228 S CAMINO DE PAZ (5)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-05465 `"
Issued: 11/16/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 186
Site Address: 228 S CAMINO DE PAZANAHEIM, CA 92807
Legal Descri0tion:.N_TR�7288. BLK LOT,90
APN:36306222
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - S1 S3
Project Description: Mechanical to change out air conditioner, (1) furnace and (1) duct
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: NIA
Carport Area: Occupancy Groups:
Balcony i Deck Area: Fire Spdnldered:
Cool Root: Total Fees paid for Permit: 245.00
People Associated with Project:
Permit Applicant Ben Medina
Owner ELLIS CINDY 228 S CAMINO DE PAZ
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Compressor/Boller - up to 15 hp 1
Heating Appliances, Including vent 1
Heating/Cooling Coil 1
Residential Registers 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PHEIM Cq<
City of Anaheim o� �o
Building Division z
v
-
�ooNDED
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final 3 ri33 iA✓L.
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
seanedo
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been seanede
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
CITY OF ANAHEIM 27:01!8 (So
PLANNING SERVICES DIVISION
APPROVED
J '
DAT`. II"I�1e'.pti ' 70NE_RM•3
BY ` lam"\ ��! ! A N IL
DEV_r 0 Ar _ _ r -E- F-- $ m
VA?C_`=
�er�p► L�: >50� ft`'
Alter >2,500 ft
Phns comply w -i ) Title 18 of the A.M.C. (Zoning).
This does not cc istitute approval of a building
permit or author a violation of anyCity Codes.
Ajc- uvtil Cti ante
b�� •I� 0 �w .6 arIAI W\.ust'
C'
\AM .
,ZZo
PLOT PLAN
t
IW
`,F�NAL
,�„a' oma
3_ fay+ -gin l� �z
JOB ADDRESS:
n�d�► .Alis..... _.. ._ ,-.:,. - ----.
i
SCOPE OF WORKLU &LAZ—e,La/: l Ai�i I-o"m k
(I�h�