559 S ANAHEIM BLVD (6)Permit Types
BLD ELE MEC PLM
X I X
Permit Number: BLD2017-01197
Issued: 02/27/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 84
..Site'Address: 55.9 S ANAHEIM BLVD
Lie gal�' escription: VINEYARD LOTS LOT G-4 N 104.94 FT S
200 SMANAHEIMsBL
(714) 765 - 5153
EIM
Project Description: Trash Enclosure: 18 In.ft. X 14 ft. high CMU wall - trash enclosure for "LEISURETOWN" shell
improvement. REF: BLD2017-01195 Bldg. D
People Associated with Project:
Owner
FRANCES I BESHEARS TR
Engineer
MICHAEL P BOHN
Engineer
TAREK A HOBALLAH
Engineer
GREGORY R SCHNACKEL
Contractor
C B KENNER INC
Permit Applicant
CHAD KENNER
Number of Stories 1 Valuation:
$10,000.00
Construcion Types:
VB, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
838.11
125 E AVENIDA SAN JUAN SAN CLEMENTE CA 92672-3232
245 E THIRD STREET LONG BEACH CA 90802
2600 E. PACIFIC COAST HWY., SUITE 170 LONG BEACH CA 90804
3035 SOUTH 72ND STREET OMAHA NE 68124
P O BOX 4050 DANA POINT CA 92629 0000
Type Electrical Fixtures Qty Type Plumbing Fixtures
Grease Interceptor/Trap
Qty Type Mechanical Fixtures Qty
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
P�PNE11W CqC
Cityof Anaheim o� io
Building Division F i
U >
�D�NDED Eby^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final - �(
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMlgation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been Manedi
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout) _
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
sinned off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service