Loading...
700 W CONVENTION WAY (70)Permit Types BLD ELE MEC PLM X X I X Permit Number: BLD2018-01287 Issued: 06/06/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 7.7 . 4 CI 200 SMN-HEl_MIBLVD. (714) 765 - 5153 EIM Project Description: Tenant Improvement: Remodel guestroom bathrooms, tub to shower conversions, and replace fixtures throughout guestrooms and corridors (1,012 guestrooms total). • Number of Stories People Associated with Project: 7 Valuation: Construcion Types: Occupancy Groups: Fire Sprinklered? Total Fees paid for Permit: $1,000,000.00 IA, , R7, , Yes 11,342.02 Owner ANGELI LLC %GREG CASSERLY 650 TOWN CTR DR STE 1720 COSTA MESA C ' Engineer RUSSELL TYNER 2630 SEPULVEDA BLVD TORRANCE CA 90505 0000 Engineer FELIX ROTH 511 S FAIRFAX AVE LOS ANGELES CA 90036 Engineer PAUL FERBRACHE - Engineer PETER KRAUT 5346 AMBRIDGE DR CALABASAS CA 91301 Contractor COMREN INC 9438 IRONDALE AVE CHATSWORTH CA 91311 0000 Permit Applicant WILLIAM AMSTUTZ •18321 VENTURA BLVD 6TH FLOOR TARZANA CA 91356 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Receptacle, switches, lights 6,731 Bath Tub 184 Shower 819 Lavatory 1,012 Water Closet 1,013 Mechanical Fixtures Qty, The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit combo City of Anaheim Building Division I Do not occupy this building until the final inspections have been made. INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Plumbing (Ground/Underfloor Drain Waste) Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been si ned: Plumbing (Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' ned: 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinEfflond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Frarrfing (Only after Plbg., Ele., Mec. & Fire) .16-112 Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have bee igned: Drywall ► Drywall Penetrations (Ele, Mec & Pibg) Interior Lath Exterior Lath Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service PARTIAL INSPECTIONS Buildina Inspections Mechanical Inspections Plumbing Inspections Electrical Inspections