1920 N CLOUD CREST CIR (2)Permit Types
BLD ELE MEC PLM
X X
Permit Number: BLD2018-05174
Issued: 03/11/2019 C
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 176
Site Address: 1920 N CLOUD CREST CIR .
Legal Description: 'N TR,469'3. LOT 25
(714) 765 - 5153
Project Description: Photovoltaic System: Install new residential roof mounted solar system with (23) modules and (1) inverter.
Valuation: $15,939.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 1,103.07
People Associated with Project:
Owner NANCY A BING 1920 CLOUD CREST CIR ANAHEIM CA 92807-1211
Contractor VIVINT SOLAR DEVELOPER LLC 9847 PIONEER BLVD SANTA FE SPRINGS CA 90670
Permit Applicant ERIC CURTIS
Engineer JAMES M WALSH 1174 W KORADINE DR SOUTH JORDAN UT 84095
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Generators/Transformers -1 to 10 hp, 1 to
75 kva .
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit_combo
P�PFkEIM cq�
Cityof Anaheim o� io
Building Division . F z
�o°LADED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering,Final (714) 765-5,126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pouf concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork),
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor.Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing) .
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear.
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Mi., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mea:)
Grease Interceptor "
(Do not backfill unless sioned offi
Sewer
Water Engineering Backflow (Testable Only)
Water Service