1434 E ALCOVE WAYPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD202342824
Issued: 06/07/2023
www.anaheim.net/building
(714)765.4626
Quarter Section: 105
Site Address: 1434 E ALCOVE WAY, Anaheim, CA 92805
Legal Description: N TR 6812 BLK LOT 80
APN:23409222
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765.515
Project Description: Reroof: Tear off and install 22 squares of shingles on house and attached garage:
Living Area: Number of Stories: 0 Valuallon: 11,000.00
Garage Area: Construction Types: vb
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Root Total Fees paid for Penult: 340.43
People Associated with Project.
Contractor HIGH RIDGE ROOFING 11296 SNOWDROP AVENUE201907121538484380 FOUNTAIN VALLEY, CA 92708
Permit Applicant CARLOS SANCHEZ, OWNER 11296 SNOWDROP AVE FOUNTAIN VALLEY, CA 92708 0000
Owner LAM, ALFIE KAR HO 7171 WARNER AVE 8409
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�pHEuw CqC
City of Anaheim D� io
Building Division F 0
u a
�DGNDED %
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
s'
011
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed 0/i
(fin
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s4aneda
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame) Air,
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service