915 S AGATE ST (3)r—
Permit Types
BLD ELE MEC PLM
X
Permit Number: OLD2023-00214
Issued: 01/17/2023
www.anaheim.net/building
(714)765-0626
Quarter Section: 41
Site Address:: 915 S AGATE ST, ANAHEIM, CA 92804
Legal
best'fiptI": N. TR 2426 BLK-LOT 4
APN: 12830404
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(71141765-51153
Project Description: Plumbing to Install cleanout, redrain, and kitchen line re-route
Living Area: Number of Stories: 0 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Permit Applicant logan appel
Owner PENNELL GEORGE ILLING TR 915 S AGATE ST
Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty
Repair/Drainage Alteration/Vent Piping 2
Sewer per 100 ft. 1
4
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
I FINAL INSPECTIONS I DATE I INSPECTOR I
I All applicable items below must be signed before utilities are released I
DUIIUIIIU NIviumil Z final Gas Test
j a Electrical Final Pr
tubing Final aA CC461 Q
LADED i Mechanical a L -LA0
Cross Connection Control (714) 765-4280
Do not occupy this buildinq until the final inspections have been made. Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed:
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sionedi
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Mas~ einf./Bond Beam/Pre-Grout)
ugh Plumbing(Top Ou
t" _fl w/l/
Rough Duct (Mechanical) �
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service