1304 N AETNA ST (6)Permit Types
BLD ELE MEC PLM
X I X
Permit Number: BLD2011-03916
Issued: 10/10/2011
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 30
Site Address: 1304 N AETNA ST
Legal Description: N TR 2288 LOT 27
[of
(714) 765 - 5153
Project Description: Residential Remodel: Replace 4 windows. Electrical to upgrade service to 100amps.
EIM
Valuation:
$800.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
436.02
People Associated with Project:
Owner FRANCISCO LOPEZ 1304 N AETNA ST ANAHEIM CA 92801-1506
Permit Applicant FRANCISCO LOPEZ
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty
Meter/Disc Sw - under 600 V., up to,200 1
amps
Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the ' ilding or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required tweommence or continu, York. fbld_permit_combo
P�PAEIAl CqC
Cityof Anaheim o� �O
Building Division F i
u a
SOUNDED �a�1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items.have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer ,, ,°
Sub ListlBus. Lic: (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianedy
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
'�
J q/J_
�+v
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioneda
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
'
Grease Interceptor
(Do not backfoll unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service