Loading...
2144 W CLOVER AVE (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2018-03522 Issued: 08/06/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 37 Site Address: 2144 W CLOVER AVE Legal Description: N TR 2197 LOT 139 CI 200 SM-ANAHEIM>BLVD. (714) 765 - 5153 EIM Project Description: Reroof: Remove existing material, resheath as necessary and install (18) squares of composition shingles on to house and detached garage, and (2) squares of BUR on to patio cover. Valuation: $4,500.00 Construcion Types: N/A, , Total Fees paid for Permit: 280.05 People Associated with Project: Owner WEST CLOVER LLC 2144 W CLOVER AVE ANAHEIM CA 92801-1615 Permit Applicant VASSILI CHARALAMBOUS Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation andie6n;e null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ibld_permit_comtio J " P�PNEIM CSC City of Anaheim O� io Building Division F i u > OECD) Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned7 Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Ins tip �� I T p Q G n Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) U0801 rzl�:n 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have ee s' e=WLC2 DATE: L Ct 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Olaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service