900 E BALSAM AVE (2)Permit Types
BLD' ELE MEC PLM
X
PerAt Nur,?ber: BLD2018-04281
Issued: 09/19/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626 °
Quarter Section: 81
Site Address: =900 E BALSAM AVE
Legal Description -N TR 5703 LOT 6
CI
(714) 765 - 5153
EIM
Cb
Project Description: Residential Remodel: Replace (1) nail on window, work done prior to permit. REF:INV2018-00428.
Valuation: $250.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 147.67
People Associated with Project:
Owner MENDOZA GONZALO/ALVAREZ MARIA 900 E BALSAM AVE #A -D ANAHEIM CA 92805-1411
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit-combo
3 N�s� -,J
PSP Cq<
City of Anaheim D� "EIM io
Building Division F z
V '
�DUNDED �8y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following"applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormsITrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned•
Building Final (714 765.5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspe ns
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane ReinE)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned-
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor _
Sewer
Water Engineering Backflow (Testable Only)
Water Service
i�
Prescriptive Certificate of Compliance: Residential CF -IR -ALT -01-E
Residential Alterations WINDOW REPLACEMENT
Project Name: n , AAInel
Climate Zone # 8 # of Stories
,84
General Information
Site Address:
Enforcement Agency: CITY OF
ANAHEIM
Date:
Building Type Single Family Multi Family
14
Circle the Front Orientation: N, E, S, W, or degrees
Conditioned Floor Area (CFA):
Project Type: ❑ Alterations ❑ EnvelopeApenestration ❑ Roof ❑
HVAC Replacement or Change Out ❑ Duct Replacement ❑ Water
Heater
NOTE: This form is not to be used for Newly Constructed Buildings or Additions
FENESTRATION PROPOSED AREAS
❑ Replacing window alone — Replacement windows shall meet the U -Factor and SHGC Value requirements of Component
Package D in Table 151-C. The Total Fenestration and West facing Area requirements are not applicable.
❑ Adding 50ft2 or less of window area — Newly installed windows shall meet the U -Factor and SHGC Value requirements
of Component Package D in Table 151-C.
❑ Adding more -than 50ft2 of window area — Newly installed windows shall meet the U -Factor and SHGC Value and the
Fenestration Area requirements of Component Package D in Table 151-C. Complete the Altered Fenestration Allowed Area
Table on Page 2 of the CF -JR -ALT
Address:
Orientation
City/State/Zip:
Phone:
(North,
Maximum
Fenestration Type and Frame
(Window, Glass Door or Skylight)
East, South,
PropsedAreal
(ft)
Maximum
U -factor`' 3
SHGC2, 3,
4
NFRC or Default
Values
#32 a► ^A
.2Srm-�
1. Fenestration area is the area of total glazed product (i.e. glass plus frame). Exception: When a door is less than 50%glass,
the fenestration
area may be the glass area plus a "2 inch frame" around the glass.
2. Enter value from Component Package D Requirements in Table 151-C.
3. Actual fenestration products installed and as indicated in CF -6R -ENV Form shall be equivalent to or have a lower U factor
and/or a lower SHGC value than that specified on the CF -JR ALT Form. 1 G
4. Submit a completed WS -3R Form if a reduced SHGC is calculated with exterior shading.
5. If applicable at this stage enter "NFRC" for NFRC Certified windows or are CEC "Default " values found in Table 116-A or
B.
Documentation Author's Declaration Statement
• I certify that this Certificate of Com lian a documentation is accurate and complete.
Name mry A L G m gn re:
G`
Company:
Date:q I n
Address:
If Applicable ❑ CEA or ❑ CEPE
(Certification #):
City/State/Zip:
Phone: