84R-183
RESOLUTION NO. 84R-183
A RESOLUTI=N OF THE CITY COUNCIL OF THE CITY OF
ANAHEIM FI ALLY ACCEPTING THE COMPLETION AND
THE FURNIS ING OF ALL PLANT, LABOR, SERVICES,
MATERIALS ~D EQUIPMENT AND ALL UTILITIES AND
TRANSPORTA~ION INCLUDING POWER, FUEL AND WATER,
AND THE PERFORMANCE OF ALL WORK NECESSARY TO
CONSTRUCT ~D COMPLETE THE FOLLOWING PUBLIC
IMPROVEMEN~, TO WIT:
CENTRAL MEQHANICAL MAINTENANCE FACILITY, IN THE
CITY OF AN~EIM, ACCOUNT NO. 72-721-6325.
WHEREAS, tqe City Council of the City of Anaheim did cause
to be published in ~ newspaper of general circulation, published
and circulated in t~e City of Anaheim, to wit: The Anaheim
Bulletin, on the 9tq and 16th days of September, 1982, a notice
inviting sealed proposals for furnishing the following:
All plant, labo~, services, materials and equipment, and
all utilities aqd transportation, including power, fuel
and water, and performing all work necessary to construct
and complete ina good and workmanlike manner, in strict
accordance with the specifications, plans and drawings
therefor on file in the Office of the City Engineer or
City Clerk of tqe City of Anaheim, the following public
improvement, to wit:
Central mechaniqal maintenance facility, in the City of
Anaheim, consisting of furnishing all labor and materials
necessary for t~e construction of a Central Mechanical
Maintenance Faci!lity. The work includes, but is not
limited to, sit~ work, concrete masonry structure, roof-
ing, electrical, mechanical, air conditioning: mechanical
maintenance equ~pment and off-site improvements of
asphalt concrete paving, concrete curb and gutter and
alley and R.C.P. storm drain. All work shall be per-
formed in accor~ance with the plans and specifications
for this project on file in the office of the City
Engineer, Account No. 72-721-6325,
~
in accordance with ~he designs, plans, profiles and specifications
prepared by the Pub~ic Works Department, and the notice inviting
sealed proposals, w~ich said notice specified that sealed propo-
sals as specified iQ said notice would be received up until 2:00
o'clock P.M. on the 30th day of September, 1982, and which said
notice did state and declare that, pursuant to the provisions of
Section 1770 of the Labor Code, the City Council of the City of
Anaheim had ascertained the prevailing rate of wages for each type
of labor needed to ~xecute said contract, and did state that the
prevailing hourly w~ge scale so ascertained was on file in the
Office of the City Clerki and
".-
WHEREAS, on the 30th day of September, 1982, at the hour
of 2:00 o'clock P.M., the City Clerk and the City Engineer of the
City of Anaheim did open said sealed proposals received up to that
time for the furnish~ng of all plant, labor, services, materials
and equipment, and a[l utilities and transportation, including
power, fuel and wate~, and performing all work necessary to con-
struct and complete, in a good and workmanlike manner, in strict
accordance with the ~pecifications, plans and drawings therefor on
file in the Office elf the City Clerk of the City of Anaheim, the
public improvement hereinabove more particularly described and set
forth, in public, in the City Council Chamber in the City Hall,
Anaheim, California, and the City Engineer did tabulate the result
of said sealed propqsals and did make a report to the City Council
at a meeting held nO later than thirty (30) days after the bids
were opened: and
WHEREAS, the City Council of the City of Anaheim did, at
a subsequent regular or adjourned regular meeting, held on the 2nd
day of November, 1982, at the hour of 10:00 o'clock A.M., consider
the sealed proposals submitted for furnishing the materials and
performing the work hereinabove more particularly described and
set forth, and did thereupon find and determine that the sealed
proposal submitted qy J. A. STEWART CONSTRUCTION COMPANY, 7125
Fenwick Lane, Suite 0, Westminster, California 92683 for the con-
struction, installation and completion of said central mechanical
maintenance facilit~, in the City of Anaheim, Account No.
72-721-6325 hereinaaove mentioned and described, was the lowest
responsible proposal submitted therefor, and thereupon accepted
said bid and did aw~rd a contract to said contractor for furnish-
ing all plant, labor, services, materials and equipment and all
utilities and transportation, including power, fuel and water, and
performing all work necessary to construct and complete, in a good
and workmanlike manner, in strict accordance with the specifica-
tions, plans and dr~wings, the said public improvement as
specified in said notice inviting sealed proposals, and did auth-
orize the Mayor and the City Clerk of the City of Anaheim to
execute a contract for and on behalf of the City of Anaheim with
said contractor, which said contract was duly made and entered
into on the 22nd day of November, 1982: and
WHEREAS, t~e said contractor has furnished all plant,
labor, services, ma~erials and equipment and all utilities and
transportation, and performed all work necessary for the construc-
tion and completion, in a good and workmanlike manner, in strict
accordance with the specifications, plans and drawings of said
public improvement as specified in the notice inviting sealed pro-
posals and in the detailed designs, plans, drawings and specifica-
tions prepared by the Public Works Department, and the contract
made and entered into with said contractor by the City of Anaheim:
and
WHEREAS, the Public Works Executive Director has duly
certified to the construction and completion of said public
improvement hereina~ove mentioned and described, in accordance
with the plans and ~pecifications and the contract documents duly
made and entered into with said contractori and
-2-
WHEREAS, the City Council finds that said contractor has
completed said public improvement hereinabove more particularly
described in accordance with the provisions of the contract and
the contract documents, and that notice of completion should be
filed and payment of the balance due said contractor authorized in
accordance with the contract documents.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Anaheim that all plant, labor, services, materials and
equipment and all utilities and transportation, and the perform-
ance of all work necessary to construct, install and complete in a
good and workmanlike manner, in strict accordance with the speci-
fications, plans and drawings therefor on file in the Office of
the City Clerk of the City of Anaheim, together with the appurten-
ances thereto, said public improvement hereinabove more particu-
larly described and set forth, in the City of Anaheim, by said
contractor, be, and the same are hereby, accepted subject, never-
theless, to all the terms, conditions and provisions of the
contract documents, and that the balance due said contractor for
said work be paid to said contractor thirty-five (35) days from
and after final acceptance of said work as evidenced by the
adoption of this resolution, but not sooner than thirty (30) days
after the date of the filing of notice of completion, excepting
only such sum or su~ as may lawfully be withheld in accordance
with the provisions of said contract and contract do~uments. That
acceptance by the contractor of said payments made in accordance
with said final estimate shall operate and shall be a release to
the City of Anaheim, its officers, agents and employees from all
claims and liabilities due the contractor for anything done or
furnished or withheld or for anything relating to the work or any
act or neglect of the City, its officers, agents and employees,
excepting only claims against the City for amounts withheld by the
City at the time of such payment.
AND BE IT FURTHER RESOLVED that the Mayor be, and he is
hereby, authorized tb execute and file a notice of completion of
said work as requireQ by law.
THE FOREGOING RESOLUTION is approved and adopted by the
City Council of the City of Anaheim thi 2nd day of May, 1984.
ATTE~ /)( ~~
CITY CL~THE CI OF ANAHEIM
/fm
2536M
5/14/84
-3-
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, LEONORA N. SOHL, City C1e~k of the City of Anaheim, do hereby certify that
the foregoing Resolution No. 84R-183 was introduced and adopted at a regular
meeting provided by law, of the City Council of the City of Anaheim held on
the 22nd day of May, 1984, by the following vote of the members thereof:
-
AYES: COUNCIL MEMBERS: Kaywood, Bay, Overholt, Pickler and Roth
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
AND I FURTHER certify that the Mayor of the City of Anaheim signed said
Resolution No. 84R-183 on the 22nd day of May, 1984.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the
City of Anaheim this 22nd day of May, 1984.
~4-~~
CITY CLERK OF THE CITY OF ANAHEIM
( SEAL )
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that
the foregoing is the original of Resolution No. 84R-183 duly passed and
adopted by the Anaheim City Council on May 22, 1984.
~~/(~
CITY CLERK
,...,__.___ ,,-..._~d"~~_ ....