Loading...
150 S MAGNOLIA AVE BLDG 1Branco 74054 San Marino Circle Palm Desert, Ca 92260 Mobile (949) 264-3199 PROJECT NAME Soft -Story Seismic Retrofit ADDRESS 150 S. Magnolia Ave. Anaheim, CA 92804 Building #1 ARCHITECT Engtegrity ENGINEER Micheal O'Brien CONTRACTOR Concrete West Construction, INC OTHER Nolasco Welding Services INSPECTION DATE 3/25/21 PLAN FILE/OTHER City BLDG. PERMIT/OTHER Bldg 2019-05868 INSPECTION REPORT INSPECTION ❑ CONCRETE ❑ REINF. STEEL ❑ MASONRY ❑ P.T. CONCRETE ❑ FIELD WELDING ❑ SHOP WELDING ❑ BATCH PLANT ❑ EXP. ANCHOR ✓❑ OTHER Epoxy PAGE 1 OF 1 JOB NO. REPORT NO. MATERIAL IDENTIFICATION CONC. MIX NO. & Ib/int GROUT MIX NO. & Ib/int MORTAR TYPE & Ib/int REINF. STEEL GR./SIZE STRUCTURALSTEEL HIGH-STRENGTH BOLT MASONRY BLOCK OTHER MATERIAL SAMPLING ❑ CONCRETE ❑ MORTAR ❑ GROUT ❑ FIREPROOFING ❑ MASONRY BLOCK ❑ REINFORCING STEEL ❑ STRUCTURAL STEEL ❑ BOLTS ❑ OTHER INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS PLEASE NOTE ANY RE -INSPECTION, TESTING, OR OTHER PROJECT ISSUES. Arrived on job site on time as requested to perform observation/inspection of : Epoxy process of of #4 dowel T&B with 6"embedment into existing footing at shear wall footing extension@ A6 AND A7 of building 1. Holes were wire brushed clean and blown out with compressed air. Hilti Hit-HY epoxy was used. Work for today is complete and over all work is in progress. . 41 w lm `e Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications. PRINTED NAME Antonio Miranda Time Charge 4 hrs CERTIFICATION NO. SI R2019-00048 SIGNATURE Superintendent Cody Wienke �Wia,