Loading...
831 S BEACH BLVDPermit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2022-03047 Issued:12/23/2022 www.anaheim.net/building (714)765-4626 Quarter Section;10 Site Address:831 S BEACH BLVD,ANAHEIM.CA 92804 Legal Description:S TWP 4 RGE 11 SEC 14 SEC 14 T 4 R 11 S 96 FT N 48 APN:07916413 Project Description:EV-Charger;Install (8)level-2 EV-Charging stations,restripe parking spaces to space and install new 200amp subpanel. provide accessible EV parking 0 50,000.00Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: Number of Stories;Living Area: Garage Area: Carport Area: Baicony/Deck Area: Cool Roof: N/A 2,362.00 People Associated with Project: 921 E GLENOAKS BLVD GLENDALE,CA 91207 921 E GLENOAKS BLVD GLENDALE,CA 91207 831 S BEACH BLVD Permit Applicant Permit Applicant Owner ANDREA D’ALFONSO ANDREA D’ALFONSO DHANUBA HOSPITALITY INC QtyQtyTypeQtyMechanicalFixturesElectricalFixturesPlumbingFixturesType 8EVCharger Sub Panel/Temp FNvr -Under 600 V,up to 200 amps 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been signed Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-siab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after Pibg,,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath ermit expirfdinspectiom NOT COMPLETED Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct,Ele.,or Mec.) Grease Interceptor tPQjjQt backfill unless siunc-d off Sewer PATE- Water Engineering Backflow (Testable Only) Water Service