2144 W CLOVER AVE (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2018-03522
Issued: 08/06/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 37
Site Address: 2144 W CLOVER AVE
Legal Description: N TR 2197 LOT 139
CI
200 SM-ANAHEIM>BLVD.
(714) 765 - 5153
EIM
Project Description: Reroof: Remove existing material, resheath as necessary and install (18) squares of composition shingles
on to house and detached garage, and (2) squares of BUR on to patio cover.
Valuation: $4,500.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 280.05
People Associated with Project:
Owner WEST CLOVER LLC 2144 W CLOVER AVE ANAHEIM CA 92801-1615
Permit Applicant VASSILI CHARALAMBOUS
Type
Electrical Fixtures
Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation andie6n;e null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. ibld_permit_comtio
J "
P�PNEIM CSC
City of Anaheim O� io
Building Division F i
u >
OECD)
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned7
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Ins tip
�� I T p Q G n
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
U0801 rzl�:n
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
ee s' e=WLC2
DATE:
L Ct
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Olaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service