Loading...
1014 N CAMBRIA PL (3)Permit Types BLD ELE MEC Ea X X Permit Number: BLD202W*33z_: i.. 040-1 Issued: 03/10/2023 On\%'\r% P\f CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 www.anaheim.net/building (714)765.4626 Quarter Section: 25 - ----------------------------------- - --- Site Address: 1014 N CAMBRIA PL, ANAHEIM, CA 92801 Legal Description: 'N TR 2326 BLK LOT 18 APN: 07139118 Project Description: Residential Photovoltaic System with Inverters Living Area: Number of Stories: Valuation: 22,352.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire SprinMered: Cool Root: Total Fns paid for Permit: 167.00 People Associated with Project: Contractor SEMPER SOLARIS 1805 JOHN TOWERS AVENUE EL CAJON, CA 92020 Permit Applicant Brittany Miles Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City Inverter 1 39on and become null and void If the building or work has not passed final inspection 365 days from the permit is required to commence or continue work. P�pNEH4 U Cityof Anaheim c� f•o Building Division F i u a 0 6 % Do not occupy this buildinq until the final inspections have been made. - f FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' e • Building Final (714 765-5153) Last Inspection -Final Only After Above Completed /�/� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been e• 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinE/Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Constructio Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service