Loading...
Resolution-ZA 1997-21 DECISION NO. ZA 97-21 A DECISION OF THE ZONING ADMINISTRATOR APPROVING VARIANCE NO. 4320, IN PART OWNER: PBS Building Systems, Inc 155 Riverview Drive Anaheim, CA 92807 AGENT: Don Hertel 151 Calmest Drive, Suite. D-103 Costa Mesa, CA 92626 LOCATION: 155 Riverview Dr'Ne HEARING DATE: October 23, 1997 OPPOSITION: No one indicated their presence at the. public hearing in opposition and no correspondence in opposition was received. REQUEST: Petitioner requests waivers, of the following to construct 844 sq.ft. of useable gross floor area within the existing 3-story office building and to upgrade the parking lot. (a) Sections 18.06.050.0212 - Minimum number of parking spaces. 18.06.080 L required; 79 proposed) 18.12.060.110 and 18.44.066.050 (b) Sections 18.04.060.050 - Required parking lot landscaping. 18.12.060.110 and 18.44.066.030 Having been appointed Zoning Administrator by the Planning Director, pursuant to Anaheim Municipal Code Section 18.12.040, to decide the above-referenced petition and a public hearing having been duly noticed for and held on the date set forth above, I do hereby find: 1. That the parking waiver (a), under the conditions, imposed, will not cause #ewer off-street parking spaces to be provided for such use than the number of such spaces necessary to accommodate all vehicles attributable to such. use. under the normal reasonably foreseeable conditions of operation of such use; 2. That waiver (a), under the conditions imposed, will not increase the demand and competition for parking spaces upon the public streets in the immediate vicinity of the proposed use; 3. That waiver (a), under the conditions imposed, will not increase the demand and competition for parking spaces upon adjacent private property in the immediate vicinity of the proposed use (which property is not expressly provided as parking for such use under an agreement in compliance with Section 18.06.010.020 of this Code); 4. That waiver (a), under the conditions imposed, will not increase traffic congestion; 5. That waiver (a), under the conditions imposed, will. not impede vehicular ingress or egress from adjacent properties upon the public streets in the immediate vicinity of the proposed use; za V4320.wp - 1 of 3 - ZA 97-21 r - • 6. That waiver (a) will not cause an increase in traffic congestion in the immediate vicinity nor adversely affect any adjoining land uses; 7. That waiver (a), under the conditions imposed, will not be detrimental to the peace, health, safety or general welfare of the citizens of the City of Anaheim; and 8. That waiver (b), required parking lot landscaping, is hereby denied on the basis that the need for the waiver was deleted following public advertisement. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS: That the Zoning Administrator has reviewed the proposal for waivers of minimum number of parking spaces and required parking lot landscaping on a 1.34 acre irregularly-shaped property located at the northwest corner of Santa Ana Canyon Road and Riverview Drive, having frontages of approximately 325 feet on the north side of Santa Ana Canyon Road and 390 feet on the southwest side of Riverview Drive, and being located 510 feet east of the centerline of Weir Canyon Road (155 Riverview Drive); and does hereby approve the Negative Declaration upon finding that she has considered the Negative Declaration together with any comments received during the public review process and further finding on the basis of the initial study and any comments received ----that-there-is-no substantial-evidence that the-project will have a significant effect on the-environment. Based on the evidence and testimony presented to me, I do hereby determine to approve Variance No. 4320, in part, subject to the following conditions: 1. That unless proof of exemption is submitted in compliance with City Council Resolution No. 89R- 440 prior to issuance of a building permit, the appropriate major thoroughfare and bridge fee shall be paid to the City of Anaheim in the amount as specified in the major Thoroughfare and Bridge .Fee Program for the Foothill/Eastern Transportation Corridor, as established by City Council resolution. 2. That the applicable traffic signal assessment fee shall be paid to the City of Anaheim in an amount established by City Council Resolution. 3. That the applicable fee shall be paid to the City of Anaheim for Santa Ana Canyon Road widening purposes, in an amount as established by the City Council. 4. That the developer shall pay a traffic and transportation improvement fee to the City of Anaheim, Traffic Engineering Division, in an amount established by the City Council Ordinance/Resolution. This fee will be used to fund traffic and transportation improvements within this area impacted by this project. Said fee shall be subject to adjustment by the City Council. 5. That plans shall be submitted to the City Traffic and Transportation Manager for his review and approval in conformance with the current version of Engineering Standard Plan Nos. 401, 436, 601 /602 and 604 pertaining to parking standards and driveway location. Subject property shall thereupon be developed and maintained in conformance with said plans. 6. That prior to final building and zoning` inspections;; subject property shall be developed substantially in accordance with plans and specifications submitted to the City of Anaheim by the petitioner and which plans are on file with the Planning Department marked Exhibit Nos. 1 and 2, and as conditioned herein. 7. That prior to issuance of a building permit or within a period of one (1) year from the date of this decision, whichever occurs first, Condition Nos. 1, 2, 3, 4 and 5, above-mentioned, shall be complied with. F~ctensions for further time to complete said conditions may be granted in accordance with Section 18.03.090 of the Anaheim Municipal Code. za-V4320.wp -2of3- ZA 97-21 • 8. That approval of this application constitutes approval of the proposed request only to the extent that it complies with the Anaheim Municipal Zoning Code and any other applicable City, State, and Federal regulations. Approval does not include any action or findings as to compliance or approval of the request regarding any other; applicable ordinance, regulation or requirement. This decision is made, signed, and entered into the file this 30th day of October 1997. ~~ ~ ~~ ~ ~~G~~ Annika M. Santalahti Zoning Administrator NOTICE: This decision shall become final unless an appeal to the City Council, in writing, accompanied by an appeal fee, is filed with the City Clerk within 15 davs of the date of the signing of this decision or unless members of the City Council shall request to review this decision within said 15 days. DECLARATION OF SERVICE BY MAIL: I do hereby declare under penalty of perjury that on the date set forth below, I did deposit, in the United States Mail, a copy of the decision to the applicant and did forward a copy to the City Clerk. DATE: October 30, 1997 ~~;~'r^ti Q i ~ '~ Patricia Koral Word Processing Operator G V` za-V4320.wp - 3 of 3 - ZA 97-21