Loading...
1920 N CLOUD CREST CIR (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2018-05174 Issued: 03/11/2019 C INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 176 Site Address: 1920 N CLOUD CREST CIR . Legal Description: 'N TR,469'3. LOT 25 (714) 765 - 5153 Project Description: Photovoltaic System: Install new residential roof mounted solar system with (23) modules and (1) inverter. Valuation: $15,939.00 Construcion Types: N/A, , Total Fees paid for Permit: 1,103.07 People Associated with Project: Owner NANCY A BING 1920 CLOUD CREST CIR ANAHEIM CA 92807-1211 Contractor VIVINT SOLAR DEVELOPER LLC 9847 PIONEER BLVD SANTA FE SPRINGS CA 90670 Permit Applicant ERIC CURTIS Engineer JAMES M WALSH 1174 W KORADINE DR SOUTH JORDAN UT 84095 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Generators/Transformers -1 to 10 hp, 1 to 75 kva . The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo P�PFkEIM cq� Cityof Anaheim o� io Building Division . F z �o°LADED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering,Final (714) 765-5,126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pouf concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork), Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor.Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) . Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear. Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Mi., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mea:) Grease Interceptor " (Do not backfill unless sioned offi Sewer Water Engineering Backflow (Testable Only) Water Service