Loading...
2222 E CLIFPARK WAY (2)P�PHEIM �.9< City of Anaheim D� �o Building Division i U > AD�NDED fah^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DA .E INSPECTOR All applicable items below must be signed before utilit '- released Final Gas Test Electrical Final Plumbing Final _ a anica /(QC{a Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been siane . Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sffianedo 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New ConstrucHon Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service