Loading...
528 S CITADELL LNPermit Types I MEC PLM X X Permit Number: BLD202342100 Issued: 05/24/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 113 Site Address: 528 S CITADELL LN, ANAHEIM, CA 92806 Legal Description: N TR 1987 BLK LOT 21 APN: 08343708 CITY OF ANAHEIM Project Description: Residential Photovoltaic System with Inverters BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765-5153 • f fn's- r9 Living Area: Number of Stories: Valuation: 33,000.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit263.29 People Associated with Project: Contractor SOLARPRO ELECTRIC 20137 LEE RD PERRIS, CA Permit Applicant Amanda Lutzer Type Electrical Fixtures Qty Type Plumbing Fbdures Qty Mechanical Fixtures Qty Inverter 1 Sub Penel/Temp Pwr - Under 600 V, up to 1 200 amps The permit shall expire by limitation and become null and vold If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim Building Division Do not occupy this building until the final inspections have been made. INSPECTION I DATE INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been si n d: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Olaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Framing (Only after Pibg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service FINAL INSPECTIONS I DATES INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 Fire Dept. Final (714) 765-5041 Water Engineering (714) 765-4591 Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) . COA/Migation Measures Building Final (714 765-5153) Last Inspection -Final Only After Above Completed PARTIAL INSPECTIONS Buildinq Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections