use Permit process, to assure that the high quality indicated in these conceptual plans is included in the project. 2.1.11 Policy Maintain the integrity of the Commercial Recreation Area by permitting only compatible land uses within this designated area. 2.1.12 Project Implamentation t A o'5 The Pointe Anaheim Overlay will help to nhance the Anaheim Resort by providing a wider range of hotel accommodations, restau nts, shopping opportunities, entertainment facilities, pedestrian walkways and landscaped str etscape and setback areas to establish a unified resort identity. Lushly landscaped wal ys and courts will also be provided within the courtyard areas in the projects interior. of the proposed uses in the Pointe Anaheim Overlay are compatible with the uses currently allowed, or conditionally permitted, in the Anaheim Resort and The Disneyland Resort Specific Plan areas. 2.1.13 Policy Insert F Evaluate the interrelationship between the Downtown Area Redevelopment and the continued growth in the Commercial Recreation Area including both the Disneyland /Convention Center Area and the Anaheim Stadium Area to maintain the integrity of development trends. 2.1.14 Project Implementation The architectural character and quality of the buildings proposed for areas visible from public rights -of -way will be controlled through a combination of development regulations including setback requirements, height restrictions and design guidelines set forth in the Specific Plan document. The architectural character, landscape character, signs and street furnishings will all provide a premiere destination resort identity. These high quality treatments will be compatible with proposed developments in the Downtown Area and the Anaheim Stadium Area. Growth in each area will enhance the Citys overall image as a regional commercial and recreation center. Page 645 Insert E (page 3 -29) The Pointe Anaheim Overlay project will be dintegrated development which will be phased over time. Construction activity of p ject buildout will progress over five areas of the project, with two alternatives for Are, A and Area B. The first phase is projected to open in mid -2004 and is planned to ir}clude those portions of Area A that, depending on market conditions and other circumstances, can realistically be commenced in mid- to late -2002. The Initial Phase would)ikely include approximately 120,000 square feet of RDE and other commercial uses} Area A -1, or approximately 300,000 square feet of RIDE in Area A -2 if the aquan rh lease is consummated prior to issuance of building permits. Given the present met conditions, it is likely that development of hotel rooms will be deferred. However, � e portion of the Project Site where the hotel in Area A is planned will be improved i the Initial Phase so that hotel rooms can be added as soon as market conditions pet� it. The intent is to begin on the next phase of construction within approximately oyfe year of the opening of the previous phase of development; however, the timing " o the phasing will depend primarily on market demand at the time and the availability oy project financing. Insert F (page 6 -45) Additional proposed uses requiring Code amendments include the proposed aquarium and Vacation Ownership Resort units. Code amendments would also be required to conditionally permit murals and directional signs for the project and to delete the landscaping along the interior boundaries of the project site. Insert G (page 6 -59) The Addendum to the Initial Study /Mitigated Ne modified project would demand less water than with the proposed aquarium. Insert H (page 8 -20) 8.7.5 Amendment No. 5 Amendment No. 5 to The Disneylan d Anaheim Overlay allows the develo Entertainment Complex as an into ° g phases over a period of time. f Insert I (page 7 -42) (3) For the Pointe Ar included as part of the a part of the Final Site e Declaration determined that the previously approved project, even ,kesort Specific Plan No. 92 -1 related to the Pointe pment of the Pointe Anaheim Lifestyle Retail and rated development to be constructed in up to five Overlay, off -site and on -site directional signage may be Coordinated Sign Program if considered and approved as or as amended. The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 2.2 . Community Services and Facilities Goals and Policies 2.2.1 Goal - Police To meet community needs for public safety and law enforcement by utilizing allocated resources for the prevention, detection and investigation of crime, response to calls for service and maintenance of pedestrian and vehicular safety. 2.2.2 Policy Assist in evaluation of land use proposals and development patterns by providing input to the Planning Department to assist in site plan review and building analysis, and assessing land use trends and assumptions to determine future needs. 2.2.3 Project Implementation The Police and Fire Departments have been involved in reviewing the Pointe Anaheim Overlay proposal and will also be involved in the review of Final Site Plans and building plans. Approved emergency fire access to the project will be provided. The parking garage facilities will be well - illuminated by artificial lighting and closed- circuit television monitoring, recording or equivalent security measures as may be approved by the Police Department will be used extensively. Convenient access t9Jhe parking facility will be provided from a new 4 0aw4aft- hand-turadaaa"t- � which will minimize the demand for traffic police support. On -going during operation of the ointe`Anaheim Project uniformed private security officers will patrol the facilities as required Py the Police Department. sft -tuvn iAna for northbounA trrnffi'a on 2.3 Infrastructure Goals and Poljcies,CIeMdArind,Slreat as Well As A- nevrsi9nal�zcd Intiers ton -For We5t'bounA Nsnoy 2.3.1 Goal -Water System ekppmxrr%atoty rni*datay between HarbareQLAV:.0u -'d alro, Cieme $ tr act, berth of To provide service to the citizens of Anaheim in the form of adequate pressure, good quality and necessary quantities of water to meet both domestic and fire demands. 2.3.2 Policy Provide for the efficient and economic distribution of an adequate water supply and pressure to all residential, commercial, industrial and public areas served by the Municipal Water Distribution System. 2.3.3 Project Implementation fiMeMam - h - thG Ini Stu4j / The projects water requirements were studied as part of thelMitigated Negative Declaration and it was determined that the existing water main is adequate to serve the project. The City Water Division has indicated that there is adequate ground water storage to meet projected increases in average daily demand, while preserving the capacity warranted for entitled uses in the area at full build -out. Water conservation will be an important aspect of the plans to Implement the project, and will be achieved through the use of water conserving fixtures, drought tolerant landscaping and the use of reclaimed water for irrigation and other non - potable uses when available. 2.3.4 Goat - Electrical System To provide utility services adequate to enhance the health, safety and general welfare of present and future citizens of Anaheim. Page 6-46 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 2.3.5 Policy Serve electrical energy to all electrical consumers in Anaheim in a reliable and efficient manner which is consistent with good utility and business practices at rates which are equal to or lower than rates for comparable services in adjacent communities. 2.3.6 Project Implementation ddeMUMtb1t%- ,lvnitiAlstuai The project's electrical requirements were studied as part of the Mitigated Negative Declaration, and it was determined that there is adequate electrical capacity to serve the Pointe Anaheim project. 2.3,7 Policy Encourage and provide for the installation of electrical lines and cables and underground facilities in a manner which enhances the aesthetic appearance of the community. 2.3.8 Project Implementation All power lines and cables constructed to serve the project will be installed underground or in locations thatwill not be visible to the general public, thereby preserving the aesthetic appearance of the community. 2.3.9 Policy Operate and maintain City street lighting facilities for the safety and control of pedestrian and vehicular traffic. 2.3.10 Project Implementation Lighting will be provided for all parking areas, sidewalks and pedestrian plazas within the project. 2.3.11 Goal - Sanitary sewer system To provide adequately sized collector sewers to serve new developments in the City. 2.3.12 Policy Monitor the existing sewer systems for impacts caused by changes in land use and living patterns and provide additional sewer capacity where necessary. 2.3.13 Project implementation AM&lAum - the InlYA-1 The project's sanitary sewer requirements were studied as part of the Mitigated Negative Declaration. Required mitigation measures, will ensure adequate sewer capacity to serve the project, and will preserve the capacity for the entitled build -out of the balance of the Anaheim Resort and The Disneyland Resort areas. 2.3.14 Goal - Storm Drain System To provide a quality service which will adequately protect and enhance the health, safety and general welfare of the present and future citizens of the City of Anaheim. SivA Page 6-47 The Disneyland Resort Specific Plan Section 6.0 General Plan Consistency Pointe Anaheim OVeriay 2.3.15 Policy Provide a storm drainage system which will prevent devastating flood damage and adequately dispose of rainfall and subsequent runoff from a ten -year frequency storm. 2.3.16 Project Implementation Add&Ylum ta lrlih'Ai Study The project's impact on storm drainage was studied as part of the Mitigated Negative Declaration and will be mitigated through the required mitigation easures. 3. Circulation Element This section describes the portions of the Circulation Element that apply to the Pointe Anaheim Overlay. 3A Goals and Policies Provide a system of traffic ways which is related to the ultimate need for moving people and goods, and which will enhance the appearance and quality of the residential and commercial areas through which they travel. Provide a balanced transportation system which establishes mobility for all ages, efficient and economic movement, compatibility with the environment, and recognizes all available modes of transportation, including yet not limited to the automobile, mass transit and facilities to accommodate pedestrians, equestrians and bicycles. 3.1.1 Policy Classify all streets and highways in accordance with their function and the nature of the area which they are intended to serve. The system of arterial highways will be related to the Orange County Master Plan of Arterial Highways, and to the plans of adjacent cities. 3.1.2 Project Implementation r CYS raviseA Vransportation study was conducted in c prepared for the Pointe Anaheim Overlay. fiddendum to -the lnitW Study/ - tYttflSQoY'tiliton Iju tion with the Mitigated Negative Declaration rheluaffie study included an analysis of the> -- I This study included an evaluation of all of the intersections In the area that would potentially be affected by the project, and these results were compared to the existing tragic model for the area assuming full build -out. Any intersections that were found to operate at a lower Level of Service (LOS) than LOS "E" before mitigation will be improved through mitigation measures to a level of impact that is less than significant. In a number of instances, the mitigation measures that will be completed as part of the project is forecast to result in the LOS at intersections in the Anaheim Resort area actually improving compared to the baseline forecasts. 3.1.3 Policy Design access onto major arterial streets in an orderly and controlled manner. Restrict heavy traffic from entering the immediate vicinity of schools and other institutions because of noise and safety factors. }otal tvip6 9e n�at cd J;ytfit Tbk'nre Avwheo'm prc'ect• compared it fate pr�vioustygQprcvec� pr iie And„ texmirt.ed I tat"r, mctili fi'ect Prbjeet would aereX'Are less total - ales JjA -tire prev;cusly approvea pyQjeer, Page 6-48 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 3.1.4 Project implementation Dedicated right turn pockets will be constructed at each of the project's driveways on Disney Way, and Katelia Avenue. These turn pockets will move automobiles con ve rient off of the perimeter arterial streets and into the project drives and parking facilit cmcr t- nG 3tY'eet One of the beneficial attributes of the design of the project's parking facility is that it will allow ingress from and egress to all four of the perimeter street This design will allow the operator to use directional signage controls and restricted anes on the interior of the garage to direct visitors to the exit serving the street that will resul in the lowest impact on baseline traffic in the area, particularly during peak hours. 3.1.5 Policy Ai Nil bU1�G{DU� Provide for the development of new transportation systems and modes. 3.1.6 . Project Implementation Mass transit will be utilized in a number of ways within the project in order to minimize automobile traffic on local streets and to move large numbers of people between the project and other Specific Plan areas. The project will participate in, and connect with, various tour bus and transportation system operators in the area, as well as shuttle buses tolfrom the nearby hotels. An external system will connect the Specific Plan area to surrounding uses in the Anaheim Resort and other parts of northern Orange County, including van shuttles to hot Is and private and public buses. The transportation study that was conducted as part of the Mitigated Negative Declaration noted that the transit mode split assumed in the analysis of tpe project's likely impacts could be significantly higher than assumed in the forecasts if! en the Urban Rail project is developed in the Anaheim Resort and to the extent the lac Gon of a station on the Centert_ine is within walking distance of the project. AAdEnduft i Initial Study! 3.1.7 Policy A system of bicycle, pedestrian, hiking and equestrian trails will be established which may be utilized for recreation as well as transportation uses. 3.1.8 Project Implementation An extensive pedestrian circulation system will be constructed as part of the project, including plazas, sidewalks and parkways designed for pedestrians. 3.1.9 Policy Redevelop existing circulation facilities to meet present and future demand. 31.10 Project Implementation Significant new facilities for access to Interstate 5 from Disney Way, Katella Avenue and Harbor Boulevard are currently under construction, and substantial improvements to existing local streets will be made to enhance the overall vehicular circulation in the Specific Plan area. Improvements are also being made to a number of nearby arterial streets, including: Harbor Boulevard, Katella Avenue, Freetlmaci Way, Clementine Street and Manchester Avenue. D7 5vley Page 6-49 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay In addition to W e improvements, as part of its transportation mitigation measures, the t a re, weierwiizM biter cacti'onon15 isneyvtdy, appt,,,t,'r,tata►y W4 way LI&W45en 4. Environmental Resource and Management Element tt0.rbor8outevarA An& CILmGntineStrGei ServCr\9 v+CStloaw ^d Vehicles or DiSrus/ y wishing th turn Goal and Policies 2 itltt th" ec Q5 we-it Q5 'tYa ff l'G ex % li'n,. the. pI OJGCt Qn L�ItShl fkt It - turn W preJ 4t - toward itayNrbotlevarA. Provide a full range of parks and recreational facilities and programs which are accessible to all residents. 4.2.1 Policy Enhance the value of the City's Commercial Recreation Area and privately operated recreational facilities as a viable and valuable asset to the City's growing recreational and leisure needs. 4.2.2 Project Implementation The Specific Plan's objectives include the transformalion of the Specific Plan area from a primarily day -use area into a fully- integrated destination resort, and the enhancement of the Anaheim Resort through the provision of a wider range of attractions, hotel accommodations, rootouronto, ohopping opportunitico and publio op0000 in addition to tho Diancy thome parka.. Development of the project will contribute postvely to the City's supply of retail, dining, entertainment and hotel facilities and will enhance the value of the Anaheim Resort. The project will include extensive landscaped interior courtyard areas. 5. Safety and Seismic Safety Element This section describes the portions of the Safety and Seismic Safety Element of the General Plan that apply to the Pointe Anaheim Overlay. 5.1 Primary Safety Goal To provide for the preservation of life and property by ensuring the most effective and economical use of all resources. 5.2 Goal - Fire Prevention Ensure the availability of adequate supplies of water and water pressure for sufficient fire flows. 5.2.1 Policy Upgrade all water facilities as needed 5.2.2 Project Implementation According to the Anaheim Fire Department, no improvements to the water system are required to maintain required water supply and pressure for fire fighting purposes for the Pointe Anaheim project. Adequate on -site private fire hydrants will be provided. The precise number, types and locations of the hydrants will be determined during Final Site Plan review. Page 6-50 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 5.2.3 Policy Evaluate development proposals to ensure adequate water supply. s2.4 Projectlmptem "mitthe I As part of Pointe Anaheim Mitigated Negative Declaration, the peak demand for water was evaluated. The project wi I pay its fair share of improvements required to the water system. 5.3 Goal • Geologic Hazard Minimize the risk to life and property through the identification of hazardous areas, establishment of proper design criteria and provision for public information. 5.3.1 Policy Mitigate potential disaster through land use and development standards. 5.3.2 Project Implementation The environmental review conducted for The Disneyland Resort Speck Plan area examined seismic hazards and did not identify any faults or other serious geologic hazards within the Specific Plan area, including property included in the Pointe Anaheim Overlay. Ali physical improvements in the project will conform to City Building Codes in order to minimize potential hazards. 5.4 Goal - Flood Hazard Minimize the risk to life and property through identification of flood hazard areas. 5.4.1 Policy Review and evaluate all development proposals located in areas which are subject to flooding. 5.4.2 Project Implementation The Disneyland Resort Specific Plan area, including the property within the Pointe Anaheim Overlay, is outside the 100 -year flood plain so the impacts associated with potential flooding during a 100 -year storm event is low. 5.5 Goal - Disasters Minimize the risk to life and property through disaster preparedness and public awareness. 5.5.1 Policy Provide for streets to be used as the major source of evacuation. 5.5.2 Project Implementation Major arterial streets in the Anaheim Resort area are being widened and otherwise improved, which will Increase their efficiency and capacity for use in evacuation. Page 6-51 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay (parking garage, hotel towers or retail stores) on all sides, and will not exceed the City of Anaheim Noise Ordinances. 7.1.3 Policy Standards to regulate noise from construction activities shall be expanded and enforced Particular emphasis shall be placed on the restriction of the hours which other than emergency work may occur. 7.1.4 Project Implementation Construction activities will comply with the City of Anaheim Sound Pressure level Ordinance which restricts noise levels from construction activities between 7 p.m. and 7 a.m. All construction equipment shall be equipped with properly operating and maintained mufflers. 7.1.5 Policy Sound amplification equipment shall not be used within public spaces, in proximity to noise sensitive areas and /or on streets and highways within the City during the late night and early morning hours. 7.1.6 Implementation No sound amplification equipment will be used on public rights -of -way or in close proximity to noise sensitive areas. Any noise generated by sound equipment shall be in compliance with the City of Anaheim Noise Ordinances, 7.1.7 Policy The noise produced by power tools, lawn mowers, power edgers etc. shall not intrude upon adjacent residential spaces during the late evening, night and early morning hours. 7.1.8 Project implementation None of the property within the Pointe Anaheim Overlay is adjacent to residential uses. Notwithstanding, it is not anticipated that these types of power tools will be operated during the late evening, night and early morning hours due to the number of hotel rooms within the project and located on adjacent properties. Any noise generated by the project shall be in compliance with the City of Anaheim Noise Ordinances. 7.1.11 Policy Employment of noise mitigation measures in the design of all future streets and highways and establishment of buffers between the arterials and adjoining noise sensitive areas. 7.1.12 Project Implementation The Pointe Anaheim Overlay includes provisions for landscaped buffers adjacent to Katella Avenue, Harbor Boulevard, Disney Way and Freedmen- ". 7.1.13 Policy Clementine S-rree-r Where appropriate, sound walls, berms and landscaping along existing and future highways and railroad rights -of -way, to beautify the landscape and reduce noise shall be required. Page 6 -53 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.1.7 Project Implementation , Plans for the Pointe Anaheim project include open space areas, and retail and entertainment facilities that will be available to workers within the surrounding area as well as tourists and /or visitors. The project Improvements are organized along an interior landscaped pedestrian walkway linking Harbor Boulevard to Katella Avenue, and a lushly landscaped central plaza area, both of which are designed to encourage utilization by pedestrians in a park -like setting. Attractively landscaped entry plazas are anticipated at Harbor Boulevard, Katella Avenue and along Disney Way. All of these areas will be open to the general public without an entry fee. 8.1.8 Policy Address the City's balanced land use mix in conjunction with the review of any General Plan Amendment application that would increase housing and /or employment opportunities. 8.1.9 Project Implementation The Pointe Anaheim Overlay implements the Commercial Recreation General Plan designation thus implementing the balanced land use mix of the General Plan. The Economic Development Strategic Plan adopted in 1990 has identified the Anaheim Resort, including The Disneyland Resort Specific Plan area of which the Pointe Anaheim Overlay is a part, as a priority growth area. This project will account for employment of approximately r23V-people once all of the anticipated uses are open. 3,227 8.1.10 Goal Strive to establish development priorities citywide. 8.1.11 Policy Identity and encourage development of vacant and under - utilized lands where services are available or can be accommodated. 8.1.12 Project Implementation The Economic Development Strategic Plan adopted in 1990, has identified the Anaheim Resort, including the Pointe Anaheim Overlay area, as a priority growth area for the economic development of the City. The Pointe Anaheim Overlay area includes vacant and under - utilized parcels, including several non - conforming industrial buildings, that will be developed with the implementation of the project. 8.1.13 Polity Employ strategies within urban growth boundaries, such as public infrastructure investment, to promote in -fill and rehabilitation of existing properties and to foster permitted development consistent with the protection of quality of life within existing communities. 8.1.14 Project Implementation The primary planning concept for the Pointe Anaheim project is to extend the available shopping, dining, lodging and entertainment opportunities for visitors to the Anaheim Resort and enhance the area's overall appeal as an urban destination resort. This will promote the in -fill and rehabilitation of properties with revenue generating uses while protecting the 'quality of life' experienced by the community. Page 6 -55 The Disneyland Resort Specific Plan Section 6.0; General Plan Consistency Pointe Anaheim Overlay 8.1.15 Goal Develop land use strategies/incentives to reduce the amount of vehicle miles traveled. 8.1.16 Policy Encourage new pedestrian oriented development that provides a range of services and amenities to reduce auto use during non - commute times. 8.1.17 Project Implementation The Pointe Anaheim project includes a variety of uses in one location connected by an inviting, integrated pedestrian environment including landscaped promenades, plazas and gardens connecting the parking facilities, hotels and retail, dining and entertainment uses. The project is located within walking distance of the Disneyland Theme Park, the Anaheim Convention Center and a number of hotel rooms and commercial uses. The project's design and its proximity to nearby uses will allow visitors to reduce their auto use. Drop -off areas ptanned,along Harbor Boulevard, Katella Avenue and Disney Way, together with a bus terminal located in the garage under the project, will additionally allow visitors, arriving by bus or shuttle, easy access to the project. 8.1.18 Policy Support the development of diverse types of public and private transit services within urban areas to facilitate travel, particularly the home -to -work commute. 8.1.19 Project Implementation The Disneyland Resort Specific Plan provides for several mass transit systems that will work together to minimize automobile traffic. The mass transit systems include: a pedestrian or transportation system, monorail, and conveniently located drop -off areas. The Pointe Anaheim project will endeavor to tie into as many of these systems as possible. The project will participate in the Anaheim Transportation Network and its design includes drop -off areas a ong a eas" ide- of- Harbor-6oui��de- OLKatsAa- Aveaae- endtwe- errlhe— serrtk E)isney- Vjett,4or van shuttles, private buses and the public bus system. in addition, a Transportation Demand Management (TOM) program will be implemented to reduce the average vehicle trip (VT) and vehicle miles traveled (VMT) for the employees. 8.1.20 Policy Encourage new development to provide commercial support opportunities for employment centers such as locating restaurants near andlor in employment centers or providing shuttle service to shopping areas. 8.1.21 Project Implementation An important objective of the Pointe Anaheim project is to supply the visitor facilities that will be needed to meet the long -term demand for retail shopping, restaurant and entertainment activities. Many of these same visitor- serving facilities can also be utilized by employees of the entire Anaheim Resort, - - — n0'i th Side o f KAtellu, Avenue Auri fGle ini tl'al hose; as we'll Q5 planned Arbp off Areas on the aatn 51aC o f Disnay Way AnA, thz oast qld& of ttArbarBoaleArLA -for UVhcn the pot^tt'oA5 0f the. Pre'ye'd that A4A ye, 9s - thc5e 5tree.f fwntA5e Ove, 6ub IattIt.ThcSc Are'Q-o{f will, se/ve Page 6-56 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.2 Growth Management Goals and Policies for Community services and Facilities 8.2.1 Police - Goal To adequately assess the impacts of proposed development and /or intensification of existing land uses and strive to achieve a goal of 1.45 to 1.7 sworn officers per thousand population, an emergency response time of 3 minutes and a non - emergency response time of 20 minutes. 8.2.2 Policy Provide mandatory review of all new discretionary actions prior to their approval to ensure that impacts to the Police Department are identified and appropriate mitigation measures /conditions of approval are incorporated, including phasing of the mitigation measure /condition. v t A ! .I 8.2.3 Project Implementation " / �� t � '"'x e ^ `^tt8'1 ro I n V41 `S N The Disneyland Resort Specific Plan Public Facilities Plan Section, in conryunction With The Disneyland Resort Environmental Impact Report and the Pointe Anaheim)jvlitigated Negative Declaration, discusses impacts the Pointe Anaheim project will have on the Police Department. The recommended mitigation measures and project design features, such as providing convenient access to parking areas from Interstate 5 and providing pedestrian crossing guards for the comer of Harbor Boulevard and Disney Way during ak operating periods (which reduce the need for traffic police support), are identified in the Mitigated Negative Declaration. In addition, the project will make permanent space av ilable on -site for an Anaheim Police Department substation at no cost to the City. 8.2.4 Goal - Fire MA&VAUr4 ra the lnittalStu To adequately assess the impacts of proposed development and /or intensification of existing land uses toward achieving a goal of: • providing a maximum five minute engine company response to 90% of all incidents and a maximum 8 minute response to the remaining 10% of ail incidents for both fire and paramedic service. - providing a maximum 10 minute truck company response to 90% of all incidents for both fire and paramedic service. - providing a minimum 15 minute truck company response to 90% of all hazardous material emergencies, and a 30 minute response to the remaining 10% of all incidents. 8.2.5 Policy Review all new discretionary and non - discretionary actions prior to their approval to ensure that impacts to the Fire Department are identified and appropriate mitigation measures /conditions of approval are incorporated. 8.2.6 Project implementation AAA endum totA4 I n; h St' The Disneyland Resort Specific Plan Public Facilities Pla Section, in conjunction with The Disneyland Resort Environmental Impact Report and in Mitigated Negative Declaration, discusses impacts the Pointe Anaheim project will hav f n the Fire Department. The recommended mitigation measures are identified in thigated Negative Declaration. / dGl& MUM it the I n l fiA Siud Page 6 -57 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.2.7 Goal - Schools Assist the School Districts in their long -range planning efforts by facilitating their review of planning and development proposals including General Plan Amendments, zoning reclassifications, annexations and redevelopment proposals serving the planning area and to cooperate with the school district in their planning to provide school facilities to meet the needs of the community in a timely manner. 8.2.8 Policy Continue the practice of levying school impact fees on development as prescribed by AS 2926. 8.2.9 Project Implementation Development pursuant to The Disneyland Resort Specific Plan, including the Pointe Anaheim Overlay, is subject to a school impact fee as discussed in thelivlitigated Negative Declaration. A ' - On Um ti thm IniAl 6 8.3 Growth Management Goals and Policies for grastructure 8.3.1 Goal -Water To adequately assess the Impacts of proposed development and/or intensification of existing land uses and propose mitigation measures to assure adequate levels of service and infrastructure are provided. 8.3.2 Policy Continue to review plans and permits to assure that developments provide their fair share of water service and costs to serve their projects. 8.3.3 Project Implementation h4krdulntotfteini A4 Study/ The projected i act of the Pointe Anaheim Overlay on the City's water system supply is addressed in the itigated Negative Declaration. This study concluded that an adequate supply of water exists to support development of the project without adversely affecting the full build -out of the remainder of the Resort area. The project will pay its fair share of impact fees which address the cost of the related water infrastructure. 8.3.4 Policy Incorporate aesthetic considerations into the design of new water facilities such as the screening of water storage facilities and pumping stations. 8.3.5 Project Implementation Any new water facilities will be screened according to the provisions of Section 5.0, 'Design Plan', of The Disneyland Resort Specific Plan. 8.3.6 Goal To assure that water sources remain pure, that there is ample supply and distribution through more efficient use of water storage conservation, use of reclaimed water and acquisition of additional facilities. Page 6 -58 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.3.7 Policy Implement water conservation programs and techniques in accordance with the Best Management Practices MOU to reduce the use of water to the most effective extent possible. 8.3.8 Project Implementation ` 1 � ` Water conservation will be an important part of the Pointe Ana Im project and will be achieved through numerous measures intended to reduce wate consumption. In addition, adequate water lines will be installed so that reclaimed water m y be used for landscape irrigation and other purposes, if and when it becomes available, a list of mitigation measures set forth in the�vlitigated Negative Declaration includes some of the water conservation measures I at will be implemented within the Pointe Anaheim Overlay. 8.3.9 Policy AM&e trn t fl>G lni }'IAi Study/ Develop techniques to increase water storage and capture such as capturing rain run -off and util'wng reclaimed water where appropriate. 8.3.10 Project Implementation Adequate water tines will be installed so that reclaimed water may be used for landscape irrigation and other purposes, if and when it becomes available. 8.3.11 Goal - Electrical To adequately assess the impacts of proposed development and/or intensification of existing land uses and propose mitigation measures to assure that adequate levels of service and infrastructure are provided. 8.3.12 Policy Continue to review plans and permits to assure that developments provide their fair share of electrical requirements to serve their projects and implement conservation measures. 8.313 Project Implementation } MzM umtbti, lni h'41Stuzi The Disneyland Resort Specific Plan Public Facilities Pla� Section, in conjunction with The Disneyland Resort Environmental Impact Report and the Mitigated Negative Declaration for the Pointe Anaheim Overlay, discusses impacts the project will have on the electrical facilities and include mitigation measures addressing said impacts. 8.3.14 Policy Implement the undergrounding conversion program. 8.3.15 Project Implementation All electrical lines and cables within the Pointe Anaheim project will be located within a structure, undergrounded, or above ground and extensively screened with landscape so that they are not visible to the general public. Page 6-59 Insert E (page 3 -29) The Pointe Anaheim Overlay project will be an integrated djdvelopment which will be phased over time. Construction activity of project buildout yh'll progress over five areas of the project, with two alternatives for Area A and Area B The first phase is projected to open in mid -2004 and is planned to include those porjions of Area A that, depending on market conditions and other circumstances, can realistically be commenced in mid- to late -2002. The Initial Phase would likely include approximately 120,000 square feet of RDE and other commercial uses in Area A -1, or approximately 300,000 square feet of RDE in Area A -2 if the aquarium lease is consummated prior to issuance of building permits. Given the present market conditions, it is -likely that development of hotel rooms will be deferred. However, the portion of the P,(oject Site where the hotel in Area A is planned will be improved in the Initial Phase sd that hotel rooms can be added as soon as market conditions permit. The intent is S� begin on the next phase of construction within approximately one year of the opening of the previous phase of development; however, the timing of the phasing will depend primarily on market demand at the time and the availability of project financing. / Insert F (page 6 -45) Additional proposed uses requiringg' Code amendments include the proposed aquarium and Vacation Ownership Resort ?,nits. Code amendments would also be required to conditionally permit murals and directional signs for the project and to delete the landscaping along the interior b¢undaries of the project site. Insert G (page 6 -59) The Addendum to the Initial Study /Mitigated Negative Declaration determined that the modified project would demand less water than the previously approved project, even with the proposed aquarium. Insert H (page 8 -20) 8.7.5 Amendment No. 5 Amendment No. 5 to The Disneyland Resort Specific Plan No. 92 -1 related to the Pointe Anaheim Overlay allows the development ofrlhe Pointe Anaheim Lifestyle Retail and Entertainment Complex as an integrated development to be constructed in up to five phases over a period of time. Insert I (page 7 -42) (3) For the Pointe Anaheim Overlay,, / o ff -site and on -site directional signage may be included as part of the overall Coordinated Sign Program if considered and approved as a part of the Final Site Plan or as amended. The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.3.16 Goal -Sanitary Sewer System To adequately assess the impacts of proposed development and /or intensification of existing land uses and propose mitigation measures to assure that adequate levels of service and infrastructure are provided. 8.3.17 Policy Continue to review plans and permits to assure that developments provide their fair share of sanitary sewer system requirements to serve their projects. Require capacity studies be performed by the developer /applicant if deemed necessary by the Public Works /Engineering Department. �t t 8.3.18 Project Implementation AMeru t tm it �vll I � S ruay f The Disneyland Resort Specific Plan Public Facilities Plan Section, In conjunction with The Disneyland Resort Environmental Impact Report and Mitigated Negative Declaration for the Pointe Anaheim project, discusses impacts the Poin a Anaheim project will have on the sanitary sewer system. The recommended mitigation measures ensure sufficient sewer capacity is available both for the pro ct and the full build -out of balance of the Resort area. These measures are identified in the itigated Negative Declaration. 9.3.18 Policy it the in study/ Continue to collect and implement sewer assessment area fees as appropriate, 8.3.20 Project Implementation The Pointe Anaheim project will pay its proportionate share of fees for sewer system improvements. 8.3.21 Goal - Storm Drain System , To adequately assess the impacts of proposed development andlor intensification of existing land uses and propose mitigation measures to assure that adequate levels of service and infrastructure are provided. 8.3.22 Policy Continue to review plans and permits to assure that developments provide their fair share of storm drain requirements to serve their projects, 8.3.23 Project implementation AA,44 Ltmto-iz 111"Hai srtudyl The Disneyland Resort Specific Plan Public Facilities PI Section, in conjunction with The Disneyland Resort Environmental Impact Report and the es Mitigated Negative Declaration for the Pointe Anaheim Overlay, discuss impacts the Poin a Anaheim project will h ve on the storm drain facilities. The recommended mitigation measures are identified in the Mitigated Negative Declaration. 1 8.3.24 Goal - Flood Control ' `r ""� lnthAl StuAy� To adequately assess the impacts of proposed development and /or intensification of existing land uses and propose mitigation measures to assure that adequate levels of service are provided. Page 6-60 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.3.25 Policy Implement the recommendations in the Master Plan for Drainage. 8.3.26 Project implementation The recommended mitigajon measures for storm drainage and compliance with the Master Plan are discussed in theTMitigated Negative Declaration. 1 8.3.27 Policy WaAum 1bbte. St Continue to review plans and permits to assure that developments provide their fair share of flood control requirements. 8.3.28 Project Implementation AdAerd+ -ro In�-Ka ma The Disneyland Resort Specific Plan Public Facilities Plate Section, in conjunction with The Disneyland Resort Environmental Impact Report and th Mitigated Negative Declaration for the Pointe Anaheim Overlay, discusses impacts the project will have on the flood control facilities. The recommended mitigation measures are identified in the Mitigated Negative Declaration. {mendum to t+te !ni Hal Study/ 8.4 Growth Management Goals and Policies for Circulation 8.4.1 Goal To reduce traffic congestion on the City of Anaheim controlled arterial highway system. 8.4.2 Policy Continue to implement the Critical intersection Proggraam." '� 8.4.3 Project Implementation WeMam t'fl �w>t iict.l. Study The Transportation Study conducted in conjunction with thAlMitigated Negative Declaration for the Pointe Anaheim project recommends a variety of traffic mitigation measures, including the widening of the intersections of Disney Way and 44aadA%vt -VLey in order to provide for dual left turn lanes. h ne S IYGG 1 8.4.4 Policy Continue to promote traffic reduction strategies through incentives and site design criteria such as bicycle usage, carpools, pedestrian circulation and other TDM measures. 8.4.5 Project Implementation The Pointe Anaheim project will implement and monitor a comprehensive Transportation Demand Management (TDM) program for all employees which will include at a minimum: carpooling, vanpooling, transit passes, commuter busses, shuttle service, bicycling, rental car fleet, a guaranteed ride home program, work schedule adjustments and wort: facility management. Other measures to achieve trip reductions and other TDM programs objectives will also be explored. 8.4.6 Policy Use the City-wide transportation model to develop improvement phasing'plans. Page 6-61 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.4.7 Project Implementati n addendum -roue Ini Hal Study/ The traffic study prepared for thelMitigated Negative Declaration for the Pointe Anaheim Overlay was prepared in conjunction with the citywide transportation model. 8.4.8 Policy Continue to maintain consistency between the City's and County's Master Plan of Arterial Highways. 8.4.9 Project Implementation The Circulation Plan for the Pointe Anaheim Overlay is consistent with the Citys General Plan Circulation Element. 8.4.10 Policy Promote and implement public transportation and alternative modes of transportation such as increasing access to public transit through land use design (locating higher unit residential projects near transportation corridors), provide direct and convenient pedestrian access from the interior of development to public transit stops, development and promotion of bicycle trails, encouraging pedestrian friendly developments, support development of High Occupancy Vehicle (HOV) lanes, etc. 8.4.11 Project Implementation An essential part of The Disneyland Resort Specific Plan is to promote improvement to the transportation system so that access to the Resort will be convenient and pleasant. The Specific Plan provides a combination of enhancing access routes to and from Interstate 5, local roadway Improvements and new parking facilities, The Specific Plan provides for several mass transit systems that will work together to minimize automobile traffic. These mass transit systems include: pedestrian and/or transportation system(s), monorail, and conveniently - located drop -off areas for van shuttles, private buses and the public bus system. The Pointe Anaheim project will endeavor to tie into as many of these systems as possible. The project will participate in the Anaheim Transportation Network and its design which Aveaue-and4woort-the -soutb4' van shuttles, private buses and the 16 public bus system. Further, proposed within the project is a bus terminal /facility and bus parking spaces. in addition, the project includes a variety of uses in one location connected by an inviting, integrated pedestrian environment consisting of landscaped promenades and plazas connecting the parking facilities, hotels, retail, dining and entertainment uses. This pedestrian oriented environment, together with the fact that the project Is located within walking distance of the Disney Theme Parks, the Anaheim Convention Center and thousands of hotel rooms and other commercial uses along Harbor Boulevard, will allow visitors to reduce their auto use during the day. 8.4.12 Policy • Prier to the issuance of building permits for new developments forecast to generate 100 or more peak hour (morning or evening) trip ends, traffic impact analyses are to be completed to identify arterial and intersection Improvements needed to provide not worse than LOSE" along Interstates, State Routes and Super - streets (unless current operation is LOST'), and not worse than LOS "D" along the balance of the arterlals on the City's Circulation Element that are measurabl impacted by the new develop ent and are under the City's jurisdiction. ht rt4� 9iA , 0f Katella,A \ItAUt Ckurinqq * -w,e initial prase; a5 well as Page 6-62 Planned Amf -e� oxea5 on the Scut i Ar, q Disney Way a n&the- eA,SYSiAe o f ttarbt+^�atlevarA For vfhdA th,r, POrhony 0� thr, Qv�ec-� -11nat addrrhs - mast. street fron ti7l�GS arG ��Y b lt-. 'TIn6S -e dlrop- o ar das WM s,✓ yve' VU The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay • Developments that are under the Citys jurisdiction are required to provide improvements or provide funding for needed improvements to provide not worse than the above- referenced LOS with existing plus development traffic. Large -scale development projects in the City may involve complex coordination between the different phases of development of the project and the phasing of the necessary improvements to roadway capacities needed for the project. Thus, new large -scale development projects in the City shall be required to establish an approved development phasing program ('Phasing Program') which phases development of the project commensurate with the required improvements to roadway capacities. The Phasing Program shall include an overall build -out plan which can demonstrate the ability of the infrastructure to support the planned development and financing mechanisms to fund the improvements, with the developer paying its fair share of the costs of the improvements. Projects which are not subject to the Phasing Program shall implement improvements within three years of building permit issuance or up to five years from first grading permit for each approved phase of the project; with bonding to ensure the developer's fair share participation. Intersections exempt (intersections that can have an unacceptable LOS) from the above paragraph include facilities under the jurisdiction of another City or the Stale or those included on the Deficient Intersection List established pursuant to this Element (this Deficient Intersection List is determined by members of the Inter - Jurisdictional Planning Forums). Deficient intersections are those intersections that are not brought Into compliance in the most current CIP for reasons beyond the control of the local jurisdiction (i.e., intersections such as those involving ramps leading to or from the freeways). The intersections identified on Figure 2 of the Growth Management Element are under the control of another City, the County or State; therefore, the City of Anaheim is not held responsible for bringing these intersections to an acceptable LOS. Locations outside of the City's jurisdiction shall be discussed through the Growth Management Area Inter - Jurisdictional Planning Forums to effect mutually satisfactory mitigation of traffic impacts forecast with individual development. 8.4.13 Project Imple KA entation CM to tisG tMI( Ai SitAy Section 4.0, 'Public Facilities Plan; in conjunction with The Disneyland Resort Environmental Impact Report and the ^ Mitigated Negative Declaration prepared for the Pointe Anaheim Overlay, discusses impacts The Disneyland Resort will have on the Circulation System. The recommended mitigation measures to achieve the required LOS, such as new signalized intersections, increases in the number of dedicated turning lanes, upgrades to the traffic controller system and pedestrian control guards at peak periods of operation, are identified in the Mitigated Negative Declaration. The transportation study conducted in conjunction with the Pointe Anaheim IMitigated Negative Declaration demonstrates that the effect of these im ovements will b to either maintain or improve the LOS at each of the intersections Stu ied. �dGl2ndt.umfio l>1ii;a1 Stay 8.4.4 Goal �,� A _r4um To adequately assess the impacts of proposed development andtor intensification of existing land uses and propose mitigation measures to provide adequate levels of service and infrastructure. 8.4.15 Policy Continue to review plans and permits to assure that developments provide their fair share of transportation feesfimprovements to mitigate their impact. 8.4.16 Project Implementation Page 6 -63 The Disneyland Resort Specific Plan Section 6 -0: General Plan Consistency Po inte Anaheim Overlay AmP,mum toiiw, In - HAI StWY/ -- - Section 4.0,'Public F JeNities Plan; in conjunction with The Disneyland Resort Environmental Impact Report and thitigated Negative Declaration for the Pointe Anaheim Overlay, discusses impacts th roject will have on the transportation system. The recommended mitigation measures which will assure the dev pmenrs share of transportation, feeslimprovements are met are identified in th Mitigate Declaration. 6.4.17 Policy {}� I Awl -K fly, Ini Ifctl StvdY1 Require that all new development shall pay its share of the transportation improvement costs associated with that development, including traffic mitigation affecting neighboring cities through the Inter - Jurisdictional Planning Forum process. 8.4.18 Project Implementation i {}LIGI2ftilum (nitla.l Section 4.0, 'Public Fa iiities Plan; in conjunction with The Disneyland Resort Environmental Impact Report and the Mitigated Negative Declaration for the Pointe Anaheim Overlay, discusses impacts the project will have on the transportation system. Project design features and mitigation measures to assure the project's share of transportation improvement costs are met, are identified in the Mitigated Negative Declaration. 8.4.19 Policy L Addendum it tlh In�h'al Stttdy� That the City of Anaheim shall collect a transportation improvement fee for improvements within its boundaries and work with other jurisdictions through Inter - Jurisdictional Planning Forums to determine minimally acceptable impact fee levels for application within the GMAs. 6.4.20 Projection implementation tt--/}( {Yt Al, 1G - Ibtltti�tQ�StLtG1�l Section 4.0,'Public Facilities Plan; in conjunction with The Disneyland Resort Environmental Impact Report and the ,Mitigated Negative Declaration for the Pointe Anaheim Overlay, discusses impacts the project will have on the circulation system. The project's share as a percentage of total traffic growth at each intersection has been identified. The developer will mitigate the impacts of the project on the transportation infr structure system through implementation of the mitigation measures identified in thLrUtigated Negative Declaration. 5.4.21 Policy !j/ eniart) to i 1` t&LSWY/ That development shall be phased and phasing programs for specific large scale projects shall be approved in accordance with any applicable Comprehensive Phasing Program (CPP) adopted by the City. CPPs shall include development phasing plans which establish both a phasing allocation of development commensurate with roadway capacities and an overall build -out development plan which can be supported by implementation of the planned circulation system. 8.4.22 Projectlmplementation p}1Aged,overtimawithin eF- ty>�prt�ject -Alf ofgie uses within the Pointe Anaheim project will b . The transportation study conducted as part of the Pointe Anaheim project discussed the impacts the system. The project's share as a percentage of total tr been identified. The developer will mitigate the impact infrastructure system by implementatio the mill atf Negative Declaration. 1 1 A Mitigated Negative Declaration for lect will have on the circulation growth at each intersection has the project on the transpo ation neasures identified in the itigated 11e lnitictl StmY/ A&IzAAa bft (niKALf,S"'A d Page 6 -64 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.4.23 Policy All new development shall pay its fair share of the costs associated with cumulatively needed traffic improvements /programs. This shall be accomplished with collection of a Citywide transportation improvement fee that meets or exceeds the minimally acceptable fee levels identified through the Growth Management Area Inter - Jurisdictional Planning Forums. New Measure M sales tax revenues shall not be used to replace private developer funding which has been committed for any project or normal subdivision obligations, and shall be applied towards maintenance and /or correction of existing LOS deficiencies. 8.4.24 Project Implementation /�Ada dUtn tattn�lni tial study The transportation study conducted as part of the m Negative Declaration for the Pointe Anaheim project discusses impacts the project will have on the transportation system. The recommended mitigation measures addressing the payment or construction of transportation improvements are Identified in theLMi' a ed Negative Declaration. U -it i IP6 W ha I Siudy/ 8.5 Growth Management Goals and Policies for Parks and Open Space 8.5.1 Goal To adequately assess the impact of proposed development and /or intensification of existing land uses and propose mitigation measures to assure that adequate levels of service are provided and that the goal of a minimum of two acres of parks per thousand population is required of new developments. 8.5.2 Policy Continue to review plans and permits to assure that developments provide their fair share contribution to park and/or facilities. 8.5.3 Project Implementation The conceptual architectural designs for the Pointe Anaheim project include over 5 acres of lushly landscaped and decoratively hardscaped pedestrian promenades e multi -level plazas These areas of the project, which will link the various retail, dining entertainment and hot I uses, will contribute to the day -time and evening recreation opportunities for the commu ity by being open to the general public without any admission fee. Air , outdoor 0ae . - 0,W_ tttV A,YGAy Qt full but 1A,-out a f t P 8.6 Growth Management Goals and Policies Y or Air Quality 8.6.1 Goal To adequately assess the impacts of proposed development and/or intensification of existing land uses and propose mitigation measures to assure that SCAQMD air quality standards are achieved, the greatest reduction possible in vehicle miles traveled is achieved, and that land uses are proportionately balanced. 8.6.2 Policy Continue to require all developments to comply with the requirements of the Air Quality Management Plan. Page 6 -65 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.6.3 Project Implementati n, MA vMum to the fntttal Study The Mitigated Negative Declaration prepared for the Pointe Anaheim Overlay discusses impacts the project may have on air quality compared to the assumption of the build -out of the entire site as hotel rooms at the maximum allowed density. This study determined that the project will not result in any greater air quality impacts than under the assumption of full build -out of the entire site as hotel rooms, and as previously analyzed in The Disneyland Resort Environmental Impact Report. Project design features and mitigation measures such as reducing the dependence on the private automobile for trips within the Resort area are identified in the previous Environmental Impact Report and demonstrate that the Specific Plan will comply with the AQMP (Air Quality Management Plan). In order to assure that the Pointe Anaheim project's impacts are no greater than previously assumed, all appropriate mitigation measur from The Disneyland Resort Environmental Impact Report have been incorporated in thetMitigated Negative Declaration for the Pointe Anaheim project. 8.6.4 Policy AAIc AUrn `thc Initt 5 - tudyl Continue to reduce the amount of vehicle miles traveled through the Implementation of transportation demand management (TDM) programs (the City recently adopted TOM Ordinance #5209) and other programs designed to promote trip reductions, increase vehicle occupancy ratio, etc. 8.6.5 Project Implementation The Pointe Anaheim project will implement and administer a comprehensive Transportation Demand Management (TDM) program for all employees. A menu of the TDM program strategies and elements for future employee commute options include, but are not limited to: carpooling, vanpooling, transit passes, commuter busses, shuttle service, bicycling, rental car fleet, guaranteed ride home program, work schedule adjustments and work facility management. Other measures to achieve trip reductions and other TDM program objectives will be explored, including the formation of a Pointe Anaheim Resort Transportation Management Association (TMA), or participation in a Disneyland TMA or an Anaheim Resort TMA, if available. 8.6.6 Policy Pursue methods to reduce vehicle miles traveled through non - regulatory and voluntary market -based Incentive efforts. 8.6.7 Project Implementation The Pointe Anaheim project will implement and administer a comprehensive Transportation Demand Management (TDM) program for all employees. A menu of the TOM program strategies and elements for future employee commute options include, but are not limited to: carpooling, vanpooling, transit passes, commuter busses, shuttle service, bicycling, rental car fleet, guaranteed ride home program, work schedule adjustments and work facility management. Other measures to achieve trip reductions and other TDM program objectives will be explored, including the formation of a Pointe Anaheim Resort Transportation Management Association (TMA), or participation in a Disneyland TMA or an Anaheim Resort TMA, if available. 8.6.8 Policy Strive to achieve compliance with applicable Federal and State standards for air quality. Page 6 -66 The Disneyland Resort Specific Plan Section 6.0: General Plan Consistency Pointe Anaheim Overlay 8.6.9 Project implement iWendumto tne` W-RAl Siw�y ThelMillgated Negative Declaration for the Po' to Anaheim Overlay discusses impacts the project will have on air quality. The Pointe Anaheim Project will implement a comprehensive TDM program for all employees, in addition, in order to assist in achieving the objectives established in The Disneyland Resort Environmental Impact Report for extending the average length of guest stay, Pointe Anaheim will participate in marketing programs which promote the Anaheim Resort as a mini - vacation site and that encourage the use of facilities within the Resort area rather than taking cars to destinations off -site. 9. Parks, Recreation and Community Services This section describes the portion of the Parks, Recreation and Community Services Element of the General Plan that apply to the Specific Plan. 9.1 Goal and Policies 1 Provide for sufficient indoor and outdoor park, recreation and community service opportunities throughout Anaheim to meet the needs of existing and future residents and workers. 9.1.1 Policy Encourage the development of park and community service facilities within areas of relatively high employment concentrations that will serve the needs both of local workers and nearby residents. 9.1.2 Project Implementation The Pointe Anaheim Overlay includes open space areas, and retail, dining and entertainment facilities that will be available to the general public including local workers and nearby residents. The conceptual architectural designs for the Pointe Anaheim project include lushly landscaped and decoratively hardscaped pedestrian promenades and multi -level plazas. These park -like areas of the project will link the various retail, dining, entertainment and hotel uses between Harbor Boulevard and Katella Avenue. In addition, they will contribute to the daytime and evening recreation opportunities for the community by being open to the public without any admission fee. 9.2 Goal and Policies 2 Maintain and improve Anaheim's overall visual appeal byway of continued development and maintenance of medians, parkways and street trees throughout the City. 9.2.1 Policy Develop, continuously maintain, and rehabilitate, when necessary, cost effective, aesthetically pleasing, and uniformly designed landscaped parkways and medians without compromising other park, recreation and community services programs. 9.22 Project Implementation One of the design concepts for The Disneyland Resort Specific Plan is to transform and unify the Resort with landscaping. The primary component of this transformation will be the streetscape, which will include trees and shrubs as well as man -made elements such as light Page 6-67 The Disneyland Resort Specific Plan Section 7.0: Zoning and Development Standards .030 Organization. In accordance with the provisions of Chapter 18.93 of the Anaheim Municipal Code entitled 'SPECIFIC PLANS," the standards herein are patterned after the zone districts and definitions contained in Title 18, "ZONING," of the Anaheim Municipal Code. 18.78.020 GENERAL PROVISIONS. .010 Compliance with Disneyland Resort Specific Plan Code. All uses and development in this Zone shall comply with any applicable provisions of the Code expressly referred to in this Chapter, including, unless specifically amended herein, the provisions of Chapters 18.01 entitled "DEFINITIONS - ZONING CODE" and 18.04 entitled "SITE DEVELOPMENT STANDARDS - GENERAL" of this Code; provided, however, that in the event of any conflict or inconsistency between any provision contained in any other Chapter of this Code and any provision contained in this Chapter, the provision contained in this Chapter shall govern and apply. All Engineering Standards referred to in this Chapter are on file in the Office of the City Engineer and are incorporated herein by reference as if fully set forth in this Chapter. Where the provisions of this Zone do not discuss a specific condition or situation which arises, the nonconflicting provisions of the Anaheim Municipal Code shall apply. .020 Disneyland Resort Design Plan. The site development standards set forth in Sections 18.78.050 through 18.78. 110 of this Chapter have been adopted to operate in conjunction with the Design Plan for The Disneyland Resort Specific Plan identified in Section 5.0 of the Specific Plan document (hereinafter referred to in this Chapter as the `Design Plan) approved by the City Council on June 29, 1993, as amended on April 12, 1994, (Amendment No. 1), June 20, 1995, (Amendment No. 2), October 22, 1996 Amendment No. 3; azA July 13, 1999, (Amendment No. 4)' as the same may be hereinafter amended in accordance with the Specific Plan amendm nt procedures set forth in Chapter 18.93 ntitled . "SPECIFIC PLANS" of the Anaheim Municipal Code. Said Disneyland Resort Design Plan is incorporated herein by this reference as if fully set forth in this Chapter. All development otherwise permitted by this Chapter shall comply with any applicable provisions of the Design Plan. .030 Compliance with City of Anaheim Codes. All grading and subdivision plans shall comply with all applicable regulations and be reviewed and processed in accordance with the procedures contained in Title 17 "LAND DEVELOPMENT AND RESOURCES" of the Anaheim Municipal Code. All construction shall comply with the provisions of the Uniform Building Code, as adopted by the City of Anaheim, and applicable sections of Title 15 "BUILDING AND HOUSING" of the Anaheim Municipal Code. Construction within any District may commence only after the Planning Director finds that the construction proposal is in substantial compliance with these regulations, applicable policies and guidelines of The Disneyland Resort Specific Plan. With the exception of exemptions provided in Section 18.78.040.0201(d), the issuance of building permits may only occur after Final Site Plan approval has been obtained from the City of Anaheim, subject to the procedures set forth in 18.78.040.020 entitled "FINAL SITE PLAN APPROVAL" of this Chapter. .040 District Boundaries. The Specific Plan area is divided into five land use Districts (the `Districts): Theme Park District, Parking District, Hotel District, Future Expansion District and District A. The Specific Plan area and District boundaries are identified on Exhibit 3.3b entitled `Development Plan' of the Specific Plan document. The project area legal description is provided in Section 9.0 of the Specific Plan document. Modifications to the configuration and size of the District boundaries may result from technical refinements and site conditions in the subdivision and /or Final Site Plan process, and may be modified in accordance with the procedures set forth in Section 18.78.040.020 entitled "FINAL SITE PLAN APPROVAL" of this Chapter, without _ q 2.00 1, (ArAemwewr Igo.0 Page 7 -2 The Disneyland Resort Specific Plan 4 i* Section 7.0: Zoning and Development Standards 'Final Site Plans') shall be processed in the following ways: .0201 Process for Approval (a) Planning Commission Report and Recommendation Item. Final Site Plans for the following types of plans shall be subject to the review and approval by the Planning Commission at a public meeting as a Report and Recommendation: (1) All development in the Hotel District with the exception of development subject to the standards and requirements set forth in Section 18.78. 100 entitled "C -R OVERLAY" of this Chapter. (2) Streetscape and landscape within the Theme Park District, Parking District and Future Expansion District Setback Realms, as described in the Design Plan. (3) Minor boundary and acreage variations not exceeding ten percent (10 %) of the larger parcel. (4) Final layout for the parking facility in the East Parking Area. (5) Final detailed layout of the Pointe *Anaheim Overlay Lifestyle Retail and Entertainment Complex designed in accordance with Conditional Use Permit No. 4078 approved in compliance with the Pointe *Anaheim Overlay requirements. Further provided that the Final Site Plan shall be in accordance with the requirements set forth in Section 18-78. 105 entitled, "POINTE *ANAHEIM OVERLAY" of this Chapter; encompass the entirety of the 29.1 -acre Pointe *Anaheim Overlay; and, provide for the development of one t � comprehensive project to be constructed in �1p i1VOone sie3glacaatiwaeuaphases. If the Final Site Plan is found to be in substantial conformance with the Specific Plan and the provisions of this Chapter, the Planning Commission shall approve the Final Site Plan. The Planning Commission's decision shall be final unless appealed to the City Council within ten (10) days from the date of such decision. Plans submitted for issuance of building permits shall be in substantial conformance with the approved Final Site Plan. (b) Planning Commission Public Hearing Item. (1) Final Site Plans for all development within District A and the Future Expansion District, with the exception of Parking Facilities shown on Exhibit 5.8.3e, 'Future Expansion District Concept Plan,' of the Specific Plan document, shall be subject to the review and approval by the Planning Commission at a noticed public hearing. (2) Notice of such hearing shall be given at the same time and in the same manner as specified for hearings for Conditional Use Permits in the Anaheim Municipal Code. Final Site Plans processed under this subdivision shall be subject to environmental review. The Planning Commission shall review the Final Site Plan to determine if it is in substantial conformance with the Specific Plan and the provisions of this Chapter. The Planning Commission may approve, disapprove or approve with conditions the Final Site Plan. The Planning Commission's decision shall be final unless appealed to the City Council within ten (10) days from the date of such decision. Before approving a Final Site Plan under the provisions of this subsection, the Planning Commission shall make the following findings of fact: [a] That the proposed development will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located; [b] That the size and shape of the site is adequate to allow for the full proposed development in a manner not detrimental to the particular area nor the peace, health, safety and general welfare; [c) That the approval of the Final Site Plan under the conditions imposed, if any, will not be detrimental to the health, safety and general welfare of the citizens of the City of Anaheim. (3) Notwithstanding the provisions and limitations of the foregoing subsections [a], [b] and [c], the Planning Commission or City Council may approve any Final Site Plan if the Planning Commission or City Council finds and determines, either in its approval of the Final. Site Plan or any other finding pertaining to the proposed development (including environmental Page 7 -8 The Disneyland Resort Specific Plan Section 7.0: Zoning and Development Standards .0601 For parcels designated Low Density on Exhibit 3.3.5b entitled `C -R Overlay' of the Specific Plan document, up to fifty (50) hotel /motel rooms per gross acre or seventy-five (75) hotel /motel rooms per lot or parcel existing on the date of adoption of The Disneyland Resort Specific Plan Ordinance, whichever is greater. .0602 For parcels designated Medium Density on Exhibit 3.3.5b entitled `C -R Overlay' of the Specific Plan document, up to seventy -five (75) hotel /motel per gross acre or seventy-five (75) rooms per lot or parcel existing on the date of adoption of The Disneyland Resort Specific Plan Ordinance, whichever is greater. .0603 For parcels that are developed with hotel /motel rooms which exceed the maximum density designation, the number of rooms existing on the date of adoption of The Disneyland Resort Specific Plan Ordinance may be rebuilt or modified at their existing density. .070 Maximum Permitted Heights. The maximum permitted height of structures shall be as indicated on Exhibit 1. .080 Interior Structural Setback and Yard Requirements from Adjacent Interior Lots. The following minimum setback requirements apply to structures developed under the provisions of Section 18.78. 100 entitled "C -R OVERLAY" of this Chapter, except as provided elsewhere in this Chapter: ten (10) feet minimum. .090 Setbacks from Abutting Public Rights -of -Way. The minimum setback requirements for structures developed under the provisions of this Section shall be as described for the base District the structure is located in with the following exceptions: .0901 Clementine Street. Twenty (20) feet minimum, if the height of the structure is seventy -five feet or less in height or thirty (30) feet minimum, if the height of the structure is greater than seventy -five (75) feet. .0902 Freedman Way. Twenty (20) feet minimum, if the height of the structure is seventy-five feet or less in height or thirty (30) feet minimum, if the height of the structure is greater than seventy-five (75) feet. .0903 Katella Avenue. Eleven (11) feet minimum, with landscaping consistent with Design Plan Cross Section numbers 3a and 3b. 18.78.105 POINTE *ANAHEIM OVERLAY .010 Purpose. The Pointe *Anaheim Overlay has been established to provide for the development of the Pointe *Anaheim Lifestyle Retail and Entertainment Complex pursuant to the uses set forth in subsection 18.78.105.020 entitled, "CONDITONAL USES" of the Anaheim Municipal Code and subject to the density limitations set forth in subsection 18.78.105.030 entitled, "POINTE *ANAHEIM DENSITY" of the Anaheim Municipal Code, if the properties are not developed in accordance with The Disneyland Resort Specific Plan Parking District (East Parking Area) requirements or the District A or C -R Overlay requirements. .020 Conditional Use and Structures. .0201 The following building, structures and uses set forth in paragraphs .0202 and .0203 shall be permitted as part of the Pointe *Anaheim Lifestyle Retail and Entertainment Complex provided that: AevArYtBAeled (a) Conditional Use Permit No. 4078 is approved pursuant to, and subject to, { e conditions and required showings of Section 18.03.030 entitled, "CONDITONAL USE PERMIT (C.U.P'S) —GENERAL" of this Code; de ( r�rArelaettsive'project� \b All uses and structures set forth in subsection 18.48.70.030 entitled, "PERMITTED ACCESSORY USES AND STRUCTURES" and in subsection 18.48.070.040 entitled "PERMITTED TEMPORARY USES AND STRUCTURES" of the Anaheim Municipal Code shall be permitted in the Pointe *Anaheim Overlay; C C X With the exception of subsection 1 .48.070.060.0619 entitled, "PROHIBITED SIGNS ", all uses set forth in subsection 18.48.070.060 entitled, "PROHIBITED USES" of the Anaheim Municipal Code shall be prohibited in the Pointe *Anaheim Overlay; Page 7 -29 The Disneyland Resort Specific Plan Section 7.0: X All development is subject to the imitations described in section 18.78.050 entitled, `LAND USE AND SITE DEVELOPMENT STANDARDS — GENERAL" of the Anaheim Municipal Code; and, Ca) �e The Pointe *Anaheim Lifestyle Retail and Entertainment Complex shall be designed in accordance with the Conceptual Site Plans shown in Exhibits 5.8.3.f.1, 5.8.3.f.2, 5.8.31.3, 5.8.3.f.4, and 5.8.3.f.5 of The Disneyland Resort Specific Plan document. �� 0202 Hotels, including suite -type \ V hotel as described in subsection 18.78.105.030 entitled, "POINTS *ANAHEIM rfr�Yt 11riitLj� DENSITY" of the Anaheim Municipal Code. ,0203 All conditional uses and structures listed in subsection 18.48.070.040 entitled, "CONDITONAL USES AND STRUCTURES" of the Anaheim Municipal Code which implements the list of uses described in subsection /�NANEiM 18.78.105.030 entitled "POINTE *� DENSITY" of the Anaheim Municipal Code as further described below: (a) Specialty Retail/ Entertainment Center with integrated management and a festive theme orientation and plaza /pedestrian - oriented amenities with the following types of uses: (1) Banking facilities. (2) Children's, men's, and women's apparel, shoes, jewelry and accessories. (3) Entertainment facilities (amusement arcades, skating rinks, outdoor recreational playground areas). (4) Shopping services. (5) Specialty merchandise, gifts and toys. (6) Transportation/ travel services including an automobile rental agency office with no on -site vehicular storage). (7) Radio and television studio to enable live and /or taped broadcast facilities at the site. (8) Baby - sitting services'. (9) Fast - food /food court -type and walk -up /specialty restaurants. (10) Enclosed and semi - enclosed full - service and theme -type restaurants/ nightclubs with or without Standards on -site sale and consumption of beer, wine, and alcoholic beverages and. associated entertainment uses (billiards, dancing, live and recorded performances). 11 Art galleries/ museums. (b) Outdoor events /uses held within the confines of Pointe *Anaheim, out of view of the public right -of -way and not directed towards the public right -of -way including open -air festival events oriented towards tourists and guests for public gatherings, speeches, concerts, presentations, or shows; outdoor booths, kiosks and stands; and, outdoor special lighting effects. (c) Theater, including dinner, legitimate or motion picture theaters, performance theaters or night clubs, ro and indoor amphitheaters (the square P footage of the indoor amphitheater use would be deducted from the maximum rsquare footage). (d) Parking /transportation facilities for automobiles, buses, shuttles, and 0cc Pointe*Anaheim Density. The Overlay .. -- .. _ -seatarfeP4iye- pe Fina StIll-till- With 4,9 - (•�� N1uvals. &re ct byl4 sigps. Page 7 -30 Insert A (page 1 -8, 3 -23, 7 -30, 10 -7) (page 6 -41, 6 -42) doom ' 634,600 gross square feet of retail /dininglentertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot- -bus terminal /facility for airport transport and to /from sightseeing venues. Depa- Rdin"n the availability of funding at the time_af -construction -t#ie- conference- center - may -be- reduced the number of striped parking spaces -maybe Insert B (page 2 -7) In conjunction with Specific Plan Amendment Study /Mitigated Negative Declaration was prepar of CEQA. The Addendum demonstrated that t Declaration which were included in Amendment substantially worse environmental impacts environmental review was required. No. 5, an Addendum to the Initial in compliance with the requirements ie changes to the Mitigated Negative No. 5 would not result in any new or that no supplemental or subsequent Insert C (page 3 -27) Up to 200 of the 1,662 hotel rooms may be developed as Vacation Ownership Resort units. Up to an additional 150,000 suare feet of hotel gross square feet could be built in the proposed project if the developer elects to develop all 200 Vacation Ownership Resort units due to the larger square footage associated with a Vacation Ownership Resort unit. I / Insert D (page 3 -27) One of the hotels is plaOried to incorporate a theater /night club area of approximately 17,000 gross square fget. This area has been incorporated into the total hotel square footage. Up to 133,630 gross square feet of area on the top of the parking structure is planned for development as arhotel conference center. Associated with the hotel conference center is a 62,500 gross square foot outdoor terrace area, which will accommodate outdoor events. Depending on availability of funding at the time of construction, the conference center may be"reduced in size or eliminated from the project. The Disneyland Resort Specific Plan ii' Section 7.0: Zoning and Development Standards The Pointe *Anaheim Overlay density is set forth in more detail in Exhibit 3.3.6b of The Disneyland Resort Specific Plan document entitled "Pointe *Anaheim Overlay Development Program." .040 Maximum Permitted Heights. The maximum permitted height of structures shall be as indicated on Amended Exhibit 1 of the Specific Plan document entitled "Maximum Permitted Structural Height ". .050 Interior Structural Setback and Yard Requirements from Adjacent Interior Lots. A ten -foot minimum setback adjacent to interior lot lines abutting the Anaheim Resort Specific Plan No. 92 -1 Zone boundary is required for structures developed under the provisions of Section 18.78.105 entitled "Pointe *Anaheim OVERLAY" of this Chapter. .060 Setbacks from Abutting Public Rights -of -Way. The minimum setback requirements for structures developed under the provisions of this Section shall be as described for the base District the structure is located in with the following exceptions: .0601 6lemant+n"treet4forn erly- Freedman WayrTwenty (20) feet minimum, if the structure is seventy-five feet or less in height or thirty (30) feet minimum, if the structure is greater than seventy-five (75) feet in height with landscaping consistent with Design Plan Cross Section number 27. .0602 Disney Way (formerly Freedman Way). Twenty (20) feet minimum, if the structure is seventy-five feet or less in height or thirty (30) feet minimum, if the structure is greater than seventy-five (75) feet in height with landscaping consistent with Design Plan Cross Section number 17b. .0603 Katella Avenue. Eleven (11) feet minimum, with landscaping consistent with Design Plan Cross Section numbers 3a and 3b. .0604 Harbor Boulevard. Twenty-six (26) feet, minimum, with landscaping' consistent with Design Plan Cross Section number 17a. 18.78.106 CENTRAL CORE PROVISONS FOR THE POINTE *ANAHEIM OVERLAY .010 Purpose. The purpose of the Central Core is to create a consistent, high quality pedestrian environment that reinforces the character established by the landscape and other streetscape elements identified in the Anaheim Resort Identity Program. The Central Core boundaries encompass lots or parcels with frontage on Harbor Boulevard and Katella Avenue. Subsections .020 and .040 below apply to the minimum required setback areas adjacent to the ultimate public right -of -way. Subsection .030 below applies to the area between the ultimate public right -of -way and the actual (constructed) building setback. .020 Setbacks Adjacent to Harbor Boulevard. The required landscape setback area adjacent to the Harbor Boulevard ultimate public right -of -way may be paved provided: .0201 The paved area will serve pedestrian - related activities (restaurant outdoor dining, and limited pedestrian walkways from the public right -of -way to the Pointe *Anaheim Complex as approved by the Planning Director and the City Engineer); .0202 Landscape shall be designed and installed in conformance with the tree density requirements identified in the Design Plan and depicted in Exhibit 5.6.6.3a entitled, "Tree Density Factor Plan;" and, .0203 A minimum of fifty percent (50 %) of the required setback area immediately adjacent to the restaurant outdoor dining area, excluding driveways perpendicular to the street, shall contain live landscape materials. .030 Location of Parking Areas. No parking areas shall be located between the ultimate public right -of -way and the actual (constructed) building setback provided, however, that vehicular drop -off areas maybe located adjacent to the front of a building, but not in the required minimum setback area. .040 Lighting. Fluorescent, low pressure sodium, high pressure sodium, and mercury vapor are prohibited in the front setback areas. Page 7 -31 The Disneyland Resort Specific Plan Section 7.0: Zoning and Development Standards exceed the corridor widths shown on Exhibit 5.8.31.5. .0202 Provisions -Sign Regulations. The location, size, type, construction and all other matters relating to signs in the Specific Plan area, with the exception of theme parks and retail entertainment centers in the Theme Park and Hotel District, which shall be exempt from the provisions of this Section and other regulations contained within the Anaheim City Code governing signs, shall be regulated and controlled exclusively by the provisions of this Chapter except to the extent reference is expressly made in this Chapter to env other provision of the Anaheim Municipal Code. In the event of any conflict between the provisions of this Chapter and any other provisions of the Anaheim Municipal Code so referenced herein, the provisions of this Chapter shalt govern and prevail. All signs and all applications shall therefore be exclusively administered by the Planning Director except those signs which may be sought in conjunction with a conditional use permit or a zone variance. .0203 Coordinated Sign Program. All signs on a property shall be designed as part of a coordinated architectural, informational, regulatory and directional sign system with a consistent design detailing, typeface and color system. All multi - tenant signs shall either use one consistent typeface for all tenants or use one color for all sign copy. The capital letter height of all tenant identification copy shall be the same on a single sign face. Multi - tenant wall signs shall either be all wall signs or all canopy signs except for as provided elsewhere in this Chapter for hotel /motel accessory uses. .0204 Resolution of Inconsistent Provisions. Notwithstanding any other provision of this Code to the contrary, all provisions governing signs or advertising structures of any type in this Zone shall be contained within this Chapter; provided, however, the provisions of Section �' 18.05.070 entitled "TEMPORARY SIGNS, FLAGS, BANNERS AND BALLOONS - GENERAL", and Chapters 4.04 entitled "OUTDOOR ADVERTISING SIGNS AND STRUCTURES — GENERAL," 4.08 entitled "OUTDOOR ADVERTISING SIGNS AND STRUCTURES —NEAR FREEWAYS" and 4.09 entitled "ADVERTISING OF MOTEL AND HOTEL RENTAL RATES" of this Code shall apply to signs and advertising structures in this zone to the extent such provisions are not inconsistent with this Chapter. .0205 Variances From Sign Requirements. No person shall install or maintain any sign in the Specific Plan area except as permitted herein; provided, however, that any requirements or restrictions may be waived in whole or in part upon such conditions as may be imposed by the Zoning Administrator, Planning Commission or the City Council by a zone variance processed and approved in accordance with all procedures, requirements and restrictions established for variances pursuant to Section 18.03 entitled "ZONING PROCEDURES - AMENDMENTS, CONDITIONAL USE PERMITS AND VARIANCES" of the Anaheim Municipal Code. .0206 Signs Approved in Conjunction with Conditional Use Permits. Approval of any conditional use permit shall be deemed to constitute approval of any on- site signs which are otherwise permitted in the Specific Plan area unless, as part of the action approving the conditional use permit, more restrictive sign requirements are imposed. .0207 Legal Nonconforming Signs - General. Any sign or other advertising structure of whatever type or nature, other than an illegal sign, which violates or otherwise does not comply with the applicable requirements of this Chapter shall be subject to compliance with the regulations prescribed herein in the time and manner hereinafter set forth. (a) Legal Nonconforming Signs - Continuation and Termination. Any legal nonconforming sign or sign structure in existence on the effective date of this Chapter which violates or otherwise does not conform to the provisions hereof shall be removed, altered or replaced so as to conform to the requirements of this Chapter (hereinafter the "abatement" either: Page 7 -42 Insert E (page 3 -29) The Pointe Anaheim Overlay project will be an integrated development which will be phased over time. Construction activity of project buildout will pfrogress five areas of the project, with two alternatives for Area A and Area B. TIp�e first phase is projected to open in mid -2004 and is planned to include those portionVof Area A that, depending on market conditions and other circumstances, can realistica (ly be commenced in mid- to late -2002. The Initial Phase would likely include approxi ately 120,000 square feet of RDE and other commercial uses in Area A -1, or appro ¢ mm ately 300,000 square feet of RIDE in Area A -2 if the aquarium lease is consun ed prior to issuance of building permits. Given the present market conditions, it is /Ilik y that development of hotel rooms will be deferred. However, the portion of the ProSite where the hotel in Area A is planned will be improved in the Initial Phase sot otel rooms can be added as soon as market conditions permit. The intent within approximately one year of the op however timing of the phasing will d and the availability of project financing. Insert F (page 6 -45) Additional proposed uses requiring and Vacation Ownership Resort u conditionally permit murals and landscaping along the interior bo n( Insert G (page 6 -59) is to b6gin on the next phase of construction eninof the previous phase of development; de primarily on market demand at the time ode amendments include the Code amendments would ctional signs for the project ies of the project site. proposed aquarium also be required to and to delete the The Addendum to the InVal Study /Mitigated Negative Declaration determined that the modified project would mand less water than the previously approved project, even with the proposed a , :Itum. Insert H (page 8.7.5 Amendmernt No. 5 Amendment No. 5 to The Disneyland Resort Specific Plan No. 92 -1 related to the Pointe Anaheim Ove ay allows the development of the Pointe Anaheim Lifestyle Retail and Entertainment Complex as an integrated development to be constructed in up to five phases over. period of time. _ Insert I (page 7 -42) (3) For the Pointe Anaheim Overlay, on -site directional signage may be included as part of the overall Coordinated Sign Program if considered and approved as a part of the Final Site Plan or as amended. (corrected at the 11 -19 -01 Planning Commission public hearing) The Disneyland Resort Specific Plan Section 7.0: Zoning and Development Standards (b) Animated signs. (c) Attachments or "riders" to signs. (d) Beacon lights or beacon signs, when the intent of such signs is advertising and not entertainment, which shall not have adverse glare on adjoining properties. (e) Billboards. (t) Business information sign. (g) Can -type signs which incorporate translucent copy and translucent background, provided, however, that can - type signs with opaque background, allowing only the copy to be illuminated, shall be permitted. (h) Changeable copy signs (including electronic message boards), as defined (except as permitted under a conditional use permit for theaters, entertainment facilities, amusement parks or for hotel /motel complexes provided the site on which the use is located is a minimum of six (6) acres in area. (i) Emitting signs. U) Exposed neon signs. (k) Flashing or traveling light signs. (1) Florescent colors on signs except for colors on company symbols. (m) Landscape signs. An arrangement of any plant type (flowers, shrubs, etc.), which spells out words or resembles a symbol or a figure shall not be permitted. (n) Magnetic signs. (o) Off - premises or off -site (p) On -site directional guidance and on -site directory signs which are not part of a coordinated architectural, informational, directional and regulatory sign system. (q) Paper, cloth and plastic streamer signs, and flags, banners and fixed balloons except as otherwise permitted pursuant to Section 18.05.070 entitled "TEMPORARY SIGNS, FLAGS, BANNERS AND BALLOONS - GENERAL," of the Anaheim Municipal Code. (r) Painted signs on exterior walls. (s) Pennants except as otherwise permitted pursuant to Section 18.05.070 entitled "TEMPORARY SIGNS, FLAGS, BANNERS AND BALLOONS - GENERAL," of the Anaheim Municipal Code. (t) Permanent "come -on" signs (e.g. `Sale Today', "Stop ", "Look ", "Going out of Business ", etc.). (u) Pole signs. (v) Portable signs. (w) Product advertising signs (e.g., soft drinks, cigarettes, etc.). (x) Roof signs. (y) Rotating or revolving signs. (z) Signs attached to trees or landscaping. (aa) Signs projecting over or into the public right -of -way except as otherwise expressly permitted herein. (bb) Statues utilized for advertising purposes. (cc) Temporary signs except as otherwise expressly permitted herein. (dd) Replicas of official traffic control signs or signs so similar as to be confusing or hazardous to traffic. (ee) Vehicle entrance or exit signs which incorporate business name(s) or other advertising not in compliance with Section 18.78.130.061(c) entitled "INFORMATION, REGULATORY AND DIRECTIONAL (IRD) SIGNS VISIBLE FROM THE PUBLIC RIGHT -OF -WAY" of this Chapter. (ff) Vehicle signs (signs mounted or displayed on a vehicle for advertising purposes) or the parking or storage of advertising vehicles on public or private property. (gg) Wall signs located below the third (3) floor level of a building and which signs are located on a property adjacent to and visible from residential properties. (hh) Window signs, including neon signs and signs painted on display windows with day -glo, or temporary paint (other than permitted window identification signs as defined in Section 18.78.130.0601(0 entitled "WINDOW IDENTIFICATION SIGN' of this Chapter.) .0604 Sign Standard Matrices. In addition to all other requirements contained in this Chapter, permitted signs shall comply with the provisions of Exhibit 7.Oa entitled "General Sign Standards Matrix" and Exhibit 7.Ob entitled `Hotel /Motel Sign Standards Matrix' as hereinafter set forth in (except as AIIDwcd for iA seatt'oA 0a. ISO. 620ta'] C — Page 7-48 The Disneyland Resort Specific Plan + Section 8.0: Zoning Explanation • Modification of Section 10 (General Plan Amendment) of the Specific Plan document to add a description of Gen- eral Plan Amendment No. 359 language pertinent to Pointe *Anaheim. • Amendments to the Public Facilities Plan to reflect im- provements to Freedman Way (future Disney Way) and Clementine Street (future Freedman Way) including dual left -turn lanes on northbound Clementine Street at Freedman Way; a through right -turn lane on eastbound Freedman Way at Clementine Street; right -turn lanes along southbound Clementine Street south of Freed- man Way; and a mid -block break in the Clementine Street landscaped median to permit turns into and out of the Pointe *Anaheim project area. • Amendment to the Development Plan to show the loca- tion of the Pointe *Anaheim Overlay boundaries: • Amendments to the Design Plan to add Conceptual Site Plans depicting the layout of the Pointe *Anaheim project and amendments to the design guidelines and street cross - sections to reflect the Pointe *Anaheim project components; • Amendments to the Zoning and Development Standards to establish the zoning standards for the Pointe *Ana - J yt e e t heim Overlay including the proposed list of uses. project }{ density, driveway locations and new provisions for on- site commercial signage. Page 8 -20 Insert E (page 3 -29) The Pointe Anaheim Overlay project will be an integrated development which will be phased over time. Construction activity of project buildout will progress over five areas of the project, with two alternatives for Area A and Area B. The first phase is projected to open in mid -2004 and is planned to include those portions of Area A that, depending on market conditions and other circumstances, can realistically be commenced in mid- to late -2002. The Initial Phase would likely include approximately 120,000 square feet of RIDE and other commercial uses in Area A -1, or approximately 300,000 square feet of RIDE in Area A -2 if the aquarium lease is consummated prior to issuance of building permits. Given the present market conditions, it is likely that development of hotel rooms will be deferred. However, the portion of the Project Site where the hotel in Area A is planned will be improved in the Initial Phase so that hotel rooms can be added as soon as market conditions permit. The intent is to begin on the next phase of construction within approximately one year of the opening of the previous phase of development; however, the timing of the phasing will depend primarily on market demand at the time and the availability of project financing. Insert F (page 6 -45) Additional proposed uses requiring Code amendments include the proposed aquarium and Vacation Ownership Resort units. Code amendments would also be required to conditionally permit murals and directional signs for the project and to delete the landscaping along the interior boundaries of the project site. Insert G (page 6 -59) The Addendum to the Initial Study /Mitigated Negative Declaration determined that the modified project would demand less water than the previously approved project, even with the proposed aquarium. Insert H (page 8 -20) 8.7.5 Amendment No. 5 Amendment No. 5 to The Disneyland Resort Specific Plan Anaheim Overlay allows the development of the Pointe Entertainment Complex as an integrated development to phases over a period of time. Insert I (page 7 -42) No. 92 -1 related to the Pointe Anaheim Lifestyle Retail and be constructed in up to five (3) For the Pointe Anaheim Overlay, off -site and on -site directional signage may be included as part of the overall Coordinated Sign Program if considered and approved as a part of the Final Site Plan or as amended. The Disneyland Resort Specific Plan V Section 10.0: General Plan Amendment 10.1 Introduction As mentioned earlier in the document, this section includes a discussion of all General Plan Amendments associated with this Specific Plan. According to California Government Code Section 65450 no specific plan may be adopted unless the proposed plan is consistent with the general plan. Therefore the amendments discussed in this section were adopted by the City prior to adoption or amendment of The Disneyland Resort Specific Plan. The Disneyland Specific Plan implements the City's Commercial Recreation General Plan designation. Exhibit 10.1a is a vicinity location map for the General Plan Amendments. General Plan Amendment No. 331, which was adopted by the City Council on June 22, 1993 prior to the June 29, 1993 adoption of The Disneyland Resort Specific Plan, amended the City of Anaheim's General Plan Land Use and Circulation Elements to reflect the plan for The Disneyland Resort. General Plan Amendment No. 336, which was adopted by the City Council on March 22, 1994 prior to the March 29, 1994 adoption of The Disneyland Resort Specific Plan Amendment No. 1, amended the Land Use Element text to reflect the creation of a new District entitled 'District A,' which allows uses permitted under the Anaheim Resort Specific Plan No. 92 -2, Zoning and Development Standards. General Plan Amendment No. 333, which was adopted by the City Council on September 20, 1994 prior to the Sep- tember 27. 1994 adoption of the Anaheim Resort Specific Plan, amended the City of Anaheim's General Plan Land Use, Circulation and Environmental Resource and Manage- ment Elements to reflect the Anaheim Resort Specific Plan. General Plan Amendment No.359, which was adopted by City Council on July 13, 1999, prior to the adoption of the Disneyland Resort Specific Plan Amendment No. 4, amend- ed the General Plan Land Use Element text to reflect the creation of the Pointe *Anaheim Overlay, which allows the development of the Pointe *Anaheim Lifestyle Retail and En- lYtSey't eJ r tertainment Complex. — > The following paragraphs describe Sections of the Land Use and Circulation Element Amendments which pertain to The Disneyland Resort Specific Plan. Page 10 -1 Insert J (page 10 -1) General Plan Amendment No. 393, which was adopted by City Council on prior to the adoption of the Disneyland Resort Specific Plan Amendment No. 5, amended the General Plan Land Use Element text to reflect the modified Pointe Anaheim overlay, which allows the development of the Pointe Anaheim Lifestyle Retail and Entertainment Complex. The Disneyland Resort Specific Plan •;• Section 10.0: General Plan Amendment new theme park, additional hotels and entertainment ar- eas, administrative office facilities, new public and private parking facilities, and an internal transportation system. This development is within five planning Districts (Theme Park, Hotel, Parking, Future Expansion and District A) and a C -R Overlay which allows development within the Overlay to either be consistent with the underlying Resort District or subject to the same land uses as in the Anaheim Resort Specific Plan No. 92 -2 Zone. The Disneyland Resort Specific Plan also indentifies maximum development density desig- nations for hotel /motel development in the Hotel District (up to 5,600 hotel rooms for the entire District with up to 1,000 hotel rooms transferable to the Theme Park District), in District A (the maximum number of units permitted would be 75 hotel /motel rooms per gross acre or 75 hotel/ motel rooms per parcel existing on June 29. 1993, which- ever is greater) and the C -R Overlay (the maximum number of units permitted on a parcel would be the following: 1) for parcels designated Low Density - up to 50 hotel rooms per gross acre or 75 rooms. whichever is greater; and 2) for par- cels designated Medium Density - up to 75 hotel rooms per gross acre or 75 rooms, whichever is greater; provided that for those parcels that are developed with hotel /motel rooms which exceed the maximum density designation, the num- ber of rooms existing on the date of adoption of The Disney- land Resort Specific Plan Ordinance may be rebuilt or modified at their existing density.) It should be noted that accessory uses may be developed as well as other visitor - serving commercial/ retail and restaurant uses along with these hotel /motel uses. The Disneyland Resort Specific Plan also provides for the development of the Pointe *Anaheim Lifestyle Retail and En- tertainment Complex pursuant to the Pointe *Anaheim Overlay at the following density and subject to the approval Insert A °f Conditional Use Permit No. 407 , ,00ag Ye fo .,G mot.. it /fl L ...e-.. F..... �.. Page 10-7 Insert A (page 1 -8, 3 -23, 7 -30, 10 -7) (page 6 -41, 6 -42) 634,600 gross square feet of retail /dining /entertainment uses; three to four hotels comprising 1,662 hotel rooms /suites (of which up to 200 units can be developed as Vacation Ownership Resort units) with approximately 282,071 gross square feet of related accessory uses (the hotel rooms /accessory uses would encompass a maximum of 1,330,771 gross square feet) and, of that total, an approximate 133,630 gross square foot area on the top floor of the parking structure to be used for a hotel conference center; and a 1,949,800 gross square foot parking structure with up to 4,800 striped parking spaces and 15 bus parking spaces with a 10,200 gross square foot bus terminal /facility for airport transport and to /from sightseeing venues. Depending on the availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project and the number of striped parking spaces may be reduced to 3,752 spaces. Insert B (page 2 -7) In conjunction with Specific Plan Amendment No. 5, an Addendum to the Initial Study /Mitigated Negative Declaration was prepared in compliance with the requirements of CEQA. The Addendum demonstrated that the changes to the Mitigated Negative Declaration which were included in Amendment No. 5 would not result in any new or substantially worse environmental impacts and that no supplemental or subsequent environmental review was required. Insert C (page 3 -27) Up to 200 of the 1,662 hotel rooms may be developed as Vacation Ownership Resort units. Up to an additional 150,000 square feet of hotel gross square feet could be built in the proposed project if the developer elects to develop all 200 Vacation Ownership Resort units due to the larger square footage associated with a Vacation Ownership Resort unit. Insert D (page 3 -27) One of the hotels is planned to incorporate a theater /night club area of approximately 17,000 gross square feet. This area has been incorporated into the total hotel square footage. Up to 133,630 gross square feet of area on the top of the parking structure is planned for development as a hotel conference center. Associated with the hotel conference center is a 62,500 gross square foot outdoor terrace area, which will accommodate outdoor events. Depending on availability of funding at the time of construction, the conference center may be reduced in size or eliminated from the project. The Disneyland Resort Specific Plan .;. Section IO.O: General Plan Amendment !Cater will Sfgae­ b i tL�te.i ' thr a a . .. Ft'tfar�Sp9�b.3�rgmsightse. - 01 4149-1;6 sq The Pointe *Anaheim Overlay encompasses District A and the portion of the Parking District (East park- ing Area) /C -R Overlay south of Disney Way. - The Water and Electrical Distribution System and the Sew- er and the Storm Drain Maps in the 1985 General Plan il- lustrated the current and planned infrastructure improvements within the City as of 1985, when the last comprehensive General Plan update was adopted. Up- grades to these maps were also adopted as follows (these changes are discussed in Section 4.0, 'Public Facilities Plan.' of The Disneyland Resort Specific Plan): The Water Distribution System —The General Plan lists ma- jor water mains 14 inches and larger. In the Anaheim Re- sort, the only major water main is located in West Street. A number of water mains within The Disneyland Resort Spe- cific Plan area will be upgraded to be larger than 14 inches. These upgraded water mains include: • a 20 -inch water main in Clementine Street; • a 20 -inch water main in Freedman Way; • 16- and 20 -inch water mains In Harbor Boulevard; • a 20 inch water main in Katella Avenue; and. • a 20 -inch water main in the relocated West Street /Disney- land Drive. In addition a new well will be located at Clementine Street and Freedman Way. The Electrical Distribution System —A Southern California Edison 220,000 volt transmission line bisects the Specific Plan'area as shown on the Electrical Distribution System map. As described in the Specific Plan document, the Edi- son transmission lines will be relocated to the perimeter of the Theme Park and Hotel Districts. In addition, a new elec- trical substation will be constructed in the back -of -house Page 10 -8 Note: The following six exhibits on pages 5 -187 through 5 -192 have been reduced in size. Larger scale (11 " x 17') will be provided for The Disneyland Resort Specific Plan No. 92 -1 document. o... ♦Mii:m� one. 5.117 LEVEL 2 Exhibit 5.8.3.f.2 �,., >. Anaheim, LEVEL 3 Exhibit 5.8.3.0 SIAND MoTit I .. U MUSIC MIT- ---- ---- -- oi, ------------- — - — - — - — - — - — - Is HEY SO --------------- D ... --- ---- ----------------- -------- ------- I 11.11,11PAT10K vmpvii .. WIMP Ilsoll UNITS • ........... (OKFERIKE (WIN — ----- ------ ------------- --- I J ---------- Li toy HOTEL ......... ... . -- ------------- oj ----------- -------------------------- �--: --------------------- --------------------------------------------------- -- -- ------ - ----------------- ------ -- ---------------------------------------- - --------- ------------ ROOF PLAN Exhibit 5.8.314 IOQ(100 OF IONS YOW(0III0011 HFAS X01(OXSIDUEO uYcsLM PIOIEFF mmlolt INTERIOR SIGNAGE AND IEON/THEMEDSIGNAGE ELEMENT PLAN Exhibit 5.6AU N. A,m .' r... cul PEOPLE MOVER KOM I'(rt i 1 1�- R RRfJI. I_ —I PARKING . J RRllld AOUARIUM . A I 1 r BRAN (ENRRAI PARKING - WESR PARKING .e(IOW fVFII AI ! 1. DICK Vuv.. I tARRAI I '1 h — FNRIRF � DECIC( AAG Y r SINN PARKING DFU IRYft RN 1l) f I DICK IILYFl1 AI , OTxom] _ eii I REA A -1 "� AREA B -1 AREA C -1 /C -2 AREA D 1 %D-2 .__. ... _.. fOX([PNll RIU5t6a ➢OX.IN[(IX}10F51LN WY'IARY (OX(F %U4IXUSIR }IIONTHE flll }l DESIGN :MY'IAAY fOX((PNA RWSIR}DpX.IXE IIn}l0lSI4X!4Y YAAY ,, = (DN([XUllIIMR }IIpX. THE ANAL DELLKWIVAR. SURfa PARKING ' I • }� J 4l ARAit I L- J NA Z Y\ /RAXDFD � ( VAUIION OWNERSHIP I 1� I p w l u a al�tARUPi A '- RnuT =;) LREA -2 AREA B -2 AREA E -1 /E -2 PHASING DIAGRAM ....1 fOXQ11UAl NIDSIRIRpN DttfINA10(S(GN NdYnN (011(FflUAI IAUSIAp110N . Ml TINA DESIGN RAY 9 }AR (ONRPIUAIIIIUSIPAlIOX.INRIxpI "!51411 v ?YY }RY Exhibit 5.8.3.f.6 .` -'4. � ` .,y... t ... X' Q d: zw�, 'A-+,. . a .>P +:• .;�. „ <ti.r's...: - ' }:. Nero. 1_a 4:� �=v S S, ti '__.�. . r �,: M.v`•� . -. ,Y..'. '' : x w �^5.,�.. :a.. .. ..`s -.. ,.q' .L'POINTE ANAHEIM. LLC .:. .. . .... . - '.... •..,. "�•:: ,_. •.. - ' POINTE Ah1AHEIM "' Anaheim California___. _ Page 5 -191 The Disneyland Resort Specific Plan Conditions of Approval 11 -19 -01 AMENDMENTS TO THE CONDITIONS OF APPROVAL OF THE DISNEYLAND RESORT SPECIFIC PLAN NO. 92 -1, INCLUDING THE INTRODUCTION: CONDITIONS OF APPROVAL The conditions of approval include all mitigation measures and project design features included as part of Modified Mitigation Monitoring Program No. 0067 (as modified October 8, 1996) for this project (as required by Section 21081.6 of the Public Resources Code). For purposes of these conditions of approval, the following terns are used: INTRODUCTION The conditions of approval for development in the Theme Park, Hotel, Parking and Future Expansion Districts, District A and the C -R Overlay include all mitigation measures and project design features included as part of Modified Mitigation Monitoring Program No. 0067 (as modified October 8, 1996) (as required by Section 21081.6 of the Public Resources Code). The conditions of approval for development in the Pointe Anaheim* Overlay include all the mitigation measures including project design features included as part of Modified Mitigation Monitoring Plan No. 004 (as modified ) (as required by Section 21081.6 of the Public Resources Code). For purposes of these conditions of approval, the following terms are used: A. Applicant: The Walt Disney Company, its successors and assigns. B. Property Owner /Developer: Any owner or developer of real property within The Disneyland Resort Specific Plan Area, including the C -R and Pointe *Anaheim Overlay Areas and District A. C. Disneyland Resort: The Disneyland Resort, including a second gated theme park, modifications to the Disneyland Hotel, a new Disneyland Administration Building, new hotels, entertainment areas, internal transportation systems, and public parking facilities in the Parking, Theme Park and Hotel Districts, and the South Parking Area in the Future Expansion District. None of the conditions of approval contained herein shall be required to be implemented prior to issuance of any permits for or construction of new structures, improvements, or other modifications within the existing Disneyland Theme Park. D. Second Theme Park: A gated theme park planned south of the existing Disneyland Theme Park. PLANNING RELATED 27. That no development shall occur unless such development is substantially in accordance with The Disneyland Resort Specific Plan No. 92 -1 document on file with the Planning Department and marked Exhibit A, Amendment No. 4, and with Amendment No. 5 to The Disneyland Resort Specific Plan No. 92 -1. (It should be noted that Amendment No. 4 and Amendment No. 5 to The Disneyland Resort Specific Plan No. 92 -1 text and accompanying exhibit changes relate to development which may occur under the Pointe Anaheim Overlay only. These changes are set forth in Ordinance No. 5689 and Ordinance No. _. Except as specifically set forth in said ordinances, all other Disneyland Resort Specific Plan No. 92 -1 provisions, including those adopted in connection with Amendment No. 3 to The Disneyland Resort Specific Plan (Ordinance No. 5580) and Adjustments to The Disneyland Resort Specific Plan (Ordinance Nos. 5613, 5736 and 5768), remain unchanged. MISCELLANEOUS 76. That Final Site Plans required pursuant to Condition of Approval No. 29 shall be supplemented with the following planslmaterialslinformation which shall be submitted as part of the Final Site Plan application for each development phase (as shown on Exhibit No. 1, titled "Phasing Diagram" and dated November 19, 2001). All plans shall be fully- dimensioned and drawn to scale. A. A site plan showing all proposed project components of the development phase including, but not limited to, all buildings, landscape areas, parking areas, hardscape areas, fountains /water features, works of art, and the adjacent street improvements. page 1 of 5 B. Preliminary Grading Plan for the development phase of the Pointe Anaheim Overlay area, prepared by a registered civil engineer as required by, and to the satisfaction of, the City Engineer. C. Elevation plans showing all views of each proposed building. D. Floor plans for each building and each level of the parking garage (all parking spaces shall be dimensioned and the total number of spaces on each level shall be shown on the plan). E. Roof -top plans for each building showing all roof -top equipment (roof -top equipment is required to be fully- screened by the architecture of the building and painted in a color to match the color of the roof). The roof -top plan of the parking structure shall show City standard dimensioned parking spaces and /or the hotel amenities which shall serve guests and patrons of the Pointe Anaheim hotels only. The size, design and type of any hotel amenity must be shown on the Final Site Plan. Building addresses shall also be shown on the roof plan (the location and dimensions of the address numbers shall be to the satisfaction of the Police Department). F. Landscaping plans showing all proposed planting materials and the proposed landscape plant/tree palette (ten (10) copies), including color photographs, to show the proposed trees, shrubs and groundcover. 76. G. Above- and below - ground utility equipment shall be shown on each site plan and landscape plan. Plans must indicate how any above - ground equipment is fully screened by landscaping from any public view. H. Colored renderings (one (1) full -scale set and ten (10) reduced color copies) of the site improvements to show the building elevations from Harbor Boulevard, Katella Avenue, Clementine Street, and Disney Way, and views of the interior portions of the site. Additionally, where a development phase adjoins a future development phase (as yet undeveloped under the Pointe Anaheim Overlay), a colored rendering shall be provided to illustrate the building elevation(s) facing that future phase. I. Material and color boards for each building, including the parking structure, which show that all building colors, textures and materials shall be compatible between on -site uses. J. Material and color boards to show the proposed decorative paving materials for the interior courtyard areas of the site and pedestrian gathering areas. The submitted plan shall show the location and dimensions of any proposed pedestrian walkways from the public sidewalk and from any adjacent existing Pointe Anaheim development phase to the uses in the proposed phase. The plan shall also show continuity of decorative paving materials between the proposed development phase and any existing development phase. The design and location of the walkways shall not impact the placement of trees in the public right -of -way parkways. In addition, the walkways shall not preclude the planting of the number of trees required for the setback area by The Disneyland Resort Specific Plan Design Plan. K. Letter from the property owner /developer indicating how the Final Site Plan is in compliance with The Disneyland Resort Specific Plan Pointe Anaheim Overlay requirements and Conditional Use Permit No. 4078, as amended. L. That the lighting fixture plan shall include the style of the fixtures which shall be compatible with the project theme. M. That any existing adjacent development on the 29.1 acre Pointe Anaheim site shall be shown on the site plan or other appropriate plan(s) to clearly illustrate the relationship between the proposed construction on each development phase and existing developmentiuses on adjoining development phase(s). Such additional information is intended to illustrate vehicle and pedestrian circulation between development phases, access to public rights -of -way, page 2 of 5 shared parking spaces, continuity of building design and placement (including the parking structure), lines -of -sight to the interior of the Pointe Anaheim project from public rights -of -way and adjacent properties, etc. N. That the developer shall provide information regarding the development status of the other development phases (i.e., vacant, pre- existing use, construction underway in accordance with Pointe Anaheim uses, construction completed in accordance with Pointe Anaheim uses, etc.) for the entire 29.1 -acre Pointe Anaheim site. 77. That in connection with submittal of the Final Site Plan application for the Initial Development Phase (as shown on Exhibit No. 1 titled "Phasing Diagram" and dated November 19, 2001), the property owner /developer shall submit a coordinated signage program for the entire Pointe Anaheim project for Planning Commission's review and approval as part of the Final Site Plan application for said Initial Development Phase. The signs for each subsequent development phase shall be included in the Final Site Plan application for such subsequent phase, and shall comply with the signage program approved by the Planning Commission for the Initial Phase, as it may be amended from time to time. The sign program shall, at a minimum, include the following: A. A sign theme /concept for the Pointe Anaheim project which demonstrates an overall appearance, quality and type of sign, banner or other display device; the quality of such signage shall be equivalent to those utilized at Universal City Walk, Fashion Island or Irvine Spectrum. This is a quality standard and is not intended, nor does it provide, additional signage rights or permit any specific type of sign which does not conform with the signage regulations set forth in The Disneyland Resort Specific Plan, as amended per the Pointe Anaheim Overlay. B. Sign criteria for interior corporate sponsorship displays (said displays could include jumbotrons," banners or placards) which are oriented towards the interior of the Pointe Anaheim project. The staff report to the Planning Commission shall include a recommendation by the Planning Director regarding his or her determination as to the orientation of such displays. Such displays shall not be visible from the public rights -of -way at an equal elevation as the Pointe Anaheim property line (measured at five (5) feet above the grade of the sidewalk on the opposite side of the street from the Pointe Anaheim project) except through the limited view corridors set forth in the Pointe Anaheim Overlay (as shown on Exhibit 5.8.3.f.5, titled "Interior Signage and Icon/Themed Signage Element Plan," of The Disneyland Resort Specific Plan No. 92 -1 document). C. Sign criteria limiting interior wait signs from projecting more than fifty percent (50 %) of the vertical height of the sign above the roof parapet or fifty (50 %) of the horizontal length of the sign beyond the side of a building. Such signs shall not be visible from the public rights -of- way at an equal elevation as the Pointe Anaheim property line (measured at five (5) feet above the grade of the sidewalk on the opposite side of the street from the Pointe Anaheim project) except through the limited view corridors set forth in the Pointe Anaheim Overlay (as shown on Exhibit 5.8.315, titled "Interior Signage and Icon/Themed Signage Element Plan," of The Disneyland Resort Specific Plan No. 92 -1 document). D. Sign Criteria consistent with the adopted sign regulations for the Pointe Anaheim Overlay. E. Standards for maintenance and replacement of damaged /broken signs and banners and installation and maintenance of changeable sign copy, neon signage or electronic readerboards. F. Prohibited signs include billboards; off - premises or off -site directional signs; on -site directional guidance and on -site directory signs (as defined in Chapter 18.78.130 of the Anaheim Municipal Code pertaining to sign regulations for The Disneyland Resort Specific Plan) which are not part of a coordinated architectural, informational, directional and regulatory sign system and which have not been approved under subsection 18.78.105.020.0203(e) pertaining to conditionally permitted uses in the Pointe Anaheim page 3 of 5 Overlay; paper signs; permanent "come -on" signs (e.g., "sale today," "stop," "look," "going out of business," etc.); roof signs; vehicle signs (signs mounted or displayed on a vehicle for advertising purposes) or the parking or storage of advertising vehicles on public or private property; or replicas of official traffic control signs or signs so similar as to be confusing or hazardous to traffic attached to or within the parking structure within the project. 80. That prior to submittal of the Final Site Plan application for Area A (as shown on Exhibit No. 1, titled "Phasing Diagram" and dated November 19, 2001), the site plan shall show that the driveway for Pointe Anaheim and the driveway for the Super 8 Motel at 415 West Katella Avenue have been redesigned to combine the driveways or to meet the distance requirement set forth in The Disneyland Resort Specific Plan (i.e., minimum forty (40) foot wide distance between driveways serving adjacent parcels). If redesigned to combine the driveways, proof of an agreement with the adjacent property owner shall also be provided to the satisfaction of the City Attorney's Office. 81. That prior to submittal of the Final Site Plan application for the Initial Phase of Development or for Area A (as shown on Exhibit No. 1, titled "Phasing Diagram" and dated November 19, 2001), whichever occurs first, the property owner /developer shall submit a street improvement plan to the Public Works Director for the installation of the ultimate public right -of -way improvements on the north side of Katella Avenue from Clementine Street to the first Pointe Anaheim project driveway west of Clementine Street to improve vehicular access to the project. The property owner /developer shall be responsible for all costs associated with the preparation and processing of the street improvement plan and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. These improvements shall be completed prior to issuance of the first final building and zoning inspection, or prior to commencement of activities /uses pursuant to Section 18.02.026.020 of the Anaheim Municipal Code, whichever occurs first. 82.a That prior to submittal of the Final Site Plan application for Area C and /or Area D (as shown on Exhibit No. 1, titled "Phasing Diagram" and dated November 19, 2001), the property owner /developer shall submit a street improvement plan to the Public Works Director for the construction of a free right -turn lane on the south side of Disney Way from the parking garage driveway exit to Clementine Street (thirteen (13) foot lane width) in order to improve outbound parking structure operations. The property owner /developer shall be responsible for all costs associated with the preparation and processing of the street improvement plan and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. These improvements shall be completed prior to issuance of the first final building and zoning inspection, or prior to commencement of activities /uses pursuant to Section 18.02.026.020 of the Anaheim Municipal Code, whichever occurs first. 82. b. That prior to submittal of the Final Site Plan applications for Area C and Area D (as shown on Exhibit No. 1, titled "Phasing Diagram" and dated November 19, 2001), the property owner /developer shall redesign the site plan adjacent to the Disney Way improvements addressed in Condition No. 82a to maintain the minimum building setbacks adjacent to Disney Way. 83. Deleted intentionally at the November 19, 2001 Planning Commission public hearing 84. That in connection with submittal of the Final Site Plan application for each development phase, the property owner /developer shall provide information regarding the ownership and /or long term lease status of each of the underlying parcels, including any airspace or vertical subdivision, of the 29.1 acre Pointe Anaheim project (i.e., whether the parcels are owned, leased, under negotiation, etc.). 85. That in connection with submittal of the Final Site Plan application for each development phase, the property owner /developer shall submit the anticipated construction schedule for each of the remaining project components by development phase; and that an updated schedule shall be submitted to the Planning Department every six (6) months until the project is completed. page 4 of 5 86. That the Pointe Anaheim project will result in the reconstruction (including relocation and realignment) of street improvements (including, but not limited to, driveway approaches, streetscape, landscape and bus stop improvements) along Katella Avenue, Harbor Boulevard, Disney Way and Clementine Street. The property owner /developer shall be responsible for all costs associated with the preparation and processing of plans for these street improvements and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. A. Prior to approval of the Final Site Plan application for each development phase (as shown on Exhibit No. 1, titled "Phasing Diagram" and dated November 19, 2001), the property owner /developer shall submit a preliminary public right -of -way improvement plan that addresses the proposed improvements. This plan shall be consistent with the Anaheim Resort Identity Program, the Anaheim Resort Public Realm Landscape Program and the criteria and construction details that are shown on the approved Katella Avenue and Harbor Boulevard improvement plans. The preliminary plan shall be prepared to the satisfaction of the Public Works Director and be reviewed and approved by the Public Works Director prior to the approval of each Final Site Plan. B. Prior to approval of the Final Site Plan application for each development phase, the property owner /developer shall submit a plan, as required by the Public Works Department for review and approval by the Public Works Director, identifying (and updating) the sequence and timing of all street improvements along Disney Way, Clementine Street, Katella Avenue and Harbor Boulevard. Said street improvement plans shall include all driveways, traffic signals, pedestrian cross walks, etc. The phasing and timing for commencing and completing any or all of the street improvements shall be as required by Public Works Director. C. Prior to issuance of the first building permit for each development phase, the final plan for the street improvements associated with the underlying devlopment phase shall be prepared to the satisfaction of the Public Works Director and be reviewed and approved by the Public Works Director. D. Prior to the first final building and zoning inspection for each development phase, or prior to commencement of activities /uses pursuant to Section 18.02.026.020 of the Anaheim Municipal Code, whichever occurs first, the street improvements associated with the underlying development phase as shown on the approved plan shall be completed to the satisfaction of the Public Works Director. 94. That in the event that the building shown in the middle of the Harbor Boulevard view corridor on Exhibit 5.8.315 (titled "Interior Signage and Icon/Themed Signage Element Plan ") of The Disneyland Resort Specific Plan No. 92 -1 document, is destroyed or proposed to be removed for any reason, it shall be replaced with the construction of an equivalent structure (same size and dimensions shown on said Exhibit 5.8.315 and on Exhibit No. 7 (titled "Elevations, West Elevation — Harbor Boulevard," dated November 19, 2001) approved in connection with this conditional use permit) in order to provide for the same limited views of the interior sgnage in this view corridor. Prior to approval of a demolition permit for said building, a Final Site Plan showing the design of the replacement structure shall have been reviewed and approved by the Planning Commission and a building permit shall have been issued for the new building. Construction of the new building shall commence immediately following demolition of the said building. Prior to issuance of a building permit for said building, an unsubordinated covenant providing for the reconstruction, approved by the Planning Department and in a form satisfactory to the City Attorney, shall be recorded with the Office of the Orange County Recorder. A copy of the recorded covenant shall be submitted to the Planning Division of the Planning Department. 97. That approval of Amendment No. 5 to The Disneyland Resort Specific Plan No. 92 -1 is contingent upon the approval and adoption of General Plan Amendment No. 2001 -393. 11/19/01 clercial\ resolutions \staffrep \cr8155conditions.doc page 5 of 5