831 S BEACH BLVDPermit Types CITY OF ANAHEIMPLMBLDELEMEC
X BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2022-03047
Issued:12/23/2022
www.anaheim.net/building
(714)765-4626
Quarter Section;10
Site Address:831 S BEACH BLVD,ANAHEIM.CA 92804
Legal Description:S TWP 4 RGE 11 SEC 14 SEC 14 T 4 R 11 S 96 FT N 48
APN:07916413
Project Description:EV-Charger;Install (8)level-2 EV-Charging stations,restripe parking spaces to
space and install new 200amp subpanel.
provide accessible EV parking
0 50,000.00Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
Number of Stories;Living Area:
Garage Area:
Carport Area:
Baicony/Deck Area:
Cool Roof:
N/A
2,362.00
People Associated with Project:
921 E GLENOAKS BLVD GLENDALE,CA 91207
921 E GLENOAKS BLVD GLENDALE,CA 91207
831 S BEACH BLVD
Permit Applicant
Permit Applicant
Owner
ANDREA D’ALFONSO
ANDREA D’ALFONSO
DHANUBA HOSPITALITY INC
QtyQtyTypeQtyMechanicalFixturesElectricalFixturesPlumbingFixturesType
8EVCharger
Sub Panel/Temp FNvr -Under 600 V,up to
200 amps
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the foilwing applicable items have been
signed Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-siab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after Pibg,,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
ermit expirfdinspectiom
NOT COMPLETED
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct,Ele.,or Mec.)
Grease Interceptor
tPQjjQt backfill unless siunc-d off
Sewer
PATE-
Water Engineering Backflow (Testable Only)
Water Service