528 S CITADELL LNPermit Types
I MEC PLM
X X
Permit Number: BLD202342100
Issued: 05/24/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 113
Site Address: 528 S CITADELL LN, ANAHEIM, CA 92806
Legal Description: N TR 1987 BLK LOT 21
APN: 08343708
CITY OF ANAHEIM
Project Description: Residential Photovoltaic System with Inverters
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765-5153
• f
fn's- r9
Living Area: Number of Stories: Valuation: 33,000.00
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit263.29
People Associated with Project:
Contractor SOLARPRO ELECTRIC 20137 LEE RD PERRIS, CA
Permit Applicant Amanda Lutzer
Type Electrical Fixtures Qty Type Plumbing Fbdures Qty Mechanical Fixtures Qty
Inverter 1
Sub Penel/Temp Pwr - Under 600 V, up to 1
200 amps
The permit shall expire by limitation and become null and vold If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION I DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
si n d:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Olaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Pibg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS I DATES INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) .
COA/Migation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections