2672 W BAYLOR AVEPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-00429-
Issued: 01/26/2023
www.anaheim.net/building
(714)765-0626
Quarter Section: 19
Site Address: 2672 W SAYLOR AVE, Anaheim, CA 92801
Legal ;D#t Aj,tion: N TR 2303 BLK LOT 52
APN:07052302
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765.5153
Project Description: Reroof: Tear off existing material to install (1,300) sq It of composition shingle over portion of residence
E6
ur
living Area: Number of Stories: 1 Valuation: 4,000.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnldered: No
Cool Roof: Total Fees paid for Permit: 338.52
People Associated with Project:
Contractor GREEN LADDER ROOFING COMPANY 81 PEPPER ST PASADENA, CA
Permit Applicant David Reyes
Owner ROYS FREDDY & EILEEN 2672 W BAYLOR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
0
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�pHEIM cq<
City of Anaheim o� �o
Building Division �2
U a
�0�N0ED ��y^
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA1Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Maned:
Building Final (714 765-5153) �6
Last Inspection-Final Only After Abov Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned7
1st Floor Shear*
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
oof (Sheathing/Diaphra /Frame)
Ma (Reinf./B eam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service