1129 N ACACIA ST (2)Permit Types
BLD, ELE MEC PLM
c
X
<-Permit Number: BLD2016-05609
Issued: 11/18/2016
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 91
Site Address:..1129 N ACACIA ST
L'egal'Description: N TR 1515 LOT 4
Project Description: Mechanical for FAU change out. (same location)
CI
(714) 765 - 5153
EIM
Valuation:
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
147.67
People Associated with Project:
Owner JUAN SEGURA 1129 ACACIA ST ANAHEIM CA 92805-1512
Contractor SPECIALTY A C HEAT 1289 E 7TH ST UPLAND CA 91786
Permit Applicant DAVID AMAYA
Type Electrical Fixtures Qty Type"- Plumbing Fixtures Qty Type
t - Heating Appliances, including vent
Heating/Cooling Coil
Residential Registers
Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A hew permit is required.to.commerice or continue work. fbld_permit combo
1
1
0
P�Pt1EI1W �qc
City of Anaheim o� o
Building Division F i
U '
DED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the folhOng applicable items have been
s' e •
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
q
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' e
1st Floor Shear
Lim I '
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Relnf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Strutt., Ele., or Mec.)
Grease Interceptor
1 11 Do not backfill unless sinned off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service