80R-201
RESOLUTION NO. 80R-201
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM FINALLY ACCEPTING THE COMPLETION
AND THE FURNISHING OF ALL PLANT, LABOR, SER-
VICES, MATERIALS AND EQUIPMENT AND ALL UTIL-
ITIES AND TRANSPORTATION INCLUDING POWER,
FUEL AND WATER, AND THE PERFORMANCE OF ALL
WORK NECESSARY TO CONSTRUCT AND COMPLETE THE
FOLLOWING PUBLIC IMPROVEMENT, TO WIT:
CERRITOS AVENUE-STATE COLLEGE BOULEVARD STREET
IMPROVEMENT, IN THE CITY OF ANAHEIM, ACCOUNT
NO. 12-793-6325-3110, A.H.F.P. NOS. 941 & 942.
WHEREAS, the City Council of the City of Anaheim did
cause to be pUblished in a newspaper of general circulation
printed, published and circulated in the City of Anaheim, to wit:
The Anaheim Bulletin, on the 11th and 18th d~S of October
, 19~, a not ce inviting sealed
proposals for furnishing the following:
All plant, labor, services, materials and equipment,
and all utilities and transportation, including power,
fuel and water, and performing all work necessary to
construct and complete in a good and workmanlike man-
ner, in strict accordance with the specifications,
plans and drawings therefor on file in the Office of
the City Engineer or City Clerk of the City of Anaheim,
the fOllowing public improvement, to wit:
Cerritos Avenue from State College Blvd. to 350' W/o;
State Colleve Blvd. from Cerritos Avenue to 325' S/o
Cerritos Ave. street imDrovement, in the City of
Anaheim, consisting of clearing and grubbing, excava-
tion, construction of P.C.C. curb and gutter, sidewalk,
driveway and access ramD, construction of base material
and A.C. pavement, construction of irrigation line,
irrigation pump house, modification of irrigation pump
and apnurtenances, modification of traffic signalization,
and appurtenant work in accordance with the plans and
delineated in the sDecifications on file in the Office
of the City Ensineer, Account No. 12-793-6325~3110,
A.H.F.P. Nos. 941 & 942,
in accordance with the designs, plans, profiles and specifica-
tions prepared by th~ Public WorkR n~pRrtm~nt ,
and the notice inviting sealed proposals, which said notice
ATT-40
-1-
specified that se3led proposals as speci I i cd in said notice
would be received up until 2:00 o'clock P.t1. of the 1st
day of N~verber , 19~, and which said notice~id -
state and ec are that, pursuant to the nrovisions of Section
1770 of the Labor ~ode, the City Council of the City of Anahej~,
had ascertained the prevailing rate of w~r.es for each type of
labor needed to execute said contract, 3nd did state that the
prevailing hourly wage scale so ascertained was on file in the
Office of the City ~lerk; 3nd
WHEREAS, on November 1 , 1979 ,at the hour
of 2:00 o'clock P.M., the City Clerk and t1icCity Engineer
of the City of Anaheim did open said sea 1 ed proposals recei v('d
up to that time for the furnishing of all plant, labor, services,
materials and equipment, and all utilities and transportation,
including pmver, fuel and water, and performing all work nec('ssarv
to construct and complete, in a good and workmanlike manner, in
strict accordance with the specifications, plans and drawings
therefor on file in the Office of the City Clerk of the City of
Anaheim, the public improvement hereinabove more particularly
described and set forth, in public, in the City Council Chamber
in the City Hall, Anaheim, California, and th~ City Engineer did
tabulate the result of said sealed proposals and did make a report
to the City Council at its ~Rax~a6~~~~~~egular meeting; and
WHEREAS, the C~t3 Council of the City of Anaheim did,
at its ~22x~~2~~~~~I~gular meeting, held on the 13th day
of JJonember ' 191.9.-, at the hour of 1:30 o'clock P.M
consi er tne seaTed proposals submitted for furnishing the
materials and performing the work hereinabove more particularly
described and set forth, and did thereupon find and determine
that the sealed proposal submitted by J.E.G. CONSTRUCTION COMPANY,
INC.. Post Office Box 652, Walnut, California 91789
. for the construction, installation and completion of said
Cerritos Avenue-State College Boulevard street improvement ;-In-the
City of Anaheim. Account No. 12-793-6325-3110, A.H.P.P. Nos. 941 &
942,
hereinabove mentioned and
described, was the lowest responsible proposal submitted there-
for, and thereupon accepted said bid and did award a contract
to said contractor for furnishing all plant, labor, services,
materials and equipment and all utilities and transportation,
including power, fuel and water, and performing all work neces-
sary to construct and complete, in a good and workmanlike man-
ner, in strict accordance with the specifications, plans and
drawings, the said public improvement as specified in said
notice inviting sealed proposals, and did authorize the Mayor
and the City Clerk of the City of Ana~eim to execute a contract
for and on behalf of the City of Anaheim with said contractor,
which said contract was duly male and entered into on the 27th
day of November , 19_7~; and
WHEREAS, the said contractor has furnished all plant,
labor; services, materials and equipment and all utilities and
transportation, and performed all work necessary for the con-
struction and completion, in a good and workmanlike manner, in
-2-
ATT-40
strict accordance with the specifications, plans and drawings
of said public improvement as specified in the notice inviting
sealed proposals and in the detailed designs, plans, drawings
and specifications prepared by th~ P~bli~ Work~ npr~r5mpnr
, an the contract ma e and
entered into with said contractor by the City of Anaheim; and
WHEREAS, the Public Wor~s Exe~utive Di~ecto1
has duly certified to the constructlon an completlon 0 said
public improvement hereinabove mentioned and described, in
accordance with the plans and specifications and the contract
documents duly made and entered into with said contractor; and
WHEREAS, the City Council finds that said contractor
has completed said public improvement hereinabove more particu-
larly described in accordance with the provisions of the con-
tract and the contract documents, and that notice of completion
should he filed and payment of the balance due said contractor
authorized in accordance with the contract documents.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Anaheim that all plant, labor, services, materials
and equipment and all utilities and transportation, and the per-
formance of all work necessary to construct, install and com-
plete in a good and workmanlike manner, in strict accordance
with the specifications, plans and drawings therefor on file in
the Office of the City Clerk of the City of Anaheim, together
with the appurtenances thereto, said public improvement herein-
above more particularly described and set forth, in the City of
Anaheim, by said contractor, be, and the same are hereby, accepted
subject, nevertheless, to all the terms, conditions and provi-
sions of the contract documents, and that the balance due said
contractor for said work be paid to said contractor thirty-five
(35) days from and after final acceptance of said work as evi-
denced by the adoption of this resolution, but not sooner than
thirty (30) days after the date of the filing of notice of com-
pletion, excepting only such sum or sums as may lawfully he
withheld in accordance with the provisions of said contract and
contract documents. That acceptance by the contractor of said
payments made in accordance with said final estimate shall op~r-
ate and shall be a release to the City of Anaheim, its officers,
agents and employees from all claims and liabilities due the
contractor for anything done or furnished or withheld or for any-
thing relating to the work or any act or neglect of the City, its
officers, agents and employees, excepting only claims against
the City for amounts withheld by the City at the time of such
payment.
AND BE IT FURTHER RESOLVED that the Mayor be, and he
is hereby, authorized to execute and file a notice of completion
of said work as required by law.
-3-
A, T-40
!
by the
MRY
THE FOREGOING RESOLUTION is approved and adopted
City Council of the City of Anaheim this 6th day of
, 19 --S.a /"7
I
M
ATTEST: LINDA D. ROBERTS, CITY C\J:RK
I
h%F1~~~
A!fAHEIM
DEPUTY
Ifm
. -,........."..,_.-,..; ........,
'J_,'," ..",+ "_""'-'~<'~~'..'.h'_~,___~n",'., __~-...-. ..._M.
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) S6.
CITY OF ANAHEIM )
I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that
the foregoing Resolution No. 80R-201 was introduced and adopted at a regular
meeting provided by law, of the City Council of the City of Anaheim held on
the 6th day of May, 1980, by the following vote of the members thereof:
AYES: COUNCIL MEMBERS: Overholt, Kaywood, Bay, Roth and Seymour
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
AND I FURTHER CERTIFY that the Mayor of the City of Anaheim signed said
Resolution No. 80R-201 on the 6th day of May, 1980.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the
City of Anaheim this 6th day of May, 1980.
LINDA D. ROBERTS, CITY CLERK
BY ~~cL1J 54
(SEAL)
I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that
the foregoing is the original of Resolution No. 80R-201 duly passed and adopted
by the Anaheim City Council on May 6, 1980.
LINDA D. ROBERTS, CITY CLERK
BY ~~c21~ -