Item No. 2 - DEV2019-00014 Revised Project Description04/24/23
Child�me # 209
1004 S. State College Blvd.
APN. 253-181-42
Proposed Project Descrip�on:
Learning Care Group proposes to construct a new 2,301 SF building in an exis�ng landscape area at an
exis�ng church. This will provide (2) new classrooms. Classroom 1 will be for 24 Pre-K children ages 3-4
with two staff members. Classroom 2 will be for 28 school age children ages 5-12 with two staff
members The proposal also includes a 3,712 SF new ar�ficial turf area with (2) play yards and
playground equipment to be installed. The exis�ng day care use occupies a 6,866 SF building. The
original CUP, CUP 1993, was approved on June 18, 1979.
This proposal will include a request to modify hours of opera�on. Exis�ng hours of opera�on are from
7:00 am to 6:00 pm Monday through Friday. Proposed hours of opera�on are from 6:30 am to 9:00 pm
Monday through Saturday.
The CUP indicates approval of 111 students (+ 49 ROP students), we would like to have a total number
of 160 students. Those addi�onal students will be placed in the two new classrooms proposed. The
school has drop off and pick up parking stalls located in the south parking lot (total of 85 parking spaces)
adjacent to the school that are u�lized throughout the day for pickup and drop off beginning at 6:30am
and concluding at 9pm. Including staff there is a maximum of 25 cars in the south parking lot that the
Child�me u�lizes.
There are various church ac�vi�es that occur during the week and the en�re east side parking lot is
used for this away from the new building with a total of 85 parking spaces. Please see 209 AUMC CT
schedule table A for a breakdown of ac�vi�es. Different church related ac�vi�es throughout the week
9:00am-3:00pm, and 6:00pm-8:00pm and using a maximum of 50 parking spaces. There are some night
ac�vi�es that start at 6:00pm-8:00pm. All these ac�vi�es are on the opposite side of the campus from
the Child�me.
The proposal includes a new playground atached to the new school building. This will include two play
structures and ar�ficial turf. Addi�onal landscaping is proposed around the new school building.
The total number of required parking spaces is 160 based on the maximum atendance for a holiday
church service.
Revised Project Description
Received April 24, 2023