Loading...
7348 E AVENIDA JUAREZPermit Types BLD ELE MEC PLM • X Permit Number: BLD2023-02880 Issued: 06/09/2023 www.anahelm.net/bullding (714)7654626 Quarter Section: 196 CITY OF ANAHEIM Site Address: 7348 E AVENIDA JUAREZAnaheim, CA 92808 Legal Description: N TR 7735 BLK LOT 34 APN:35823252 Project Description: Residential EV Charger Level 2 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 -5153 Living Area: Number of Stories: 2 Valuation: 0.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinidered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Permit Applicant Jeraun Richards Owner BOB, CLAUDIU 8 & CAMELIA 7348 E AVENIDA JUAREZ Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Oty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM Cq< City of Anaheim D� io Building DivisionF a U a DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final ?pT28Gir Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been si ne • Building Final (714 765-5153) Last Inspection-Final Only After Above Completed I Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been e 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unlass sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service