Loading...
639 S CASITA ST (3)Permit Types BLD ELE MEC PLM X Pormit:Numbw:: BLDX0 230•+• • ^ Issued: 03/14/2023 www.anaheim.nettbuilding (714)765-4626 Quarter Section: 94 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765-5153 Site Address: 639 S CASITA ST, ANAHEIM, CA 92805 L'egal'pescNption: N TR 17422 BLK LOT 8 UN 68 LOT 8 OF TRACT 17422 OF APN: 93406531 Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof - People Associated with Project: Permit Applicant Wenlong Wu Owner WU ALEXAH SUNEUN & WENLONG 639 S CASITA ST 0 Valuation: 0.00 Construction Types: NIA Occupancy Groups: Fire Sprinklered: Total Feer, paid for Permit: 167.00 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHEIM �q< FINAL INSPECTIONS DATE INSPECTOR City of Anaheim D� io All applicable items below must be signed before utilities are released Building Division F z Final Gas Test u D Electrical Final 3. So ILS Plumbing Final DED ugh^ Mechanical Final Cross Connection Control (714) 765-4280 Do not occupy this buildinq until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned. Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service