Attachment 2 - Project Description and Operational LetterChildtime # 209
1004 S. State College Blvd.
APN. 253-181-42
Proposed Project Description:
Learning Care Group proposes to construct a new 2,046 SF building in an existing landscape area at an
existing church. This will provide (2) new classrooms. Classroom 1 will be for 24 Pre-K children ages 3-4
with two staff members. Classroom 2 will be for 28 school age children ages 5-12 with two staff
members The proposal also includes a 3,712 SF new artificial turf area with (2) play yards and
playground equipment to be installed. The existing day care use occupies a 6,866 SF building. The
original CUP, CUP 1993, was approved on June 18, 1979. This proposal will include a request to modify
hours of operation from 7 am to 6 pm, to 6:30 am to 9 pm. The CUP indicates approval of 111 students
(+ 49 ROP students), we would like to have a total number of 160 students.
Those additional students will be placed in the two new classrooms proposed. The school has 10 drop
off and pick up parking stalls located in the south parking lot with a total of 87 parking spaces. These
spaces are adjacent to the school and are utilized throughout the day for pickup and drop off beginning
at 6:30am and concluding at 9pm. Including staff, there is a maximum requirement of 44 cars in the
south parking lot for the Childtime use.
There are various church activities that occur during the week and the entire east side parking lot is
used for this away from the new building with a total of 80 parking spaces. Please see 209 AUMC CT
schedule table A for a breakdown of activities. Different church related activities throughout the week
9am-3pm, and 6pm-8pm and using a maximum of 50 parking spaces. There are some night activities
that start at 6pm-8pm. All these activities are on the opposite side of the campus from the Childtime
daycare.
The proposal includes a new playground attached to the new school building. This will include two play
structures and artificial turf. Additional landscaping is proposed around the new school building.
The total number of required parking spaces for the church is 160. This number is based on the
maximum attendance for a holiday church service with typical weekly attendance of 110 people.
Attachment No. 2