84R-128
RESOLUTION NO. 84R-128
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ANAHEIM FINALLY ACCEPTING THE COMPLETION AND
THE FURNISHING OF ALL PLANT, LABOR, SERVICES,
MATERIALS AND EQUIPMENT AND ALL UTILITIES AND
TRANSPORTATION INCLUDING POWER, FUEL AND WATER,
AND THE PERFORMANCE OF ALL WORK NECESSARY TO
CONSTRUCT AND COMPLETE THE FOLLOWING PUBLIC
IMPROVEMENT, TO WIT:
UTILITIES SERVICE CENTER MATERIAL STORAGE AREA
PAVING, S/O SOUTH STREET, IN THE CITY OF
ANAHEIM, ACCOUNT NOS. 5l-699-6329-0957M-37l0A
AND 55-699-6329-0957M-3900A
WHEREAS, the City Council of the City of Anaheim did
cause to be published in a newspaper of general circulation,
published and circulated in the City of Anaheim, to wit: The
Anaheim Bulletin, on 8th and l5th days of September, 1984, a
notice inviting sealed proposals for furnishing the following:
All plant, labor, services, materials and equipment, and
all utilities and transportation, including power, fuel
and water, and performing all work necessary to construct
and complete in a good and workmanlike manner, in strict
accordance with the specifications, plans and drawings
therefor on file in the Office of the City Engineer or
City Clerk of the City of Anaheim, the following public
improvement, to wit:
Utilities Service Center material storage area paving,
258' south of South Street to 500' south of South Street,
east side of service road, in the City of Anaheim,
consisting of excavation; removal of curb and gutter;
construction of P.C.C. gutter; construction of asphalt
concrete; construction of base material; construction of
3" x 6" redwood headeri removal of rubble pilei and
appurtenant work as shown on the plans and delineated in
the specifications on file in the office of the City
Engineer, Account Nos. 5l-699-6329-0957M-37l0A and
55-699-6329-0957M-3900A,
in accordance with the designs, plans, profiles and specifications
prepared by the Public Works Department, and the notice inviting
sealed proposals, which said notice specified that sealed
proposals as specified in said notice would be received up until
2:00 o'clock P.M. on the 29th day of September, 1984, and which
said notice did state and declare that, pursuant to the provisions
of Section l770 of the Labor Code, the City Council of the City of
Anaheim had ascertained the prevailing rate of wages for each type
of labor needed to execute said contract, and did state that the
prevailing hourly wage scale so ascertained was on file in the
Office of the City Clerk; and
'-."',"'" ."......_.,~_._..,.,_.._-_.'=,
WHEREAS, on the 29th day of September, 1983, at the hour
of 2:00 o'clock P.M., the City Clerk and the City Engineer of the
City of Anaheim did open said sealed proposals received up to that
time for the furnishing of all plant, labor, services, materials
and equipment, and all utilities and transportation, including
power, fuel and water, and performing all work necessary to
construct and complete, in a good and workmanlike manner, in
strict accordance with the specifications, plans and drawings
therefor on file in the Office of the City Clerk of the City of
Anaheim, the public improvement hereinabove more particularly
described and set forth, in public, in the City Council Chamber in
the City Hall, Anaheim, California, and the City Engineer did
tabulate the result of said sealed proposals and did make a report
to the City Council at a meeting held no later than thirty (30)
days after the bids were opened; and
WHEREAS, the City Council of the City of Anaheim did, at
a subsequent regular or adjourned regular meeting, held on the
29th day of September, 1983, at the hour of 10:00 o'clock A.M.,
consider the sealed proposals submitted for furnishing the
materials and performing the work hereinabove more particularly
described and set forth, and did thereupon find and determine that
the sealed proposal submitted by GUTIERREZ CONSTRUCTION COMPANY,
9209 poinsettia Avenue, Fountain Valley, California 91708, for the
construction, installation and completion of said Utilities
Service Center Material Storage Area paving, south of South
Street, in the City of Anaheim, Account Nos. 51-699-6329-0957M-
3710A and 55-699-6329-0957M-3900A hereinabove mentioned and
described, was the lowest responsible proposal submitted therefor,
and thereupon accepted said bid and did award a contract to said
contractor for furnishing all plant, labor, services, materials
and equipment and all utilities and transportation, including
power, fuel and water, and performing all work necessary to
construct and complete, in a good and workmanlike manner, in
strict accordance with the specifications, plans and drawings, the
said public improvement as specified in said notice inviting
sealed proposals, and did authorize the Mayor and the City Clerk
of the City of Anaheim to execute a contract for and on behalf of
the City of Anaheim with said contractor, which said contract was
duly made and entered into on the 23rd day of November, 1983; and
WHEREAS, Gutierrez Construction Company failed to perform
the contract; and
WHEREAS, on the 31st day of January, 1984, the City
Council of the City of Anaheim adopted Resolution No. 84R-42
rescinding the contract with Gutierrez Construction Company for
the above-described public improvement; and
WHEREAS, on the 3lst day of January, 1984, the City
Council of the City of Anaheim adopted Resolution No. 84R-43
awarding the contract for the above-described public improvement
to the second lowest most responsible bidder, R. J. NOBLE COMPANY,
l5505 East Lincoln Avenue, Post Office Box 620, Orange, California
92666; and
-2-
"_"""",~_,,-,."_...L......~._,,_,...,~,,,-...,"....____
WHEREAS, the contract was duly made and entered into on
the 15th day of February, 1984; and
WHEREAS, R. J. Noble Company has furnished all plant,
labor, services, materials and equipment and all utilities and
transportation, and performed all work necessary for the
construction and completion, in a good and workmanlike manner, in
strict accordance with the specifications, plans and drawings of
said public improvement as specified in the notice inviting sealed
proposals and in the detailed designs, plans, drawings and
specifications prepared by the Public Works Department, and the
contract made and entered into with said contractor by the City of
Anaheim; and
WHEREAS, the Public Works Executive Director has duly
certified to the construction and completion of said public
improvement hereinabove mentioned and described, in accordance
with the plans and specifications and the contract documents duly
made and entered into with said contractor; and
WHEREAS, the City Council finds that said contractor has
completed said public improvement hereinabove more particularly
described in accordance with the provisions of the contract and
the contract documents, and that notice of completion should be
filed and payment of the balance due said contractor authorized in
accordance with the contract documents.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Anaheim that all plant, labor, services, materials and
equipment and all utilities and transportation, and the
performance of all work necessary to construct, install and
complete in a good and workmanlike manner, in strict accordance
with the specifications, plans and drawings therefor on file in
the Office of the City Clerk of the City of Anaheim, together with
the appurtenances thereto, said public improvement hereinabove
more particularly described and set forth, in the City of Anaheim,
by said contractor, be, and the same are hereby, accepted subject,
nevertheless, to all the terms, conditions and provisions of the
contract documents, and that the balance due said contractor for
said work be paid to said contractor thirty-five (35) days from
and after final acceptance of said work as evidenced by the
adoption of this resolution, but not sooner than thirty (30) days
after the date of the filing of notice of completion, excepting
only such sum or sums as may lawfully be withheld in accordance
with the provisions of said contract and contract documents. That
acceptance by the contractor of said payments made in accordance
with said final estimate shall operate and shall be a release to
the City of Anaheim, its officers, agents and employees from all
claims and liabilities due the contractor for anything done or
furnished or withheld or for anything relating to the work or any
act or neglect of the City, its officers, agents and employees,
excepting only claims against the City for amounts withheld by the
City at the time of such payment.
-3-
'_'.~,~>o..~_...__.,,,,,,,,,,;_.,,,,..,' ._
AND BE IT FURTHER RESOLVED that the Mayor be, and he is
hereby, authorized to execute and file a notice of completion of
said work as required by law.
THE FOREGOING RESOLUTION is approved and adopted by the
City Council of the City of Anaheim this 3rd day of April, 1984.
ATTEST:
C~
/fm
2325M
3/28/84
ANAHEIM
-4-
- .".~"",.,...-",-,,_.~;-,.,"
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, LINDA D. ROBERTS, City Cl~rk of the City of Anaheim, do hereby certify that
the foregoing Resolution No.; 84R-l28 was introduced and adopted at a regular
meeting provided by law, of the City Council of the City of Anaheim held on
the 3rd day of April, 1984, by the following vote of the members thereof:
^---....,
AYES: COUNCIL MEMBERS: Kaywood, Bay, Overholt, Pickler and Roth
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
AND I FURTHER certify that the Mayor of the City of Anaheim signed said
Resolution No. 84R-128 on th~ 3rd day of April, 1984.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the
City of Anaheim this 3rd day of April, 1984.
06.r-J4-7~
CITY CLERK OF THE CI OF ANAHEIM
(SEAL)
I, LINDA D. ROBERTS, City CLerk of the City of Anaheim, do hereby certify that
the foregoing is the origin~l of Resolution No. 84R-128 duly passed and
adopted by the Anaheim City Council on April 3, 1984.
~~
--
""""..."=.._-~".