Permit Number: BLD202244484
Issued: 09/20/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 208
Site Address: 7920 E ALTAIR LN, ANAHEIM, CA 92808
Legal Desc�iptign: N:
P�Pr1EN4 C9<
City of Anaheim o� io
Building Division i
U a
DED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released r
Final Gas Test
Electrical Final k rf
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fin; Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' ne •
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service
OTHER HELPFUL INFORMATION FOR EV CHARGER INSTALLATIONS:
The table below illustrates the type and size of wire and conduit to be used for various electric vehicle
chargers based on 75 degrees' Celsius termination provisions.
***Based on 4 wires in the conduit (2 - current carrying conductors, 1- grounded conductor, 1 -
equipment ground).
As an alternate, Nonmetallic Sheathed Cable (aka: Romex Cable or NMC) may be used if if is protected
from physical damage by placing the cable inside a wall cavity or affic space which is separated hom
the occupied space by drywall or plywood.
The table below illustrates the required supports for various types of electrical conduit or cable.
Electrical
Conduit Type and Size***
Size of
EV Charger
Circuit Breaker
Required
Minimum Size
of Conductors
(THHN Wire)
Electrical Rigid
Metallic Tubing Nonmetallic
(EMT) Conduit -
Schedule 40
RNC
Flexible Metal
Conduit
(FMC)
20 ams
#12
1/2" 1N
1/2"
30 ams
#10
Conduit
Cable
40 ams
#g
3/4.1 3/4..
3/4"
50 ams
#8
3/4" 3/4"
3/4'
60 ams
#6
3/4" 3/4"
3/4"
70 ams
#6
3/4" 3/4"
3/4"
***Based on 4 wires in the conduit (2 - current carrying conductors, 1- grounded conductor, 1 -
equipment ground).
As an alternate, Nonmetallic Sheathed Cable (aka: Romex Cable or NMC) may be used if if is protected
from physical damage by placing the cable inside a wall cavity or affic space which is separated hom
the occupied space by drywall or plywood.
The table below illustrates the required supports for various types of electrical conduit or cable.
In addition to the above noted requirements, the currently adopted version of the California Electrical
Code contains many other provisions that may be applicable to the installation of a new electrical circuit.
Installers are cautioned to be aware of all applicable requirements before beginning the installation. For
additional information or guidance, consult with the Building Division staff or a qualified and experienced
electrical contractor.
Page 5 of 5
Sep 2016
200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax B837
www.anaheim.net/building
Electrical
Rigid
Nonmetallic
Conduit
Metallic
Nonmetallic
Flexible Metal
Sheathed
Support
Tubing
Conduit -
Conduit
Cable
(EMT)
Schedule 40
(FMC)
(NMC)
RNC
Conduit
Support
10'
3'
4-1/2'
4-1/2'
:.Intervals
.:Maximum
Distance from
Bok to
3'
3'
1'
1'
Conduit
Support
In addition to the above noted requirements, the currently adopted version of the California Electrical
Code contains many other provisions that may be applicable to the installation of a new electrical circuit.
Installers are cautioned to be aware of all applicable requirements before beginning the installation. For
additional information or guidance, consult with the Building Division staff or a qualified and experienced
electrical contractor.
Page 5 of 5
Sep 2016
200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax B837
www.anaheim.net/building
Q
EXISTING MAIN CIRCUIT BREAKER SIZE: AMPS
*(Loads shown are rough estimates; actual loads may vary - for a more precise analysis, use the
nameplate ratings for appliances and other loads and consult with a trained electrical professional).
✓ Check All
Applicable
Loads
Description of Load
Typical Usage*
Watts Used
GENERAL LIGHTING AND RECEPTACLE OUTLET CIRCUITS
Multiply the
Square foots a of house X 3
3 watts/sq.ft.
1 O
KITCHEN CIRCUITS
Kitchen circuits
3,000 watts
o b
Electric oven
2,000 watts
Electric stove top
5,000 watts
Microwave
1,500 watts
X09
Garbage disposal under kitchen sink
1,000 watts
V
Automatic dish washer
3,500 watts
v
Garbage compactor
1,000 watts
Instantaneous hot water at sink
1,500 watts
LAUNDRY CIRCUIT
Laundry circuit
1,500 watts
o U
Electric clothes dryer
4,500 watts
HEATING AND AIR CONDITIONING CIRCUITS
Central heating (gas) and air
conditioning(�
6,000 watts
/
Window -mounted A/C
1,000 watts
Whole -house or attic fan
500 watts
Central electric furnace
8,000 watts
Evaporative Cooler
500 watts
OTHER ELECTRICAL LOADS
Electric water heater (storage type)
4,000 watts
Electric tank less water heater
15,000 watts
Swimming pool or spa
3,500 watts
Other: describe
D
ELECTRIC VEHICLE CHARGER CIRCUIT
Level 2 Electric Vehicle Charger rating*
*Use nameplate rating in watts or calculate as: (Ampere rating
or circuit X 240 volts = Wafts
THE I SUANCE OF THIS PERMIT DOPS
(Add -up 6-Mft"f6q"@VNfYr checked)
THE HOLDER OF
PROCEEDS AT HIS OWN RISK. TOTAL WATTS USED
SEP 2 0 2022
BUILDING DIVISION OF ANAHEIM
APPROV Cu r0gaJnvsi
r,
200S-Anahae UMd gUiMRm92805 (714)765-5153 Phone (714)765-4607Fax Sep 2016
B837
www.anaheim.net/building
INSTRUCTIONS: Apply the Total Waits Used number from the previous page to the table below to identify if
the existing electrical service panel is large enough to handle the added electrical load from the
proposed Level 2 EV Charger. If your electrical service is NOT large enough, then you will need to install a
new upgraded electrical service panel.
Please note that the size of your existing service must be equal to or larger than the minimum required size
identified in the table above or a new upgraded electrical service panel will need to be installed (a
separate permit is required for new service). Please note that approval from the Utilities Department will
be required for the installation of the new electrical service panel.
CAUTION: This table is NOT to be used to determine the size of a NEW UPGRADED electrical service
panel if your existing panel is too small or overloaded according to the table above. In order to determine
the size of a NEW or UPGRADED service panel, there is a completely different load calculation
methodology that applies. Sizing of a NEW or UPGRADED electrical service panel should only be done by
a qualified Electrical Contractor or Electrical Engineer.
STATEMENT OF COMPLIANCE
By my signature, I attest that the information provided is true and accurate.
Job Address:
(Print job address)
Signature:
im
Please note that this is a voluntary compliance alternative and you may wish to hire a qualified individual
or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative
methodology. Use of this electrical load calculation estimate methodology and forms Js at the user's risk
and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to
seek professional assistance in determining the electrical capacity of a service panel.
Pone 4 of S
200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax Sep 2016B837
www.anaheim.net/bui(dinp
Minimum Re wired
Size of Existing 240
Total Wafts Used Total Watts Used
(Check
Volt Electrical
Before Adjustments
the
Service Panel
appropriate
(Main Service
line
Breaker size
Up to 48,000
100 amps
48,001 to 63,000
125 amps
63,001 to 78,000
1.50 amps
78,001 to 108,000
200 ams
108,001 to 123,000
225 am s
Please note that the size of your existing service must be equal to or larger than the minimum required size
identified in the table above or a new upgraded electrical service panel will need to be installed (a
separate permit is required for new service). Please note that approval from the Utilities Department will
be required for the installation of the new electrical service panel.
CAUTION: This table is NOT to be used to determine the size of a NEW UPGRADED electrical service
panel if your existing panel is too small or overloaded according to the table above. In order to determine
the size of a NEW or UPGRADED service panel, there is a completely different load calculation
methodology that applies. Sizing of a NEW or UPGRADED electrical service panel should only be done by
a qualified Electrical Contractor or Electrical Engineer.
STATEMENT OF COMPLIANCE
By my signature, I attest that the information provided is true and accurate.
Job Address:
(Print job address)
Signature:
im
Please note that this is a voluntary compliance alternative and you may wish to hire a qualified individual
or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative
methodology. Use of this electrical load calculation estimate methodology and forms Js at the user's risk
and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to
seek professional assistance in determining the electrical capacity of a service panel.
Pone 4 of S
200 S. Anaheim Blvd., Suite 145 Anaheim, California 92805 (714)765-5153 Phone (714)765-4607 Fax Sep 2016B837
www.anaheim.net/bui(dinp
Permit Types
BLD I ELE I MEC PLM
V. J `X
Permit Number: BLD2022-04484
Issued: 09/20/2022
www.anaheim.neUbuilding
(714)765-0626
Quarter Section: 208
Site Address: 7920 E ALTAIR LN, ANAHEIM, CA 92808
Legal Description: N TR 10980 BLK LOT 56
APN: 35414409
OWNER - BUILDER DECLARATION:
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
I hereby affirm under penalty of perjury that I am exempt from Lthe Contractor's License State Law for the following reason(s) Indicated below by the
checkmark(s) I have placed next to the applicable Item(s) (Sec. 7031.5 Business and Professions Code: any city or county which requires a permit to
construct, alter, improve, demolish or repair any structure, prior to Its Issuance, also requires the applicant for the permit to foe a signed statement that he
or she is licensed pursuant to the provisions of the Contractors' State License Law Chapter 0 (commencing with Section 7000) of Division 3 of the
Business and Professions Code) or that he or she is exempt from licensure and the basis for the alleged exemption. Any violation of Section 7031.5 by any
applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).
I, as owner of property, or my employees with wages as their sole compensation, will do I l ell or () portions of the work, and the structure Is not Intended or
offered for sale (Sec. 7044 Business and Professions Code: The Contractors' State License taw does not apply to an owner of property who, through employees' or
personal efforts, builds or Improves the property, provided that the Improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the Owner -Builder will have the burden of proving that it was not built or Improved for the purpose of sale).
1, as the owner o1 the property, am exclusively contracting with licensed Contractors to construct the project (Sec. 7044 Business and Professions Code:
The Contractors' State License Law does net apply to an owner of property who builds or improves thereon, and who contracts for the projects with a licensed
Contractor pursuant to the Contractors State License Law).
I am exempt from licensure under the Contractors, State license Law for the following reason:
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
Improvements covered by this permit, I cannot legally sell a structure that I have built as an owner -builder If it has not been constructed in its entirety by licensed
contractors. I understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, Is available upon request when this application
Is submitted or at the following Web site: hftp://ww,lealnfo.ca.aovtcalaw.html
By my signature below. I certify to each of the following:
1 am the property owner or authorized to act on the property owner's behalf.
I have read this application and the information I have provided is correct.
1 agree to comp ty with all applicable city and county ordinances and state laws relating to building construction
I authn*e presentatives of this city or county t enter the above-identBed property for inspection purposes.
a°r\ 44 dVd �
tgn to party orized Agent Da�
WORKER'S COMPENSATION DECLARATION:
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL
PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES
AS PROVIDED FOR IN SECTION 3706 OR THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES.
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self -insure for worker's compensation, issued by the Director of industrial Relations as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
I have and will maintain worker's compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which
this permit is issued. My worker's Compensation insurance carrier and policy are:
Cartier. Policy No.: Expiration Date:
Name of Agent:
Phone No.:
I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the
workers compensation laws of California, and agree that, if I should become subject to the worker's compensation provisions of Section 3700 of the
Labor Code, I shall forthwith comply with those provislons.
Signature of Applicant Date
DECLARATION REGARDING CONSTRUCTION LENDING AGENCY:
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued
(Sec.3097.Civ.C):
Lender's Name:
Lender's Address:
LICENSED CONTRACTOR'S DECLARATION:
I hereby affirm under the penalty of Perjury that I am licensed under provisions of chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professions Code, and my license is in full force and effect.
Contractor Signature Date
NUMBER EXPIRATION DATE LICENSE TYPE (S)
CITY OF ANAHEIM
PeiBUILDING DIVISIONPemfit Number: BLD2022-04484 200 S. ANAHEIM BLVD.
Issued: 09/20/2022 (714) 765 - 5153
www.anaheim.net/building
(714)765.4626
Quarter Section: 208
OWNER -BUILDER ACKNOWLEDGEMENT AND INFORMATION VERIFICATION FORM
Dear Property Owner:
An application for a building permit has been submitted in your name listing yourself as the builder of the property improvements
specified at 7920 E ALTAIR LN, ANAHEIM, CA 92808.
We are providing you with an Owner -Builder Acknowledgement and Information Verification Form to make you aware of your
responsibilities and possible risk you may incur by having this permit issued in your name as the Owner -Builder.
We will not issue a building permit until you have read, initialed your understanding of each provision, signed, and returned this
form to us at our official address indicated. An agent of the owner cannot execute this notice unless you, the property owner,
obtain the prior approval of the permitting authority.
Directions: Read and initial each statement below to signify you understand or verify this information.
1.1 understand a frequent practice of unlicensed persons is to have the property owner obtain an "Owner -Builder" building
permit that erroneously implies that the property owner is providing his or her own labor and material personally. I, as an
Owner -Builder, may be held liable and subject to serious financial risk for any injuries sustained by an unlicensed person
and his or her employees while working on my property. My homeowner's insurance may not provide coverage for those
injuries. I am willfully working as an Owner -Builder and am aware of the limits of my insurance coverage for injuries to
2.1 understand building permits are not required to be signed by property owners unless they are responsible for the
construction and are not hiring a licensed Contractor to assume this responsibility.
/ 3.1 understand as an "Owner -Builder" I am the responsible party of recons on the permit. I understand that I may protect
3 v myself from potential risk by hiring a licensed Contractor and having the permit filed in his or her name instead of my own.
-)
, 4.1 understand Contractors are required by law to be licensed and bonded in California and to list their license numbers on
5 V permits and contracts.
5.1 understand if I employ or otherwise engage any persons, other than California licensed Contractors, and the total value
Cd" of my construction is at least five hundred dollars ($500), including labor and materials, I may be considered an "employer"
under state and federal law.
6.1 understand if I am considered an "employer* under state and federal law, I must register with the state and federal
government, withhold payroll taxes, provide workers's compensation disability insurance, and contribute to unemployment
compensation for each "employee". I also understand my failure to abide by these laws may subject me to serious financial
risk.
J 7.1 understand under California Contractors' State License Law, an Owner -Builder who builds single-family residential
structures cannot legally build them with the intent to offer them for sale, unless all work is performed by licensed
subcontractors and the number of structures does not exceed four within any calendar year, or all of the work is performed
under contract with a licensed general building Contractor.
9) 8.1 understand as an Owner -Builder if I sell the property for which this permit is issued, I may be held liable for any financial
or personal injuries sustained by any subsequent owner(s) that result from any latent construction defects in the
workmanship or materials.
9.1 understand I may obtain more information regarding my obligations as an "employer" from the internal Revenue Service,
the United States Small Business Administration, the California Department of Benefit Payments, and the California
Division of Industrial Accidents. I also understand I may contact the California Contractors' State License Board (CSLB) at
1-800-321-CSLB (2752) or www.csib.ca.gov for more information about licensed contractors.
10. 1 am aware of and consent to an Owner -Builder building permit applied for in my name, and understand that I am the
party legally and financially responsible for proposed construction activity at the following address: 7920 E ALTAIR LN.
CITY OF ANAHEIM
BUILDING DMSIDN
Permit Number: BLD2022-04484 200 S. ANAHEIM BLVD.
Issued: 09/20/2022 (7141 765 -5153
www.anaheim.net/building
(714)765.4626
Quarter Section: 208
,Permit Number: SL02022-04484
11: I agree that, as the party Legally and financially responsible for this proposed construction activity, I will abide by all
applicable laws and requirements that govern Owner -Builders as well as employers.
12.1 agree to notify the issuer of this form immediately of any additions, deletions, or changes to any of the information 1
have provided on this form. Licensed contractors are regulated by laws designed to protect the public. If you contract with
someone who does not have a license, the Contractors' State License Board may be unable to assist you with any
financialloss you may sustain as a result of a complaint. Your only remedy against unlicensed Contractors may be in civil
court. It is also important for you to understand that if an unlicensed Contractor or employee of that individual or firm is
injured while working on your property, you may be held liable for damages. If you obtain a permit as Owner -Builder and
wish to hire
Contractors, you will be responsible for verifying whether or not those Contractors are properly licensed and the status of
their workers' compensation insurance coverage.
Before a building permit can be issued, this form must be completed and signed by the property owner and returned to the
agency responsible for issuing the permit.
Note: A copy of the property owners drivers license, form notarization, or other verification acceptable to the agency is required
to be present d when the permit is issued to verify the property owners signature.
P p rty net's Signatur Date:
_ f
4