Loading...
83R-464 - RESOLUTION NO. 83R-464 -, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM FINALLY ACCEPTING THE COMPLETION AND THE FURNISaING OF ALL PLANT, LABOR, SERVICES, MATERIALS AND EQUIPMENT AND ALL UTILITIES AND TRANSPORTA~ION INCLUDING POWER, FUEL AND WATER, AND THE PERFORMANCE OF ALL WORK NECESSARY TO CONSTRUCT AND COMPLETE THE FOLLOWING PUBLIC IMPROVEMENT, TO WIT: CONVERSION OF EXISTING STREET LIGHTS FOR HIGH PRESSURE SODIUM LUMINAIRES, IN THE CITY OF ANAHEIM, ACCOUNT NO. Ol-677-6328-l2l7B-37300. WHEREAS, the City Council of the City of Anaheim did cause to be published in a newspaper of general circulation, published and circulated in the City of Anaheim, to wit: The Anaheim Bulletin, on the 2nd and 9th days of September, 1982, a notice inviting sealed proposals for furnishing the following: All plant, labor, services, materials and equipment, and all utilities and transportation, including power, fuel and water, and performing all work necessary to construct and complete in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Engineer or City Clerk of the City of Anaheim, the following public improvement, to wit: Conversion of existing street lights for high pressure sodium luminaires, in the City of Anaheim, consisting of labor and equipment only to install conversion kits or remove existing luminaires and install new/rebuilt lumin- aires to convert existing multiple 120 or 240 incandes- cent and mercury vapor street lights to high pressure sodium. City to furnish conversion kits or new/rebuilt luminaires; with alternate proposals for labor, equipment and material to remove existing multiple luminaires and install new/rebuilt luminaires and install conversion kits for Post Top units or replace Traditionaire lumin- aires with new/rebuilt luminaires, in accordance with the plans and specifications on file in the office of the City Engineer, Account No. Ol-677-6328-l2l7B-37300, in accordance with the designs, plans, profiles and specifications prepared by the Public Works Department, and the notice inviting sealed proposals, which said notice specified that sealed propo- sals as specified in said notice would be received up until 2:00 o'clock P.M. on the 30th day of September, 1982, and which said notice did state and declare that, pursuant to the provisions of Section 1770 of the Labor Code, the City Council of the City of Anaheim had ascertained the prevailing rate of wages for each type of labor needed to execute said contract, and did state that the prevailing hourly wage scale so ascertained was on file in the Office of the City Clerk; and ........-.c..~_ - WHEREAS, on the 30th day of September, 1982, at the hour of 2:00 o'clock P.M., the City Clerk and the City Engineer of the City of Anaheim did open said sealed proposals received up to that time for the furnishing of all plant, labor, services, materials and equipment, and all utilities and transportation, including power, fuel and water, and performing all work necessary to con- struct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, the public improvement hereinabove more particularly described and set forth, in public, in the City Council Chamber in the City Hall, Anaheim, California, and the City Engineer did tabulate the result of said sealed proposals and did make a report to the City Council at a meeting held no later than thirty (30) days after the bids were opened; and WHEREAS, the City Council of the City of Anaheim did, at a subsequent regular or adjourned regular meeting, held on the 26th day of October, 1982, at the hour of 1:30 o'clock P.M., con- sider the sealed proposals submitted for furnishing the materials and performing the work hereinabove more particularly described and set forth, and did thereupon find and determine that the sealed proposal submitted by SIERRA PACIFIC ELECTRICAL, 2542 Avalon Street, Riverside, California 92509,for the construction, installation and completion of said conversion of existing street lights for high pressure sodium luminaires, in the City of Anaheim, Account No. Ol-677-6328-l2l7B-37300 hereinabove mentioned and described, was the lowest responsible proposal submitted therefor, and thereupon accepted said bid and did award a contract to said contractor for furnishing all plant, labor, services, materials and equipment and all utilities and transportation, including power, fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings, the said public improvement as specified in said notice inviting sealed proposals, and did authorize the Mayor and the City Clerk of the City of Anaheim to execute a contract for and on behalf of the City of Anaheim with said contractor, which said contract was duly made and entered into on the 9th day of December, 1982; and WHEREAS, the said contractor has furnished all plant, labor, services, materials and equipment and all utilities and transportation, and performed all work necessary for the construc- tion and completion, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings of said public improvement as specified in the notice inviting sealed pro- posals and in the detailed designs, plans, drawings and specifica- tions prepared by the Public Works Department, and the contract made and entered into with said contractor by the City of Anaheim; and -2- ---....,... WHEREAS, the Public Works Executive Director has duly certified to the construction and completion of said public improvement hereinabove mentioned and described, in accordance with the plans and specifications and the contract documents duly made and entered into with said contractor; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinabove more particularly described in accordance with the provisions of the contract and the contract documents, and that notice of completion should be filed and payment of the balance due said contractor authorized in accordance with the contract documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that all plant, labor, services, materials and equipment and all utilities and transportation, and the perform- ance of all work necessary to construct, install and complete in a good and workmanlike manner, in strict accordance with the speci- fications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, together with the appurten- ances thereto, said public improvement hereinabove more particu- larly described and set forth, in the City of Anaheim, by said contractor~ be, and the same are hereby, accepted subject, never- theless, to all the 'terms, conditions and provisions of the con- tract documents, and that the balance due said contractor for said work be paid to said contractor thirty-five (35) days from and after final acceptance of said work as evidenced by the adoption of this resolution, but not sooner than thirty (30) days after the date of the filing of notice of completion, excepting only such sum or sums as may lawfully be withheld in accordance with the provisions of said contract and contract documepts. That accept- ance by the contractor of said payments made in accordance with said final estimate shall operate and shall be a release to the City of Anaheim, its officers, agents and employees from all claims and liabilities due the contractor for anything done or furnished or withhelp or for anything relating to the work or any act or neglect of the City, its officers, agents and employees, excepting only claims against the City for amounts withheld by the City at the time of such payment. AND BE IT FURTHER RESOLVED that the Mayor be, and he is hereby, authorized to execute and file a notice of completion of said work as required by law. THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this 6th day of December, 1983. ~~~ ATTEST: ~~...)~.~ TY LERK OF TH CI ANAHEIM /fm l765M 11/29/83 -3- STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SSe CITY OF ANAHEIM ) I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 83R-464 was introduced and adopted at a regular meeting provided by law, of the City Council of the City of Anaheim held on the 6th day of December, 1983, by the following vote of the members thereof: AYES: COUNCIL MEMBERS: Kaywood, Bay, Overholt and Roth NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Pickler AND I FURTHER certify that the Mayor of the City of Anaheim signed said Resolution No. 83R-464 on the 6th day of December, 1983. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 6th day of December, 1983. ~.J_~~77/ CITY ERK OF THE CITY OF ANAHEIM (SEAL) I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original of Resolution No. 83R-464 duly passed and adopted by the An~heim City Council on December 6, 1983. ~ .Lu,f)~ CITY CL RK -,