Loading...
2211 W ANACASA WAY1 Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-02621 Issued: 05/26/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 34 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 2211 W ANACASA WAY, Anaheim, CA 92804 Legal Description: N TR 17754 BLK LOT 1 UN 3 LOT 1 OF TRACT 17754 OF APN:93934052 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof: People Associated with Project: Permit Applicant Lai Trinh Owner TRINH, LOI VAN & HANG THU 2211 W ANACASA WAY 0 Valuation: 0.00 Construction Types: N/A Occupancy Groups: Fire Sprinidered: Total Fees paid for Permit: 167.00 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed Anal inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEInr Cq< Cityof Anaheim D� io Building Division F z U a �0 DED gay^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 17 Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s*aned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service