Loading...
549 S ANAHEIM BLVD (15)1 Permit Types BLD ELE MEC PLM X X Permit Number: BLD2017-03512 Issued: 02/27/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 84 .Site'Address: 549 S ANAHEIM BLVD :L 9A[Desciription: N TR 212 LOT 33 Project Description: Light Poles: (6) for Leisuretown. REF:BLD2017-01129 People Associated with Project: CI 200 SMANAHEIMsBL (714) 765 - 5153 EIM Valuation: $7,200.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof NO Total Fees paid for Permit: 952.95 Contractor C B KENNER INC P O BOX 4050 DANA POINT CA 92629 0000 Permit Applicant CHAD KENNER Engineer MICHAEL P BOHN 245 E THIRD STREET LONG BEACH CA 90802 Engineer TAREK A HOBALLAH 2600 E. PACIFIC COAST HWY., SUITE 170 LONG BEACH CA 90804 Engineer GREGORY R SCHNACKEL 3035 SOUTH 72ND STREET OMAHA NE 68124 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Pole Light (with one fixture) 6 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit combo City of Anaheim Building Division Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) rns COA/Migation Measures _2aryj Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinE/Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hack Sewer Water Engineering Backflow (Testable Only) Water Service