Loading...
228 S CAMINO DE PAZ (5)Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-05465 `" Issued: 11/16/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 186 Site Address: 228 S CAMINO DE PAZANAHEIM, CA 92807 Legal Descri0tion:.N_TR�7288. BLK LOT,90 APN:36306222 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - S1 S3 Project Description: Mechanical to change out air conditioner, (1) furnace and (1) duct Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony i Deck Area: Fire Spdnldered: Cool Root: Total Fees paid for Permit: 245.00 People Associated with Project: Permit Applicant Ben Medina Owner ELLIS CINDY 228 S CAMINO DE PAZ Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Compressor/Boller - up to 15 hp 1 Heating Appliances, Including vent 1 Heating/Cooling Coil 1 Residential Registers 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIM Cq< City of Anaheim o� �o Building Division z v - �ooNDED Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final 3 ri33 iA✓L. Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been seanedo Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been seanede 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service CITY OF ANAHEIM 27:01!8 (So PLANNING SERVICES DIVISION APPROVED J ' DAT`. II"I�1e'.pti ' 70NE_RM•3 BY ` lam"\ ��! ! A N IL DEV_r 0 Ar _ _ r -E- F-- $ m VA?C_`= �er�p► L�: >50� ft`' Alter >2,500 ft Phns comply w -i ) Title 18 of the A.M.C. (Zoning). This does not cc istitute approval of a building permit or author a violation of anyCity Codes. Ajc- uvtil Cti ante b�� •I� 0 �w .6 arIAI W\.ust' C' \AM . ,ZZo PLOT PLAN t IW `,F�NAL ,�„a' oma 3_ fay+ -gin l� �z JOB ADDRESS: n�d�► .Alis..... _.. ._ ,-.:,. - ----. i SCOPE OF WORKLU &LAZ—e,La/: l Ai�i I-o"m k (I�h�