Loading...
2672 W BAYLOR AVEPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-00429- Issued: 01/26/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 19 Site Address: 2672 W SAYLOR AVE, Anaheim, CA 92801 Legal ;D#t Aj,tion: N TR 2303 BLK LOT 52 APN:07052302 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765.5153 Project Description: Reroof: Tear off existing material to install (1,300) sq It of composition shingle over portion of residence E6 ur living Area: Number of Stories: 1 Valuation: 4,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spdnldered: No Cool Roof: Total Fees paid for Permit: 338.52 People Associated with Project: Contractor GREEN LADDER ROOFING COMPANY 81 PEPPER ST PASADENA, CA Permit Applicant David Reyes Owner ROYS FREDDY & EILEEN 2672 W BAYLOR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty 0 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pHEIM cq< City of Anaheim o� �o Building Division �2 U a �0�N0ED ��y^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA1Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Maned: Building Final (714 765-5153) �6 Last Inspection-Final Only After Abov Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned7 1st Floor Shear* Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear oof (Sheathing/Diaphra /Frame) Ma (Reinf./B eam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service