Loading...
559 S ANAHEIM BLVD (6)Permit Types BLD ELE MEC PLM X I X Permit Number: BLD2017-01197 Issued: 02/27/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 84 ..Site'Address: 55.9 S ANAHEIM BLVD Lie gal�' escription: VINEYARD LOTS LOT G-4 N 104.94 FT S 200 SMANAHEIMsBL (714) 765 - 5153 EIM Project Description: Trash Enclosure: 18 In.ft. X 14 ft. high CMU wall - trash enclosure for "LEISURETOWN" shell improvement. REF: BLD2017-01195 Bldg. D People Associated with Project: Owner FRANCES I BESHEARS TR Engineer MICHAEL P BOHN Engineer TAREK A HOBALLAH Engineer GREGORY R SCHNACKEL Contractor C B KENNER INC Permit Applicant CHAD KENNER Number of Stories 1 Valuation: $10,000.00 Construcion Types: VB, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 838.11 125 E AVENIDA SAN JUAN SAN CLEMENTE CA 92672-3232 245 E THIRD STREET LONG BEACH CA 90802 2600 E. PACIFIC COAST HWY., SUITE 170 LONG BEACH CA 90804 3035 SOUTH 72ND STREET OMAHA NE 68124 P O BOX 4050 DANA POINT CA 92629 0000 Type Electrical Fixtures Qty Type Plumbing Fixtures Grease Interceptor/Trap Qty Type Mechanical Fixtures Qty 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo P�PNE11W CqC Cityof Anaheim o� io Building Division F i U > �D�NDED Eby^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final - �( Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMlgation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Manedi 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) _ Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor sinned off) Sewer Water Engineering Backflow, (Testable Only) Water Service